Juan de Fuca Cable Presented by: Sea Breeze Pacific

Slides:



Advertisements
Similar presentations
Electrical Infrastructure Design Considerations David Flood Head of Electrical Systems, Forewind Stakeholder Workshops, April 2010.
Advertisements

Environmental Project Commitments The Alberta Experience
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
SkyPower Corp. PRESENTATION.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Strictly Private & Confidential 1 Tunis, 21 October 2009 Nur Energie Solar Development in the Mediterranean Basin.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
OVERVIEW – SUNDANCE WIND PROJECT PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND Ron Percival Avro Wind Energy Inc. October, 2014.
TransCanada Corporation (TSX/NYSE: TRP)
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Energy From the Severn Estuary Trinity College, Bristol, March 10 th 2007.
New Energy Corporation New Energy is a manufacturer of in-stream hydro power generation equipment Commercializing the EnCurrent vertical axis hydro turbine.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Beyond stereotypes – ecological and landscape solutions for offshore wind farms Dr Maggie Hill Countryside Council for Wales.
Environmental Assessment of Marine Renewable Energy Presentation to Pre-BIC meeting 24 th June 2010 Andrew Casebow Chris Green.
American Samoa Ephraim Temple UH Sea Grant American Samoa Community College.
HVDC-LIGHT Technology
Harnessing the Power of Waves and Tides
Rod Lenfest Transmission & Business Development The Impact of Technology Selection on Stakeholder Acceptance &
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Clean, Reliable, and Low Cost Energy for the for theCaribbean December, 2006 Confidential.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
Centrica – An Energy Utility Perspective Gearόid Lane Director, British Gas New Energy 29 th April 2009.
Social aspects GROUP 3  Charlotte Huber  Nancy J. Guarderas H.  Robert Pajdak.
Claire Gibson, Wave Hub General Manager 19 February 2013
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
Current Obstacles to Wide Implementation of Wave Energy Alex Ruane 10/27/05.
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
Georgia’s Off-shore Wind Opportunities Presented by Bill Bulpitt and Rita Kilpatrick for Tybee Island City Council March 27, 2008.
Public Information CentrePartners in Powerful Communities Welcome to our Public Information Centre.
THE OFFSHORE SITUATION IN GREECE Municipality of Corfu.
HVDC LIGHT TECHNOLOGY BY: D.SINDHUSHA G.SOWJNAYA B.MEHER DIVYA GMRIT.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Sustainability at Western Harbor Malmö, Sweden October 11, 2006.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
MMS Alternative Energy Program November 28, 2007.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Identifying Information Needs and Research Priorities for the North Aleutian Basin of Alaska Kirk LaGory North Aleutian Basin Information Status and Research.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
 Transmitting power at high voltage and in DC form instead of AC is a new technology proven to be economic and simple in operation which is HVDC transmission.
Identifying Information Needs and Research Priorities for the North Aleutian Basin of Alaska Fish and Fisheries Working Group John Hayse North Aleutian.
PRESENTATION & DISCUSSION Dave Bergen Southold Town Trustee July 18, 2015.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Benefits of the East West Interconnector
Long Island’s Offshore Wind Farm David Tobias Project Evaluation.
Kyoko Abe 16 March Outlines Concept Technology Market Status Potentials Projection.
BritNed Investing in interconnection capacity Damian Bach France-UK-Ireland Stakeholder Group meeting 4 th July 2008, Sellindge, Kent.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
© ABB Power Technologies :\PTP\GF-CC\Arbetsmaterial Jan-16 HVDC Light – ABB’s technology for invisible transmission Per Haugland Head of ABB Power.
Potential Impacts on Biodiversity and Livelihoods Win Maung Chairman Myanmar Environment Institute (MEI)
Juan de Fuca Cable Project Presented by: Sea Breeze April 25, 2006.
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
Isis Johnson Environmental Protection Specialist Bureau of Ocean Energy Management Office of Renewable Energy Programs April 28, 2016.
Biological effects of anthropogenic activities Eugeniusz Andrulewicz Department of Fisheries Oceanography and Marine Ecology Sea Fisheries Institute, Gdynia,
HVDC Transmission.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Where Emera Operates 2.5 million customers 7,400 employees
Bringing Offshore Wind to New England’s Shore Restructuring Roundtable
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
COSA Committee Meeting
India Smart Grid Week, 2016 Yogendra Patwardhan
Construction Management & Inspection
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
HVDC Transmission Systems:
Presentation transcript:

Juan de Fuca Cable Presented by: Sea Breeze Pacific Juan de Fuca Cable, LP

Presentation Overview Introduction Need for Project Project Description Environmental Considerations Permitting

Introduction Sea Breeze Pacific Juan de Fuca Cable, LP (“Sea Breeze Pacific”) is proposing to construct and have operated a 550 MW High Voltage Direct Current (“HVDC”) Light™ transmission line between Port Angeles, Washington State, and the Greater Victoria Area, B.C.

Project Proponent and Team Sea Breeze Pacific Juan de Fuca Cable, LP is a joint venture between Sea Breeze Power Corp., and Boundless Energy, LLC.

Sea Breeze Power Corp: Vancouver-based renewable energy company building both wind and run-of-river hydro electric projects. Boundless Energy LLC: Transmission and utility engineering company based in York Harbor, Maine. Originators of the “Neptune Regional Transmission System” HVDC concept and plan. ABB, Inc.: One of three companies in the world involved in large scale HVDC engineering. Design, manufacturing, and installation company, has completed major projects on every continent. Currently seven operating HVDC LightTM lines in the world. A 110 km line was just approved to link Finland with Estonia.

