Regional Transit to Lower Manhattan Initial recommendations for a transportation plan for Lower Manhattan Presentation for Discussion to the Civic Alliance.

Slides:



Advertisements
Similar presentations
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Index The Region: 7 Av IRT – 1, 2, 3, 9 8 Av IND – A, C, E 8 Av IND – Extended Downtown: 7 Av IRT – 1, 2, 3, 9 8 Av IND – A, C, E 8 Av IND – Extended.
Index The Region: East Tunnel 8 Av / Fulton St IND – Completed8 Av / Fulton St IND – Completed 8 Av / Fulton St IND – Service8 Av / Fulton St IND – Service.
Index The Region: Regional Transit West East North West Side Access Downtown: Transit Lines Catchment Areas BACKNEXT INDEXEND Lower Manhattan Transit.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
CENTRAL CORRIDOR TRANSIT ACCESS STUDY Citizens for Modern Transit March 27, 2014.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
BACKNEXT INDEXEND WTC Ground Level How compatible is the PATH- Lex connection with the current plans for the redevelopment of the World Trade Center site?
Index The Region: Newark to Pelham Downtown: Lex Av IRT – 4, 5, 6 PATH PATH & Lex Av IRT – 6 Fulton Street Basic Alignment 2.8 BACKNEXT INDEXEND PATH-Lex.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
Public Information Sessions November 30, 2010: City Center at Oyster Point December 1, 2010: HRT Norfolk.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
Waterbury Branch Line Improvements opportunities to support sustainable development Tom Maziarz, Chief of Planning Connecticut Department of Transportation.
Penn Station Metro-Hub A Short Term Action Plan Prepared by Regional Rail Working Group Empire State Passengers Association Committee for Better Transit.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Morris County Sam Powell Jennifer Lee. Introduction Morris County is located in Northern New Jersey, 25 miles west of New York City Affluent County Recent.
SUBWAY SYSTEM IN NEW YORK CITY The Magical Subway.
Urban Rapid Transit John Dulin Garrett Page Surbhi Kapoor.
Center City Access Strategy A Transportation Vision for Growth and Access.
Implementing aggressive PM reduction on non-road construction equipment in Lower Manhattan Transportation Land Use, Planning and Air Quality 2007 Metropolitan.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
1 Patriot’s Crossing  PROVIDES MOST REGIONAL CONGESTION RELIEF  UNIQUELY POSITIONED TO SUPPORT REGIONAL ECONOMIC GROWTH  IMPROVING TOTAL REGIONAL CONNECTIVITY.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
BRT in Pittsburgh: Martin Luther King, Jr. East Busway
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Airport Systems Planning & Design / RdN Airport and Airline Access Dr. Richard de Neufville Professor of Systems Engineering and Civil and Environmental.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
An Eastbank Initiative An Eastbank Initiative. City Vision Portland City Council 2001.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
City and County of San Francisco Mayor’s Transportation Task Force: Draft Findings and Recommendations Presentation from the San Francisco Controller’s.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Valley Metro Update Open House and Public Hearing March 9, 2007.
The Reno Streetcar March 8, 2016 RTC 2040 Regional Transportation Plan Economic Development Forum.
Report Findings Jeffrey M. Zupan & Richard E. Barone NYMTC PFAC – April 21, 2011.
Northern Lights Express Minneapolis/Duluth-Superior Passenger Rail Alliance February 24, Northern Lights Express Minneapolis/Duluth-Superior Passenger.
BROOKLYN BRIDGE PARK micah sherman daniel martinez.
Proposed Route Modifications
#7 Extension to Secaucus
Regional Roads Committee
Airport and Ground Access Choice Modeling
Center City Connector 101.
Introducing the Solution to LA’s Airport Congestion Problem
Regional Rail What is Missing? Metro-North NJ Transit LIRR
M14A/D Select Bus Service
Center City Connector Fall Open House Presenter: Ethan Melone,
Presentation transcript:

Regional Transit to Lower Manhattan Initial recommendations for a transportation plan for Lower Manhattan Presentation for Discussion to the Civic Alliance to Rebuild Downtown DRAFT

Objectives Rebuild what was destroyed Upgrade better and quickly to restore confidence Create a more attractive environment for travel to and within Lower Manhattan Provide improved access from poorly served markets within and beyond Manhattan

Categories of Transportation Improvements In this presentation –Short-term transit improvements –Longer-term transit improvements –Off-site transit improvements within Lower Manhattan Future presentations –Improvements related to the design of he WTC site –Treatment of West Street –Street Management –Fulton Street Corridor

Short-Term Recommendations for Regional Travel to Lower Manhattan To gain access to LM for more markets to make it more competitive with other areas –Expanded ferry service Long Island City to LM Demonstration of subsidized ferries Battery Marine Terminal –Shorter term subway improvements J train express Train to the AirTrain to the Plane –Pedestrian corridor at Grand Central to Lexington Avenue line

Short-term Ferry Service Lower Manhattan is ideal for ferries with waterfront a short walk to most destinations Numerous opportunities for relatively quick and inexpensive projects to assist access to Lower Manhattan. –LIRR to Long Island City and ferry to LM –Low subsidies for new services to keep fares down can create new ferry options for locations in Brooklyn, Queens, and Yonkers –Use of Battery Marine Terminal for new ferry services Recommendations: LIRR upgrade facilities and service in LIC. NYC should begin a demonstration of subsidized ferry service. Study of Battery Marine Terminal should be undertaken to accommodate added services.

Short-term Subway Improvements Creating express service on J line to LM possible using third track on some segments; reportedly, MTA is studying Kennedy Airport’s AirTrain will be connected to Howard Beach and A train soon; could provide interim good quality two-seat ride to Kennedy Airport Recommendation: Support MTA’s look at J train; support marketing of the 21 Century “trains to the planes”

New Pedestrian Connection from Grand Central Terminal to Lexington Avenue Line A new corridor to connect the lower level of Grand Central Terminal (GCT) to the Lexington Avenue line. Shortens walk to only subway at GCT to Lower Manhattan, making trip easier for suburban commuters Recommendation: Recommended for early implementation

Longer-term Recommendations for Regional Travel to Lower Manhattan PATH Extension to Newark Airport Regional Rail

PATH Extension to Newark Airport PATH in downtown Newark is about two miles from new Northeast Corridor station outside airport. Port Authority has begun study of cost and feasibility. In past, Port Authority concluded that it would be disruptive of PATH service Recommendation: Once Port Authority study complete it should be compared with other regional transportation investments to set priorities

Needed: Long-Term Solution for Regional Rail Access to Lower Manhattan LM long been at a competitive disadvantage because of absence of direct one-seat ride from suburbs Seek to improve access from all locations where substantial numbers of employees reside, especially those in top management positions. –Westchester and Connecticut –Long Island –Upper East Side –Upper West Side –New Jersey

Regional Rail Second Avenue Subway Brookfield Proposal RPA’s MetroLink

Second Avenue Subway After much lobbying by RPA and others (before 9/11), MTA agreed to extend the Second Avenue Subway (SAS) to Lower Manhattan, probably under Water Street SAS would provide two new services and decongest a third –Via Second Avenue and under Water Street –Via Second Avenue and into N/R Broadway line –Would decongest Lexington Avenue line, improving commute from upper east side and for Metro North commuters –Relieves West Side subways too Funds for SAS are uncertain

Brookfield Properties Proposal Proposed as relatively inexpensive and quicker to implement solution for access to LM Two-seat, transit service for LI commuters to LM using the Atlantic Branch of LIRR Brookfield would plug into existing A/C tracks and tunnel under the East River Brookfield estimates cost of $1.9 billion and time to complete of 5 years MTA studying proposal for impacts on existing subway riders; results not available yet RPA analysis suggests: –time savings for Long Islanders would be small –would speed trip from Kennedy to LM considerably

