Performance Monitoring & Benchmarking in an Electricity Sector in Transition Being presentation made by Engr. (Dr.) J. O. Makoju – MD/CE PHCN Plc at the.

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

Bosnia and Herzegovina
Privatised Electricity Distribution Companies: A Bankable Prospect? A Presentation at the Bankers Committee/BPE Technical Workshop on Nigerian Power Sector.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Slide 1 Leveraging GIS to improve efficiencies and reduce costs at North Delhi Power Ltd Arup Ghosh Chief Technical Officer North Delhi Power Ltd (Joint.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Implementation of Prepayment System in Mozambique E D M PREPAYMENT SYSTEM.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
1 COST OF SERVICE OBJECTIVES & METHODOLOGY Utah Cost of Service Taskforce May 23, 2005 Dave Taylor.
1 A Review of Potential Gains from Reforms ECRA Workshop 6 November 2006 Dr Brian Wharmby Independent Consultant, former Technical Director of Ofgem
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
2015/06/091 Overview of Maintenance & Infrastructure Delivery of Eskom Overview of Maintenance & Infrastructure Delivery of Eskom Eng Logan Pillay Eskom.
Promoting Energy Efficiency In Buildings in Developing countries.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
1 PREPAYMENT METERING IN RURAL UAE AREAS Prof. Dr. E. El-Shirbeeny Electric Power Research Laboratory Abu Dhabi Water & Electricity Authority ADWEAADWEA.
Effective Oversight of the Accounting System
Conservation & Demand Management July 2004 – September 2007 Joyce McLean Director, Strategic Issues Toronto Hydro
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Leaders in the design, implementation and operation of markets for electricity, gas and water. Establishing standardised reporting for Water and Waste.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Paying for Load Growth and New Large Loads September 24, 2007 | Presented by: Joe Mancinelli American Public Power Association Business & Financial Conference.
The Smart Grid: A Brief Introduction Qinran Hu Ph.D. Candidate Jun 12 th, 2014 Knoxville, Tennessee.
1  The IPM model projects increases in electricity prices as a result of the RGGI policy scenarios which, by themselves, would increase the household.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Overview What's is micro grid Over view of electric grid
The strategy for improved electricity distribution maintenance 9 June 2008.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
Joseph M. Forson & Kwabena Duah ELECTRICITY COMPANY OF GHANA PREPAYMENT IN GHANA Technical & Accounting Related Developments.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
By, K Keerthi sheela, T V V S Lakshmi, K Suresh kumar.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
Steady State Analysis Of A Microgrid Connected To A Power System
© 2014 IBM Corporation Does your Cloud have a Silver Lining ? The adoption of Cloud in Grid Operations of Electric Distribution Utilities Kieran McLoughlin.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
The AMI Advantage Presented by Keith Brooks. Located in North Idaho We serve 25,000 meters 2,000 miles of power lines 73 employees Service territory has.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Metering Americas April 24, 2006 Advanced Metering.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
The Company Bureau of Public Enterprises Transmission Company of Nigeria The Role of The Management Contractor For TCN The Company Brian Wales and Geoff.
Low-Income Energy Assistance Program (LEAP) Lenore Dougan, Policy Advisor Regulatory Policy Ontario Energy Board Presentation to the Rental Housing Advisory.
ATC&C “ATC&C Loss The Aggregate Technical, Commercial, and Collections Loss. This loss is the difference between the amount of electricity received by.
Jon Sibley Director, Energy and Waste Policy
Chairman of the Board and CEO,
Narragansett Electric Rate Classes
in Smart Metering Solutions
The Transition to a High DER Future
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
EV charging – a grid perspective
City of Lebanon, Missouri Electric Department
POWER, AUTOMATION AND INDUSTRIALIZATION: THE NIGERIAN EXPERIENCE BY STANLEY OKIY B.Tech (RSUST), M.Eng (UNIBEN), MPA (UNIBEN), & Engr. DR. C.C.
Background The electrification programme was started by Eskom during the late 1980’s It was further refined by the National Electrification Forum.
The Electricity Sector in Mozambique
Anna Garcia Air Innovations Conference August 2004
The Electricity Sector in Mozambique
Presentation transcript:

Performance Monitoring & Benchmarking in an Electricity Sector in Transition Being presentation made by Engr. (Dr.) J. O. Makoju – MD/CE PHCN Plc at the World Bank 2006 Energy Week in Washington DC 6th – 10th March, 2006

2

3 About Nigeria  Located in West Africa  Total area of ~ 923,770 sq km (about the same territory as France & Germany combined).  Climate varies from equatorial (in the south), tropical (in the central area) and arid (up north).  Population of over 130 million people (multiethnic, multicultural, secular society) with an average pop. growth rate of ~3% p.a.

