The Status of the Hubble Space Telescope 2014 STScI Calibration Workshop Helmut Jenkner.

Slides:



Advertisements
Similar presentations
General Astrophysics with TPF-C David Spergel Princeton.
Advertisements

Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
Exoplanet Atmospheres: Insights via the Hubble Space Telescope Nicolas Crouzet 1, Drake Deming 2, Peter R. McCullough 1 1 Space Telescope Science Institute.
Hubble Science Briefing The “Monkey’s Tooth?” Hubble’s new infrared view of a star-forming pillar 1 April 3, 2014 Zolt Levay ・ Hubble Heritage STScI.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
The Hubble Space Telescope (H.S.T.) By Jason Hunyar.
1 HST Cycle 12 TAC Results Bob Williams TIPS – 17 April 2003.
CLASH: Cluster Lensing And Supernova survey with Hubble ACS Parallels WFC3 Parallels 6 arcmin. = 2.2 z=0.5 Footprints of HST Cameras: ACS FOV in.
Hubble Space Telescope Goddard Space Flight Center Hubble Ultra-Wide-Field Imager (HUFI) David Leckrone Senior Project Scientist for HST December 16, 2001.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
Chandra Director’s Office Chandra’s Second Decade  Lifetime: ≥15-20 years (RJB’s presentation)  Is all key Chandra science enabled by current proposal.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Introduction to Spitzer and some applications Data products Pipelines Preliminary work K. Nilsson, J.M. Castro Cerón, J.P.U. Fynbo, D.J. Watson, J. Hjorth.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
A student project. What is a space telescope?  A space telescope is a telescope that orbits around Earth in space.  Like other telescopes they take.
The Hubble Telescope Ashley Field. Hubble Facts The Hubble Telescope was launched into low Earth orbit in 1990 Four main instruments observe in the near.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
Margaret Meixner (STScI, JHU) March 7, 2013
Jan 24, 2013Dan Coe - STScI1. Hubble is now observing galaxies 97% of the way back to the Big Bang, during the first 500 million years Jan 24, 2013Dan.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
1 HST Status Cycle 14 TAC/Panels 14 March Telescope and Instrument Status Telescope and support systems are all working well – no unexpected limitations.
LIVE INTERACTIVE YOUR DESKTOP January 28, 2010 NASA/NSTA Web Seminar Series How Telescopes Have Changed Our View of the Universe Hubble’s Universe:
W. M. Keck Observatory Subaru Users’ Meeting
The Big Bang and The Expanding Universe Dr. Michael J Passow.
Fine Guidance Sensor 2010 HST Calibration Work Shop Ed Nelan Barbara McArthur STScI.
PLUTO AND THE KUIPER BELT Beyond Neptune, the most distant major planet, are a large number of smaller objects, all of which currently known are smaller.
Extrasolar planets. Detection methods 1.Pulsar timing 2.Astrometric wobble 3.Radial velocities 4.Gravitational lensing 5.Transits 6.Dust disks 7.Direct.
Hubble: Back in Business and Better Than Ever Dr. Frank Summers Space Telescope Science Institute September 9, 2009.
Printed by ACS 2 Gyro Mode Data Analysis Cheryl Pavlovsky, Marco Sirianni, Ken Sembach, ACS Instrument Team and the 2 Gyro Mode Team.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
Understanding Persistence: A 3D Trap Map of an H2RG Imaging Sensor
CCDs in space: the effects of radiation on Hubble’s Advanced Camera for Surveys (ACS) Max Mutchler, David Golimowski (Space Telescope Science Institute),
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
Jennifer Lotz Hubble Science Briefing Jan. 16, 2014 Exploring the Depths of the Universe.
Science with the new HST after SM4 WFC3 slitless spectroscopy Harald Kuntschner Martin Kümmel, Jeremy R. Walsh (ST-ECF) WFC3-team at STScI and NASA.
Hubble Science Briefing
Exploring the far reaches of the universe. Hubble Telescope By Blake Shaffer.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
Weak Lensing from Space with SNAP Alexandre Refregier (IoA) Richard Ellis (Caltech) David Bacon (IoA) Richard Massey (IoA) Gary Bernstein (Michigan) Tim.
The Status of HST/WFC3 John W. MacKenty Space Telescope Science Institute 12 August 2014 Calibration Workshop.
Telescopes Key Words Optical Telescopes: make use of electromagnetic radiation in the range of visible light Refraction Telescopes: use lenses Reflecting.
Welcome to the First CLASH Science Team Meeting September 20 – 21, 2010 Granada, Spain.
Two-Gyro Science Impact and Observer Information Ken Sembach STUC Meeting 18-November November-2004.
The B-V colors and photometric variability of Nix and Hydra, Pluto’s two small satellites Max Mutchler (STScI) S. Alan Stern (SwRI) Hal Weaver (JHU/APL)
The Future of the Hubble Space Telescope Steven Beckwith April 25, 2005 Space Telescope Science Institute.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Seeing the First Light The James Webb Space Telescope Amber N. Straughn Lead Scientist for JWST E/PO Paul Geithner JWST Observatory Manager jwst.nasa.gov.
Hubble Space Telescope Brad Whitmore 25 April 2012.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
FGS Astrometry in 2 Gyro Mode E. P. Nelan STScI B. E. McArthur McDonald Observatory, U. of Texas.
The European Hubble Space Telescope Legacy Archive Wolfram Freudling.
1 WFC3 Science Data Volume  Data Volume Estimates for WFC3 Operations ISR WFC ; Lisse, Henry, Knezek, Hanley; 3/27/2001 ISR WFC ; Lisse,
Hubble Space Telescope By Brittany Bellows Physics 1040 – Spring 2011.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
Introduction: Goals for JWST Transit Meeting C. Beichman Jonathan Lunine March 11, 2014.
The Hubble Space Telescope (H.S.T.)
Faculty meeting - 13 Dec 2006 The Hubble Legacy Archive Harald Kuntschner & ST-ECF staff 13 December 2006.
26th October 2005 HST Calibration Workshop 1 The New GSC-II and it’s Use for HST Brian McLean Archive Sciences Branch.
Heliophysics MO&DA Program - November 13, Page 1 Notes from the Heliophysics MO&DA Program STEREO SWG Meeting Chuck Holmes “Director, Heliophysics.
NIRSpec Time Series Observations
JWST Science Policy & Science Parallels
The Hubble Telescope
Martin C. Weisskopf AAS 2011 May 23
James Webb Space Telescope
Update on Advancing Development of the ROLO Lunar Calibration System
Cycle 14 HST Time Allocation
Science Policies and Timeline
Presentation transcript:

The Status of the Hubble Space Telescope 2014 STScI Calibration Workshop Helmut Jenkner

Hubble is As Powerful As Ever Deep, precise, stable pan-chromatic imaging Slitted and slitless spectroscopy, coronagraphy, astrometry Life stories of galaxies Architecture of the universe Recipes for building planets Mysteries of dark matter and dark energy Births and deaths of stars STScI Calibration Workshop - August 20142

Current Status All science instruments are performing well – ACS, COS, STIS, and WFC3 are being used for science Observatory subsystems in excellent working order Cycle 21 is progressing as planned – October 1, 2013 – September 30, 2014 Cycle 22 programs selected – Nominal start on October 1, 2014 – Already observing now for a small number of programs 24 th Anniversary on April 24, 2014 – Kicks off Hubble’s 25 th year STScI Calibration Workshop - August Visible WFPC Infrared WFC3/IR 2014

Challenging Observations Large Scales, New Techniques Frontier Fields – In progress – 6 x 2 x 70 orbits Multi-Cycle Treasury Programs – Completed in October 2013 – total of 2260 orbits New Horizons KBO Campaign – Search portion completed last week – 40 DD orbits, 126 C22 orbits – Orbit determination follow-up observations ongoing – 28 orbits Reverberation Mapping of NGC 5548 – Completed on July 27 – 1 orbit per day for 179 days WFC3 Spatial Scanning Observations – See presentations at this workshop Offset slew (“slot”) clearing for observations of bright variable objects STScI Calibration Workshop - August 20144

5 Cluster Blank Field 2 clusters per year x 3 years → 840 total orbits 1000 hours Spitzer DD time for ~26.5 ABmag in IRAC 3.6, 4.5 μm Brammer, VLT/Hawk-I K Hubble Frontier Fields Cycles (FY14-FY16) 6 strong-lensing clusters + 6 adjacent parallel fields 140 HST DD orbits per field pair ACS/ WFC3-IR in parallel ~ 29 ABmag in 7 bands

STScI Calibration Workshop - August 20146

7

2014 HST Senior Review Site Visit 8 Panchromatic Hubble Andromeda Treasury Program (PHAT) PI: J. Dalcanton 834 orbits Cosmic Assembly Near-Infrared Deep Extragalactic Legacy Survey Program (CANDELS) PI: S. Faber / H. Ferguson 750 orbits Cluster Lensing and Supernova Survey with Hubble (CLASH) PI: M. Postman 474 orbits MCT Supernova Follow-up PI: A. Riess 202 orbits HST Multi-Cycle Treasury Programs Cycles 18, 19, & 20

New Horizons KBO Search STScI Calibration Workshop - August 20149

If all works as planned, Hubble should be able to peer even deeper into space and farther back in time than it has before. The telescope, circling some 350 miles above Earth, is expected to perform for at least five more years. That should be long enough to bridge the gap until its successor, the James Webb Space Telescope, is sent to a perch almost a million miles from Earth. Monday, May 25, 2009 Monday, August 11, STScI Calibration Workshop - August

Hubble 2020 Vision Statement STScI Calibration Workshop - August Operate Hubble out to 2020 or beyond so that there is at least one year of overlapping science observations with the James Webb Space Telescope, performed in a manner that maximizes the science return of both observatories by taking full advantage of Hubble's unique capabilities and the astronomical community's scientific curiosity. An operating observatory Capable science instruments Scientific drivers (demand) Adequate staffing and user support Appropriate funding Teamwork (multi-level) As long as it remains scientifically productive How long will Hubble continue to operate? What is needed to keep Hubble scientifically productive?