MetroLink RPA’s MetroLink proposal is an extension of the Second Avenue Subway: –Uses Atlantic Branch of the LIRR to serve Long Island commuters and create a one-seat ride to LM from Kennedy Airport –Links to Grand Central Terminal to serve Metro North commuters –Relieves crowding on Lexington Avenue and west side subway –A new tunnel under the East River connects to Second Avenue Subway in LM –MetroLink might be built from the south first, speeding up timetable for LM relief –Incremental cost over Brookfield Proposal could be relatively small

All Could Combine Best Features of Commuter Rail and Rapid Transit with Hybrid Vehicle Design Paris – RER and Meteor Line London – Jubilee Line Tokyo

How to Make a Decision on Best Long-Term Solution for Regional Rail Access to Lower Manhattan Recommendation: Use a portion of the $250 million of FEMA funds to perform a definitive study of the best way to improve access. Recommendation: Support study of funding options using new revenue sources such as East River tolls, MTA congestion pricing, other fees and taxes for LM and other transit improvements.

Recommendations Within Lower Manhattan To assist Lower Manhattan by giving the public confidence that it is recovering; and To make Lower Manhattan a more pleasant and lively place –Transit Centers Fulton/Broadway subway complex redesign PATH station complex Goods movement and waste removal –South Ferry station reconfiguration –Rector Connector

Transit Centers Two major clusters of subway lines exist in the vicinity of the WTC site and they will not be moved One is off the WTC site at Fulton/Broadway, consisting of 4/5, A/C, 2/3, and J/M/Z The other cluster is the on WTC site, consisting of PATH, 1/9, N/R, and E Each must be designed to: –create a sense of arrival and orientation –strong and inviting presence at surface –easier pedestrian movement among all stations –a more attractive environment

Concourse Pedestrian concourse designed to connect PATH/WTC and Fulton/Broadway Considerations –Design for passengers and goods/trash –Extend river to river, possibly along Fulton Street corridor

MTA’s Fulton/Broadway Complex MTA has redesigned Fulton/Broadway complex with street entrance on east side of Broadway Design intended to simplify maze-like underground, but designs have not been made public Recommendation: conditionally support redesign, subject to full briefing. Ask MTA to examine the cost and feasibility of extending underground concourse under Fulton Street to Water Street

PATH Complex and Permanent PATH station under the WTC Site Design of interconnecting facilities must await plans for the entire site Location of permanent PATH station at interim location is less costly than relocating it nearer Church Street Moving station to the east does not appear to shorten average walking distances LMDC architects’ designs may influence location Recommendation: Conditionally support permanent station at same location as interim, while seeking cost data from Port Authority and await LMDC-sponsored designs on the off-chance it could affect this recommendation.

Goods Movement and Waste Removal New development offers opportunity for new thinking Reliance on trucks is environmentally undesirable Recommendations: Port Authority should evaluate concourse for goods and waste removal; integrate within and beyond WTC site; include consideration of extended concourse, use of barges and PATH LMDC and NYC should evaluate goods movement and waste removal systems for all of LM.

South Ferry Station Poor design today at 1/9 station result of tight loop, which limits ability to leave both trains and station, creates hazards, reduces train capacity and adds to passenger delay Straightening out loop would solve each of these problems, speeding access to LM from the West Side by 10 minutes, and create a no-fare transfer with N/R at Whitehall station. Concerns expressed about impact on Battery Park Recommendation: construct the station, but minimize impacts on Battery Park.

Rector Connector Two stations are very close on adjacent blocks Connecting them would improve trip between parts of Brooklyn and west side south of Greenwich Village ADA requirements would make station accessible Beneficial project, but tangential to LM recovery Recommendation: support the project.

Future Recommendations at WTC Site Depends on and to be informed by designs for site now under development by LMDC and Civic Alliance/RPA –Permanent PATH station –Transit center and concourse –West Street –Through streets on WTC superblock –Bus storage on or off WTC site

Future Amenity and Transportation Related Recommendations for Lower Manhattan Fulton Street Corridor Street Management