Need for the Project Opportunities to strengthen B.C. and Washington transmission grids and improve voltage stability Consideration of short-term and long-term power generation, supply and load demand conditions Open Season, in which utilities will competitively bid to use the line, will ultimately demonstrate need

Power Situation in the Pacific Northwest BC has high generation potential Many opportunities for electricity interchange Potential energy for transmission: More than 7000 MW in coastal B.C. 2000 MW in northern Alberta

Project Description HVDC Light™ Technology Location and Routing Installation and Construction

HVDC Light™ Technology A proven, state-of-the-art technology with low environmental impact and no fluctuating electro-magnetic field (EMF) Relatively low operating temperature, and non-liquid insulation AC and DC transmission cables. Two cables at far right are HVDC LightTM. Photo courtesy of ABB.

All cables would be buried – no overhead lines Approximate diametre of cable bundle: 16 cm on land 25 cm at sea Approximate temperature: 70°C in core 60°C on cable surface. Heat is equivalent to one 20 Watt light bulb per metre, or one 60 Watt light bulb every 3 metres. Rate of heat dissipation will depend on substrate. Gotland HVDC Light™ cables. Photo courtesy of ABB. All cables would be buried – no overhead lines

Location & Routing Would connect converter stations near existing substations in the Greater Victoria Area, B.C. and Port Angeles, Washington. Proposed terrestrial and underwater cable routes will be subject to Federal and Municipal regulations. Approximate lengths of cable: Greater Victoria to Port Angeles: 46 km Proposed length on B.C. side: 10 km Proposed length on WA side: 3 km Length at sea: 33 km

Proposed marine corridor – approx. 500m wide

Project planning and studies will take into account consultation with interested and affected parties, and will consider: Environmental factors Fisheries Transportation First Nations interests Aesthetic factors Commercial use Recreational use

Installation & Construction Installation – Offshore/Marine A ship-towed machine would create trenches, into which the HVDC cable system would be buried. The cable comes from the factory as one continuous length. The trenches would be deep enough to prevent disturbance by ship anchors, etc. Anticipated depth of burial is approximately 1 to 1.5 metres.

Artistic rendering of marine cable installation

Overview of cable installation foreshore and offshore

Installation – Marine to Terrestrial Transition Horizontal directional drilling (HDD) would be used to avoid adverse environmental effects. A versatile technology that uses a precision-guided directional system to bore a hole through soil or rock. Disturbance to marine foreshore areas is minimized by drilling underneath them. As a result, the intertidal zone would be undisturbed by cable installation.

Installation – Terrestrial Beyond the transition zone, buried HVDC cables would connect to a converter station. Proposed path is within a public road right-of-way Diagram of cable installation beneath road right-of-way

Converter Stations A converter station would be needed to convert DC to AC and vice versa. Converter stations can be designed to fit into their surroundings.

Environmental Considerations Choice of Technology Choice of Installation Techniques Noise and Traffic Considerations Environmental Studies and Consultation

HVDC LightTM Technology – Environmental aspects No fluctuating electromagnetic field:  expected to have minimal to no effect on the sensory organs of marine mammals and fish. Cables are not liquid-cooled:  do not pose any danger of coolant leaks or spills. Relatively low operating temperature:  expected to have low impact on the local heat regime No adverse impact anticipated to fisheries resources during operation.

Choice of Installation Techniques – Environmental aspects Buried submarine and terrestrial cable Disruption to marine floor is expected to be local and short-term Directional drilling avoids damage to natural and cultural features by drilling deep underneath them.

Noise & Traffic Considerations Installation Noise and visual impacts related to the cable would be temporary and limited to construction  similar to the installation of a buried telephone cable. Once cable is installed, maintenance activity would be minimal. Converter stations Design could include features to minimize noise Outer structure could be designed by architects to minimize visual impact

Environmental Studies and Consultation Proposed Marine Studies Proposed Terrestrial Studies Physical: Bathymetry Geotechnical Terrain and obstacles Archaeology - Offshore core sampling Biological Mammals Fisheries Birds Nearshore ecosystem Socio-economic studies - Traditional use and knowledge Physical: Geotechnical Hydrology Archaeology Noise Biological Wildlife and avifauna Vegetation Socio-economic studies - Traditional use and knowledge Sea Breeze is committed to a high standard of consultation with any individuals or groups who may be affected by the Project.

Expected Timeline 1. Terrestrial field studies: - Start June 2005; completion anticipated July 2005 Marine field studies: Start June 2005; completion anticipated August 2005 3. Permitting: Start September 2004; completion anticipated March 2006 4. Operational: The physical construction phase is expected to begin November 2006 and be completed by November 2007.

Permitting Final National Energy Board application is expected to be filed October 2005 and will include information to meet Canadian Environmental Assessment Act requirements. No Provincial permits required. Municipal permits will follow federal permit approvals.

Past Experience The Neptune Regional Transmission System, designed by Sea Breeze Pacific partners, has been fully permitted through all environmental processes. The system will start in New Jersey and, through micro-tunneling, bring one end of the 660 MW HVDC cable up into Long Island underneath Jones Beach, a popular local park. This line in the very populated New York area has had no public opposition.

Thank you