4  Perhaps the single most profound step taken under the reform process has been the internal unbundling & decentralization of PHCN’s operations  NBUs have been operating as semi autonomous units over the past 2yrs (while they await full corporatization in April 2006).  With increased autonomy came the need for greater accountability; performance monitoring & benchmarking. Sector Reform (on-going)

5 PHCN’s Benchmarking & Performance Monitoring Initiatives

6 Based on realistic expectations rather than international benchmarks Challenges in the local environment taken into account (Weak/ fragile electricity infrastructure; Network limitations etc) Customer Service Charter also taken into consideration Target Setting

7 A consultative approach is adopted in target setting (Targets are agreed with the NBUs not “handed down”). Adjustments are made where necessary based on the peculiar situation of an NBU. Targets are monitored by the Planning & Strategy Dept./ Market Operator Ranking circulated at the end of each month Target Setting………………………cont’d

8 Some KPIs for the Generation NBUs  Generation Unit Cost - Total Expenditure (Naira) Total Energy Delivered (KWH)  Generation Utilization Index - Actual Generation (MW) Available Capacity (MW)  Capacity Utilization Index - Available Capacity (MW) Installed Capacity (MW)  Fuel Cost per Unit Gen.- Total Cost of Fuel (Naira) Total Energy Generated (MWH)

9 Staff Cost Index - Total Expenditure (Naira) Number of Employees Staff Productivity Index - Total Energy Delivered (MWH) Number of Employees Breakdown Mtce. Index- No of Breakdown defects rectified No of Breakdown defects reported Plant Reliability Index - Time of Reporting Period Total Down time of unavailable Units KPIs for the Generation NBUs …………cont’d

10 Some Performance Monitoring Charts Target Maintenance Index Chart (Jan – Dec 2005) Reliability Index Chart (Jan – Dec 2005)

11 Some KPIs for Transmission Grid Loss Ratio - Energy dispatched to distribution Energy Received from Generation Transformer Cap. Utilization - Transformer Max. Load Installed Capacity Transmission Cost Index - Total Monthly Expenditure Energy Received from Generation Staff Productivity - Energy Received from Generation Ave. no. of employees

12 Some KPIs for Transmission…………………..cont’d Dispatch Unit Cost - Total Operation Expenditure (Naira) Energy Delivered to Distribution Transmission Losses - Energy sent out from PS (MW) – Energy delivered Energy sent out from P.S (MW)

13 Some KPIs for the Distribution NBUs Fault Clearance Index - Total faults Cleared Total faults reported Collection Efficiency - Total Monthly Cash Collection (Naira) Monthly Billing Revenue (Naira) Capacity Utilization Index - Maximum Monthly Load (MW) Installed Capacity (MW) Metering Ratio - Total no. of Customers metered Total number of customers Customer Response Time - Time from customer enquiries/ complaints To time of resolution

14  Has triggered various innovations by the NBUs  Helped to build up managerial capacity  More efficient resource allocation  NBUs have a foretaste of “full blown” reform (as the now “compete” against each other)  Now more willing to embrace new ideas eg: innovations under CREST Impact of Performance Monitoring / Benchmarking

15  Commercial Reorientation for Electricity Sector Tool Kit (CREST)  Designed to address some of the downstream issues of the Industry (metering, billing, revenue collection, customer care etc).  Commenced in 2003 More About the CREST Programme

16 Distribution Efficiency Enhancement Initiatives under CREST − High Voltage Distribution System (HVDS) − High Voltage Panel Metering − Customer Care Centres − Rapid Response Vehicle − Spot Billing − Scratch Card system − Split pre prepayment meters. − Performance rewarding initiative

17 High Voltage Distribution System in Other Distribution Business Units (DBUs) (iv) HVDS – Substation Kano DBU ( ii) HVDS – Substation Eko DBU(iii) HVDS – Substation Ikeja DBU(i) HVDS – Substation Ibadan DBU (v) HVDS – LV Distribution using insulated cables + LV Distribution Board Kano DBU

18 HVDS – SUCCESS STORY ACROSS THE BUSINESS UNITS BENEFITSBEFORE-HVDSAFTER-HVDS Improved Reliability3 Days ON 1 Day OFF Unit load Shedding All customers ON 24/7 Reduction in LV Reticulation Route Length 1200m (16 spans) max/Upriser200m(4 spans) max/Upriser Improved Voltage Profile200V maximum 140V minimum 223V maximum 213 minimum Customers satisfactionRegular complaints from the areas where the HVDS was implemented Near Zero complaints from the areas after implementation Technical Loss Reduction achieved in one of the Business unit 40.19KW0.05KW (negligible)

19 High Voltage Metering In-door HT Panel Meter Out Door HT Panel Meter

20 HT Panel Metering Success story monthly revenue improvement across the business units

21 Split Pre-Payment Meters – Mambolo Abuja

22 Telephone vending possible Internet vending possible More care of customer is not required Scratch Card Initiative 20 Digit Codes

23 Pre-Payment Meters Success Story at Mambolo Abuja No more unbalanced load due to disconnection and re- connection of customer No more bills and debt accumulation Commercial Losses reduced Improved relationship with customers (no bad reading, no disconnection and re-connection fees) Customer manages his consumption Up-front payment

24 TYPICAL CASH COLLECTION PERFORMANCE REPORT ABUJA ZONE: JAN 2003 TO DECEMBER 2005

25 Rapid Response Vehicle - Abuja

26 Customer Care Center Garki - Abuja

27

28 Naira Yield 2001: N1.87/Kwh Naira Yield 2005: N3.23/Kwh

29

30 Consolidating on the Gains  Sector reform leading to privatisation will ensure that the gains made are improved upon (Privatization to commence in 2006—2GenCos and 2 DisCos)  PPP initiatives being introduced with the corporatization of PHCN in April, 2006  The outsourcing programme will run parallel to the privatization programme and is designed to add value to the DisCos and significantly improve their financial positions

31 Conclusion  The Nigerian power sector is gradually recovering from two decades of neglect (the pace may be slow but a consistent upward trend has clearly emerged)  Target Setting, Performance Monitoring & Benchmarking have been key tools in this transformation process  Finally, we must commend the WB for the support/ assistance of the on-going power sector reform programme through projects such as the NTDP; CREST and more recently the NEDP.

32 Thank you for your attention