The Road to Current StatusExpectations Observatory Health Excellent Good reliability of science instruments and major systems through 2020 (NESC) Known modes of degradation Orbit DecayNominal orbit Orbit stable until mid-2030s Scheduling Efficiency ~50%, near all-time high Efficiency declines to ~40-45% upon transition to reduced-gyro mode Scientific Productivity ~800 papers per year; ~40 PhDs per year Publication rate remains high New discoveries continue Demand >1000 proposals per year; 6:1 oversubscription (time) No near-term decrease expected StaffingLean operations Work efficiencies are harder to achieve beyond FY16 without loss of capability Mission Funding $98.3M/year total budget (~2/3 ops, ~1/3 grants+EPO) Flat mission budget presents challenges Grant Funding $28.6M/year in grants to the community Grant funding is stable through FY15-FY16 May decline as JWST grants start STScI Calibration Workshop - August

Observatory Status STScI Calibration Workshop - August Observatory Systems Status Science Instruments ACS Operating well. Charge transfer degradation corrections in place for WFC. COS New blue mode extends to 90 nm. Far-UV sensitivity remains excellent (initial decline has arrested). STISOperating well. Imaging, spectroscopy, coronagraphy. NICMOSSafed, warm. WFC3 Excellent stability, sensitivity. Spatial scanning available. Charge transfer corrections for UVIS channel. Persistence maps available for IR channel. Fine Guidance SensorsSlow degradation being monitored, understood. Electrical and Power SystemBatteries and solar arrays - no serious issues. Pointing and Control System Gyro 5 ceased operation on March 7, Overall complement of gyros remains robust. SI Control and Data HandlingLockups are rare (1-2x per year) and understood. Thermal Control SystemExcellent, no serious issues.

HST Gyro Locations – SM4 STScI Calibration Workshop - August Rate Sensing Units

Gyro 5 STScI Calibration Workshop - August On March 7, 2014 Gyro 5 failed – Failure was expected following a flex lead failure on February 22 – Gyro 5 has “standard” flex lead – Not a mission lifetime limiting event HST has 6 gyros – Well-developed plan is in place for eventual failure of any gyro – Continue in 3-gyro mode as long as possible to maximize science Flex Lead Heaters Flex Lead HST 64-PM Fluid Floated RIG Rate Gyro Electronics Control Unit (ECU) Rate Sensor Unit (RSU)

Subsystem Reliability NASA Engineering and Safety Center (NESC) reliability estimates for Hubble’s instruments and primary subsystems support a 2020 vision. The recent failure of Gyro 5 does not substantively change the overall gyro lifetime assessment. STScI Calibration Workshop - August InstrumentsSubsystems

Hubble Science Output 12,303 science papers based on HST data, with more than 525,000 citations 13,327 individuals have (co)authored a paper based on HST data More than 500 PhD theses have been based on HST data 17 Year of Publication Refereed Papers per Year STScI Calibration Workshop - August 2014

Cycle Number of Proposals per Cycle Post-SM4 Intense Proposal Pressure For Cycle 22 there were 1135 proposals submitted >6000 different investigators have had approved programs to date 18STScI Calibration Workshop - August 2014

High Scheduling Efficiency STScI Calibration Workshop - August Feb 2014Mar 2013 Weekly calendars % Efficiency Science program scheduling is challenging o Large programs with strict timing/orientation constraints (e.g., Frontier Fields) o Parallel observations (coordinated and pure) o Targets of opportunity (~150 activated since SM4) o Quick-turnaround DD programs (rare/high-impact science opportunities) Scheduling efficiency of 50% is substantially higher than original goal of ~35%

29% Grants to Observers 33% GFSC Flight Operations & Sustaining Engineering 33.5% STScI Science Operations 4.5% STScI EPO HST Budget ($98.3M) Operations staff is half the size it was ~12 years ago Note: Even a flat funding profile of $98.3M per year will require reductions in personnel or cuts to science grant funding. Cy18 – $27.7M Cy19 – $28.4M Cy20 – $30.1M Cy21 – $28.6M STScI Calibration Workshop - August

21 No Scan Scanned Hubble may be 24 years old, but its best years are still ahead… STScI Calibration Workshop - August