1.2.2 Design Charette By: C.J. Wyatt David Panyathong

Slides:



Advertisements
Similar presentations
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Advertisements

DANIEL CORMIER CAD II 3 RD.PD.. At the time many people did not believe it was technically possible to span the Golden Gate. But despite disbelief,
5.8 Scale Drawing and Models
Presented by NEORSD Richard J. Switalski, P.E. Presented by NEORSD Richard J. Switalski, P.E.
Santa Maria River Bridges Widening. Project Location.
The Erie Canal.
The Yangtze River A presentation of the Third-Longest River in the World.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
City Planner Career Information Copyright Texas Education Agency (TEA)
CANADIAN COAST GUARD AUXILIARY - PACIFIC PASSAGE PLANNING CANADIAN COAST GUARD AUXILIARY - PACIFIC February 2012.
Principles of Architecture and Construction
Gwinnett County’s Post Development Stormwater Management Program
Basketball Problem #2 SOLUTION B. Given: The Classroom Owen 241 Find: The number of basketballs required to fill this classroom.
1 Civil Engineering EG380 Colorado State University Dr. Robert N. Meroney Click on speaker, then click on title.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Golden Gate Bridge is found in Marin County, San Francisco.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Civil Engineering Jesse Byington. Civil engineering overview Civil engineering is one of the oldest types of engineering. It involves the design, construction.
1.Define zoning. 2.Define building codes. 3.List the key players in implementing CPTED. 4.List the two thresholds of review for new construction or redevelopment.
Tower Bridge.
 In ancient times, there were no machines to assist in transporting large stones for the building of pyramids  People had to get very large stones across.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Isles of Lake Hancock Homeowners Association, Inc. District 1 July 28, 2015.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
Power Generation 1. Tidal 2. Hydro 3. Wind 4. Solar 5. Nuclear 6. Fuel fossils 7. Geothermal.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Harbor Safety Committee of the San Francisco Bay Region Established by state law to prevent oil spills in San Francisco Bay by planning “for the safe navigation.
Talking Freight Seminar Series: Climate Change presented by Rob Hyman Cambridge Systematics, Inc. June 17, 2009 Gulf Coast Study Impacts of Climate Change.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
Changing Nature’s Course Tracy Morris David Trombley.
Offsite Detour analysis. Calculation of detour length Distance along SR = Distance along SR
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
Scotland, UK A Scottish Story Between the ports of Grangemouth and Falkirk the Forth & Clyde canal, was excavated in 1777 connecting the east coast of.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Tides. Tides The rise and fall of the ocean water levels along the coast are called tides. The amount of water in the ocean doesn’t change but moves in.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Interior Design License Requirements
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
URBAN DESIGN WHAT DOES URBAN MEAN?. URBAN DESIGN Urban means: relating to, or characteristic of a city or town.
SCALE MODEL PROBLEMS Monday 3/10. Sarah made a scale model of her pool that spans 12 inches. The actual pool spans 18 feet. ◦What is the scale of the.
There are 2 Types of Bridge Inspectors – Class B and Class A.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Interactions with the built and marine environment.
Assessing the Risk and Vulnerability of NH Coastal Communities to Sea Level Rise and Storm Surge FROM TIDES TO STORMS: PREPARING FOR NEW HAMPSHIRE’S FUTURE.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
Geometric Design: General Concept CE331 Transportation Engineering.
Main Channel Columbia River Channel is filled in to an unknown level with debris & sediment to mile 18 and maybe more. The Columbia River Jetty’s have.
ENGLISH Sofokleous Chara Civil Engineering. Civil engineering is a profession that deals with the design, construction and maintenance of the physical.
REDUCING ENGINEERING STANDARDS: GOOD or BAD? AASHTO Subcommittee on Design Albuquerque, NM July 14, 2008.
The Navajo Bridge. General Information Locates in the US state of Arizona and carries U.S route 89A Crosses the Colorado River at Marble Canyon Total.
PRESENTED BY : AARON OROCK CONCENTRATION : CONSTRUCTION ENG CLASS ET 493 FALL 2015 Instructor: Dr. Cris Koutsougeras Advisor: Dr. Mohamed Zeidan.
What does a Civil Engineer do?
R E N O V U S. S O L A R Town of Catlin Community Solar Farm May 12, 2016 Jon McNamara.
Design Charrette Naemal Bhatti, Roy Boon, Ethan Borer-Newton, Alexandra Eagan, Miles Greenblatt, Spencer Ha, Yong Yi Zhang, and Lauren Lyttle.
Lions, Tigers, Coast Guard Permits – Oh My!
Problem Solving Using Proportions
Spot Speed Study Lab 2 Instructor:
Beam bridge Truss bridge Arch bridge Suspension bridge
Scale drawing.
Place 5 Themes of Geography.
Existing Boat Facilities
CONSTRUCTION REGULATIONS AND CODES
Geometric Design: General Concept CE331 Transportation Engineering.
Environmental Protection Division
INTRODUCTION TO PORT DESIGN
Presentation transcript:

1.2.2 Design Charette By: C.J. Wyatt David Panyathong Amber Dannemiller Owen Sill Donald Jacobson Jesse Sopko

Scenario C- It has been decided that a two mile long bridge must be constructed to connect two areas along a coast. Officials believe this will promote tourism because it will connect two areas that are currently separated by a 30 minute drive. This bridge will span a wetland where the tides come in and out. Typically at a low tide much of the area is dry; however, a narrow channel remains navigable by small vessels except at extremely low tides. The average tidal range is around five feet. The development should also include a small community boat ramp, dock, and public facilities.

The 2 Mile Long Bridge The measurement of the length of the bridge is close to – 2.25 miles long (Driving length) Materials- Steel, Concrete, Water, Nuts&Bolts, Rebar.

Differences in Bridge Designs We overall chose our previous slide's design, but we had differences in the overall design. Some of us wanted to use a “draw bridge” for boats going underneath the bridge so there would be an unlimited height in what size boats could go underneath. That would overall slow down traffic because its a one lane bridge plus the “draw bridge” would make it even slower causing back ups.

Individual Job Amber – Environmental Engineer Makes sure the bridge is safe for the environment C.J. - Cost Estimator Budgets the job, estimates the overall cost of the job. Jesse – Bridge Inspector/ Code Enforcement Inspects the bridge, makes sure it's safe Donald – Structural Engineer Designs/Tests the overall bridge before the actual bridge is built. Owen – Construction Manager Keeps the job under budget, directs the workers. David – Urban Planner Decides location and how it affects the community.

Concept map