Naming Summary Functional, Items, Assets, Drawings.

Slides:



Advertisements
Similar presentations
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
Advertisements

TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
MFI Office Maintenance Management Project Presentation 30th of May
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
Prepared by R.A.Barlow (May 2014) TE-ABT-EC Maintenance methods and policy Edms nb. TE-ABT-EC Maintenance methods and policy in EC section.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Barriere O, Le Roux P
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Injector De-cabling Project Project Team Meeting #
AGH TRAINEE AT 01 JULY – 30 SEPTEMBER INTRODUCTION 1. CERN 2. Vacuum Group 3. ICM Section 4. My tasks 2Magdalena Karpiel.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Maintenance Management Project Mario Batz EN-CV Pierre Bonnal DG-DI Christophe Delamare GS-ASE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Ingo Ruehl.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Follow-up meeting of the Administrative Agreement between FCT and CERN for the on-the- job training of Portuguese technical graduates Tiago André Soares.
Review of the processes released in the framework of the MMP Goran Perinić.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
Maria del Carmen Barandela Pazos CERN CHEP 2-7 Sep 2007 Victoria LHCb Online Interface to the Conditions Database.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Many entry points to improve reliability! Research, Prototyping, Development QA & Testing Manufacturing & Installation Commiss- ioning Operation Technical.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
I. Bergevoet - Training preparation
YETS & LS2 Works EN-EL / Power distribution
ABT-EC EYETS Activities 2nd reports
ITER-CERN Workshop CERN EN/EL Installation contract policy 17 January 2017 Serge OLIGER On behalf of the Electrical Engineering Group (EN-EL) at CERN.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
ARIES WP 6 / Task September 2017
Vacuum Controls Quality Management
YETS & LS2 Works EN-El on LHC / Power distribution
Reliability Analysis & Infor EAM
Configuration Management and Layout Database ELENA Project
The MTF adjusted system to meet Vacuum Group needs
J. Uythoven for the MPE-MI & MS Teams
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
the CERN Electrical network protection system
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
GIS Portal Racks Project
P8 cryogenic PLC problems on
HL-LHC Quality management
Rack installation and local tests for the MEBT Chopper Rack
Radiation Working Group RADWG
Presentation transcript:

Naming Summary Functional, Items, Assets, Drawings

Equipment | Location Machine System | OB Code | Location Functional Position LHC PS ItemAsset Quality System | Equipment + Variant QS| Equipment + Variant | Serial # Machine | Equipment | Seq # Drawings Functional Code | Location SPS

Equipment | Location Machine System | OB Code | Location Functional Position LHC PS ItemAsset Quality System | Equipment + Variant QS| Equipment + Variant | Serial # Machine | Equipment | Seq # Drawings Functional Code | Location SPS

Equipment | Location Machine System | OB Code | Location Functional Position LHC PS ItemAsset Quality System | Equipment + Variant QS| Equipment + Variant | Serial # Machine | Equipment | Seq # Drawings Functional Code | Location SPS ?

Equipment | Location Machine System | OB Code | Location Functional Position LHC PS ItemAsset Quality System | Equipment + Variant QS| Equipment + Variant | Serial # Machine | Equipment | Seq # Drawings Functional Code | Location SPS Layout DB CDD EDMS Cartweb Smarteam Infor MTF TREC NORMA Cabloteque OP/CO Databases Layout DB CDD EDMS Cartweb Smarteam Infor MTF TREC NORMA Cabloteque OP/CO Databases Layout DB CDD EDMS Cartweb Smarteam Infor MTF TREC NORMA Cabloteque OP/CO Databases Layout DB CDD EDMS Cartweb Smarteam Infor MTF TREC NORMA Cabloteque OP/CO Databases

_V1_TE-MSI Project EN –TE Technical Meeting TOOLSDescriptionSupport ACCESSDB for MPE-MI and MSC-LMFIT department CABLOTHEQUEElectrical & Optical fiber Signal Cabling of CRG-CI EN/EL department Cern Drawing DirectoryTS department DAO SEESee Electrical Expert drawingsExternal CERN Logbook LABO of VSC-SCCGS department EDHElectronic internal InvoiceGS department Equipment Data Management Service GS department EXCELEQUIPMENTS - SPARE – LISTSIT department FESAFramework C++, XML, XSLT, Java …BE department GMAO sous OracleGS department JIRAControls issue tracking systemEN/ICE department Job Management ToolkitGS department LHC Functional Positions SLOT & Equipments ASSET BE department Equipment Management FolderGS department JMT MTF Equipment Management Folder TOOLSDescriptionSupport lhc Magnet circuits, Powering and Performance Panel MPE & MSC members GMAO EPC DB sous OracleTE-EPC-OMS Gestion PLCIT department Website DB Maintenance – Normal Conducting Magnet TE-MSC-NMC PARADPlc Application Repository And Distribution EN/ICE department PLC SiemensSiemens mapping of PLC software and version TE-ABT PVSSProcess Visualization Control System EN/ICE department Safety Commission - Radiation Protection DGS-RP department Sensor DB & Therm DB Database Calibration & Controls CRG BE/CO department SMARTEAMBase CATIA for ABT-SEIT department SVNSoftware versions VME – PLC management of ABT-EC BE department CO TIMBERTechnical Infrastructure Monitoring - User interface to the LHC Logging System BE department UNICOSIndustrial Control System ParadigmEN/ICE department IMPACTIntervention Manangement Planning And Coordination Tool EN/MEF GS/AIS ACCDB MP3-QPS Repository RESULTS: RANGE OF COMPUTER TOOLS