OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Capacity Management Planning the resource capacity that a firm will need to meet its demand.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
Sales and Operations Planning CHAPTER THIRTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning in a Supply Chain
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations.
Sales and Operations Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Strategic Capacity Planning Defined
Class 21: Chapter 13: Sales and Operations Planning Agenda for Class 21 –Collect challenges & discuss questions –Secondary Research due November 29 th.
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 14 Aggregate Sales and Operations Planning.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Operations Planning Horizons
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Aggregate Planning This Chapter explores:
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Contents Introduction Aggregate planning problem
Operations Management Aggregate Planning
© The McGraw-Hill Companies, Inc., DOM 511: Operations Mgt Practice Aggregate Planning.
Operations Management For Competitive Advantage 1 Aggregate Planning Operations Management For Competitive Advantage Chapter 12.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Sales and Operations Planning CHAPTER 11.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Chapter 10 Sales and Operations Planning (Aggregate Planning)
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
Production Planning.  What to produce  When to produce  How to produce.
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Chapter 8 Aggregate Planning in the Supply Chain
Chapter 8 Aggregate Planning in the Supply Chain
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Aggregate Production Planning (APP)
Presentation transcript:

OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc. PowerPoint Presentation by Charlie Cook, The University of West Alabama

CHAPTER PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 The McGraw-Hill Companies. All rights reserved. Aggregate Planning 13

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–3 CHAPTER OBJECTIVES Demonstrate how aggregate planning provides the link between long-range strategic planning and short-range scheduling. Present alternative strategies for matching supply and demand: adjusting supply (an operations function) or adjusting demand (a marketing function). Introduce alternative strategies for developing aggregate plans and ways to identify their strengths and weaknesses. Define marginal costs and total costs as they pertain to aggregate planning. Introduce yield management as a tool for matching supply and demand in service operations.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–4 Managerial Issues Translating long-range strategic plans into daily work schedules for the shop floor. Using aggregate planning to develop intermediate-range plans that link the long-range strategic plan and the short- range operational plan. Developing aggregate plans that match the demand for products with the firm’s ability to supply the products and to do so at minimum cost. Coordinating marketing management and operations to develop an aggregate plan that is both effective and efficient.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–5 Overview of Operational Planning Activities Long-Range Planning –Focuses on strategic issues relation to capacity, process, selection, and plant location. Intermediate-Range Planning –Focuses on tactical issues pertaining to aggregate workforce and material requirements for the coming year. Short-Range Planning –Addresses day-to-day issues of scheduling workers on jobs at assigned work stations.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–6 Overview of Manufacturing Planning Activities Exhibit 13.1

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–7 Intermediate-Range Planning Aggregate Production Planning –The process for determining the most cost effective way to match supply and demand over the next 12–18 months. Item Forecasting –Estimating specific products (and replacement parts), which, when integrated with the aggregate production plan, becomes the output requirement for the master production schedule (MPS). –The process of monitoring and integrating this information is termed demand management.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–8 Intermediate-Range Planning (cont’d) Master Production Scheduling (MPS) –Short-term scheduling of specific end product requirements for the next several quarters. Rough-Cut or Resource Capacity Planning –Determining that adequate production capacity and warehousing are available to meet demand.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–9 Aggregate Production Planning Production Rate –The capacity of output per unit of time (such as units per day or units per week. Workforce Level –Number of workers required to provide a specified level of production.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–10 Required Inputs to the Production Planning System Exhibit 13.2

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–11 Aggregate Production Planning (cont’d) Inventory on Hand –The surplus of units that results when production exceeds demand in a given time period. Backlog (or Stockout) –The deficit in units that results when demand exceeds the number of units produced in a given time period.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–12 Production Planning Strategies Chase Strategy –Matching the production rate to exactly meet the order rate by hiring and laying off workers as the order rate varies. Stable Workforce—Variable Work Hours –Varying output by varying the number of hours worked through flexible schedules or overtime. Level Strategy –Maintain a stable workforce working at constant output rate; absorb demand variations with inventory, backlogs, or lost sales.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–13 Production Planning Strategies (cont’d) Pure Strategy –Either a chase strategy when product exactly matches demand or a level strategy when production remains constant over a specified number of periods. Mixed Strategy –A combination of chase and level strategies to match supply and demand.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–14 Examples of Pure Chase and Pure Level Strategies Exhibit 13.3

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–15 Aggregate Production Planning Relevant Costs –Basic production costs (fixed and variable) –Costs associated with changes in the production rate (e.g., labor costs) –Inventory holding costs –Backlog (stockout) costs Budgets –Aggregate planning helps justify requests for organizational resources.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–16 Aggregate Planning Techniques Trial and Error –Costing out the production alternatives and choosing the one with the lowest cost. Linear Programming Linear Decision Rule Various Heuristic Methods

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–17 Aggregate Planning Techniques (cont’d) Full Costs –All of the actual, out-of-pocket costs associated with a particular aggregate plan. –Used for developing a labor and material budget. Marginal (Incremental) Costs –Unique costs attributable to a particular aggregate plan that are above and beyond those required to build the product by its most economical means.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–18 New England Shirt Company

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–19 New England Shirt Company (cont’d)

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–20 Forecast Demand and Workdays for the D&H Company Exhibit 13.4

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–21 First Alternative: Pure Chase Strategy Exhibit 13.5

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–22 Second Alternative: Pure Level Strategy Exhibit 13.6

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–23 Third Alternative: Minimum Workforce with Subcontracting Strategy Exhibit 13.7

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–24 Fourth Alternative: Constant Workforce with Overtime Strategy Exhibit 13.8

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–25 Summary of Costs for Alternative Aggregate Plans Exhibit 13.9

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–26 Actual Demand Requirement for Full-Time Direct Employees and Full-Time-Equivalent (FTE) Part-Time Employees Exhibit Note: Some workweeks are staggered to include weekdays, but this does not affect the number of workdays per employee. *Full-time days are derived by multiplying the number of days in each month by the number of workers.

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–27 Three Possible Plans for the Parks and Recreation Department Exhibit 13.11

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–28 Yield Management Yield (Revenue) Management –The concept used in service operations with high-fixed costs and low-variable costs that attempts to match supply and demand (a chase strategy) to maximize capacity utilization. Yield Management Requires: –The ability to segment the market –High-fixed and low-variable costs where additional sales create more profits –Product perishability (cannot be inventoried) –Lower-priced capacity that can be presold

Copyright © 2005 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 13–29 Comparison of Costs for All Three Alternatives Exhibit 13.12