Remediation - A Time for Learning - A Time for Action presented by Mark Bassett, Sellafield Programme Director on behalf of Mike Weightman, Chief inspector.

Slides:



Advertisements
Similar presentations
NuLeAF Opportunities for Storage Consolidation of Higher Activity Wastes 4 th November 2011.
Advertisements

Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
Development of WM strategy and implementation 1. Clarification of dominant nuclides and important characteristics of waste ( Cs only? with long-lived nuclides?
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Civil decommissioning market – an update Presented by Ron Gorham Head of Supply Chain Development and Commercial Relationships.
Steve May A H Allen Limited Asbestos: A Breath of Fresh Air?
Challenges in LLW Management: a Local Government Perspective Fred Barker, Executive Director, NuLeAF SAFESPUR FORUM 29 April 2009.
Adult Services Improvement Programme Advisory Group Risk Workshop 13 th August pm – 4.30pm.
Presented by: Alaa Albesher. Outline:  Introduction.  Decision Factors.  Risk Factors.  Critical Success Factors.  Conclusion.
Topic 4 - Risk Assessment Textbook pages 72–77. Learning outcomes By the end of the topic learners will have: Greater familiarity with risk assessment.
ONR Presentation to NuLeAF Tanya MacLeod. Responsibilities Prime responsibility for the assessment and management of Flood and Coastal Risk on site rests.
RESPONSIBLE CARE ® DISTRIBUTION CODE Daniel Roczniak Senior Director, Responsible Care American Chemistry Council June 2010.
Safe systems approach for mining road safety Damir Vagaja Manager Mining and Resources ARRB Group.
1 CS38010 Professional Issues Health and Safety at Work.
Leadership and Organizational Aspects.
UK Cleanup Market Overview A Strategic approach to Cleanup & Hazard Reduction Nov 2010 Marcus Mackay mercury stone.
PHILOSOPHY OF ACCIDENT PREVENTION
Health and Safety Executive Health and Safety Executive Discretion and Judgement: HSE’s approach Mike Cross 3 June 2014.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
It is important that we remember that Health & Safety must be an integral part of everything we do.
Magnox Swarf Storage Silos Programme Decommissioning Delivery Partnership Requirements February 2014 Gavin Askew.
Sustainable Development Programme Social Science Research Priorities for Nuclear Power Malcolm Grimston Associate Fellow PSI Conference: Projects and Policies.
Health and Safety Executive UK Approach to Risk Assessment of Genotoxic Carcinogens in the Occupational Setting Dr Susy Brescia Chemicals Regulation Directorate.
First Technical Meeting on EMRAS II - proposal for a new working group / sub group Astrid Liland and Malgorzata Sneve, Norwegian Radiation.
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
Decommissioning Delivery Partnership Rebecca Weston Tuesday 11 February 2014.
Presentation 4: How can I know if nanomaterials are used in my workplace?
Health & Safety West Winch Primary School. Health & Safety Overview.
TRP Chapter Chapter 5.4 Facility development.
5 th Annual Housing Institute June , 2012.
First Generation Magnox Storage Pond (FGMSP) Programme Partner Requirements February 2014 Steve Topping.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
Volunteers and the Law Example Training Slides Check out updated Home Office Guidance: Asylum Seekers Slide 13 Getting People Involved.
Nuclear Decommissioning in the UK Presented by Chris Jones.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
“You have a duty of care for your own health and safety”
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
56th Regular Session of the IAEA General Conference
1 Problem Solving Skills PCBN Pacific Coast Business Networking July 8, 2015.
The Participant as an Individual. All of the following are environmental factors except: Pollution Altitude Physique Humidity (1 mark)
2009 Adult Social Care and Health Personalisation Challenges and opportunities for local authorities and third sector providers Sian Lockwood,
 This kind of thinking based on a lack of knowledge about the process of working with adults and about the needs of young children  Supervisors in early.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Maintaining Safe Production
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Training for Decommissioning Author – Andy Dietzold – UKAEA Presenter – David Reay - UKAEA.
Summary of Session 6 Long Term Operation 1 Christopher Miller NRC, United States of America IAEA International Conference on Operational Safety Vienna.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
TUI GROUP | RSC | Martin Ring | November 2015 Compliance vs Performance based risk management Martin Ring Head of Risk, Safety and Compliance.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
Abstract A step-wise or ‘tiered’ approach has been used as a rational procedure to conduct environmental risk assessments in many disciplines. The Technical.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Health & Safety Management “and a few other things for your consideration”
1 Introduction to safety case and safety assessment: purpose and content of safety case Ian Crossland Crossland Consulting
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Need for a Regulatory program.
WORKSHOPS AND OTHER ACTIVITIES IMPLEMENTED BY WINS TO SUPPORT THE STRENGTHENING OF RADIOLOGICAL SECURITY WORLDWIDE Pierre Legoux, WINS 05 March Mumbai,
Nuclear decommissioning: Turning waste into Wealth
Philip Lloyd Energy Institute Cape Peninsula University of Technology
Unit 1 Health and Safety in the Engineering Workplace
1 The roles of actuaries & general operating environment
Debt Relief Measures To Deal With Over-Indebtedness
Joseph D. Anderson, Chief
Risk MENTORING Alberta Construction Safety Association.
Autonomous Robotics in the Nuclear Industry
NDA Draft Strategy.
NDA Draft Strategy.
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
Presentation transcript:

Remediation - A Time for Learning - A Time for Action presented by Mark Bassett, Sellafield Programme Director on behalf of Mike Weightman, Chief inspector ONR Health and Safety Executive

Remediation Where hazards exist from: past operations; or accidents; remediation is necessary. Remediation is about TAKING ACTION to reduce the risk and hazard to an acceptable level

A time for learning Problems of remediation are not unique to any country No country can claim to have all the answers We need to learn from each other IAEA has a role in facilitating this learning.

Lessons from Fukushima There has been excellent remediation progress made at Fukushima. What lessons can we learn?

Remediation Regulation Remediation requires a different regulatory approach to normal operation. Delaying action until all questions have been answered may result in the situation deteriorating This requires flexibility in approach and A dynamic responsive regulator

UK Experience Many examples of successful remediation: Four research/isotope production reactors and areas of existing licensed sites, e.g. Winfrith and Harwell Also examples of very slow remediation: Windscale >50 years after the accident Sellafield legacy ponds and silos

(© Sellafield)

Ageing asset degradation and care are key issues

Before After Sellafield - Capenhurst

Before After Sellafield - Capenhurst

Before After Sellafield - Capenhurst

Before After Sellafield - Capenhurst

© Magnox

Why do remediation delays occur? Many potential reasons, e.g. Inappropriate funding No incentivisation Uncertainty (waste, asset condition and technical) Poor costing Over analysis (“paralysis by analysis”) Lack of appropriate waste storage or disposal routes Over regulation and too stringent clean up levels Lack of necessary skills or equipment Lose sight on the urgency of doing something – passive acceptance Time consuming bureaucracy

What can regulators do? We don’t offer a solution but we do want to prompt discussion. What we can do is ensure that we are not a source of delay through over regulation and provide regulatory support where appropriate.

Fit for Purpose Safety Cases Is it better to await a fully developed safety case than to act now? How much analysis is necessary for a safety case to be fit for purpose? How can we mitigate risks if we act now? How do we deal with uncertainty? How should ALARP be applied?

Step by Step Hazard Reduction It may be some time before the desired end state can be reached. Can we achieve some interim states that achieve some hazard reduction, for example by conditioning wastes into a more passive form?

Balancing Risks Should we accept increased short term risk in exchange for longer term increased safety? If so, how much more risk?

Other Considerations Can we legitimately and safely increase doses to workers involved in remediation? Do we need to invest in new plant to replace plant where the old plant has too much risk and before the waste has a disposal route?

Conclusions The longer we wait to act in remediation, the more difficult the problems become Regulators and regulations must not become part of the problem by causing unnecessary delays We cannot afford to ignore the opportunities to learn from each others’ experiences.

Remediation - A Time for Learning - A Time for Action presented by Mark Bassett, Sellafield Programme Director on behalf of Mike Weightman, Chief inspector ONR Health and Safety Executive