Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations.

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Strategic Decisions (Part II)
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
Chapter 12 Aggregate Planning.
Aggregate Planning in a Supply Chain
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Aggregate Planning.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Operations Strategy and.
Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
ISQA 459 Sales & Operations Planning
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Strategic Capacity Planning Defined
Production Planning All manufacturing and service operations require planning and controlling, although the formality and detail may vary. Some operations.
Rev. 03/09/05SJSU Bus David Bentley1 Chapter 12 – Aggregate Planning Planning levels (long, intermediate and short ranges and real time control);
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 14 Aggregate Sales and Operations Planning.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Operations Planning Horizons
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Production Planning and Control.  Allocate the company’s ressources  Taking into account :  Strategic and operational objectives (quantity, quality,
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
Aggregate Planning This Chapter explores:
Contents Introduction Aggregate planning problem
Operations Management Aggregate Planning
© The McGraw-Hill Companies, Inc., DOM 511: Operations Mgt Practice Aggregate Planning.
Operations Management For Competitive Advantage 1 Aggregate Planning Operations Management For Competitive Advantage Chapter 12.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning. Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 6 to 18 months. Short range Intermediate.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Sales and Operations Planning CHAPTER 11.
1 Chapter 13 Production Planning Supplemental Slides.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
Sales and Operations Planning
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
Aggregate Planning 2 2.
Operations Management
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Chapter 8 Aggregate Planning in the Supply Chain
Dr Sh Salleh bin Sh Ahmad
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Presentation transcript:

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations Management For Competitive Advantage C HASE A QUILANO J ACOBS ninth edition Chapter 12

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 2 Chapter 12 Aggregate Planning  Operations Planning Overview  The hierarchical planning process  Aggregate production planning  Examples: Chase and Level strategies

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 3 Operations Planning Overview  Long-range planning – Greater than one year planning horizon – Usually with yearly increments  Intermediate-range planning – Six to eighteen months – Usually with monthly or quarterly increments  Short-range planning – One day to less than six months – Usually with weekly increments

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 4 Master Production Scheduling Material Requirements Planning Order Scheduling Weekly Workforce & Customer Scheduling Daily Workforce & Customer Scheduling Strategic Planning Sales Planning Aggregate Planning Long- range Intermediate- range Short- range Manufacturing Services Exhibit 12.1

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 5 Hierarchical Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand for 5 months by item Forecasts needed Allocates production among plants Determines seasonal plan by product type Determines monthly item production schedules Decision ProcessDecision Level Corporate Plant manager Shop superintendent Exhibit 12.2

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 6 Aggregate Planning  Goal: Specify the optimal combination of – production rate (units completed per unit of time) – workforce level (number of workers) – inventory on hand (inventory carried from previous period)  Product group or broad category (Aggregation)  Intermediate-range planning period: 6-18 months

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 7 Balancing Aggregate Demand and Aggregate Production Capacity JanFebMarAprMayJun JanFebMarAprMayJun Suppose the figure to the right represents forecast demand in units. Now suppose this lower figure represents the aggregate capacity of the company to meet demand. What we want to do is balance out the production rate, workforce levels, and inventory to make these figures match up.

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 8 Key Strategies for Meeting Demand  Chase  Level  Some combination of the two

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 9 STRATEGIES ACTIVE WRT DEMAND  USE MARKETING TO SMOOTH DEMAND  EXAMPLES  PRICE  PRODUCT  PLACE  PROMOTION

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 10 Proactive Demand Management to Equate Supply and Demand SEASONAL DEMAND - SNOW SKIIS CONTRA- SEASONAL DEMAND - _______________

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 11 Proactive Demand Management to Equate Supply and Demand CYCLICAL DEMAND - NEW CARS CONTRA-CYCLICAL DEMAND - __________________

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 12 Aggregate Planning Examples: Unit Demand and Cost Data Materials$5/unit Holding costs$1/unit per mo. Marginal cost of stockout$1.25/unit per mo. Hiring and training cost$200/worker Layoff costs$250/worker Labor hours required.15 hrs/unit Straight time labor cost$8/hour Beginning inventory250 units Productive hours/worker/day7.25 Paid straight hrs/day8 Suppose we have the following unit demand and cost information: Demand/moJanFebMarAprMayJun

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 13 Cut-and-Try Example: Determining Straight Labor Costs and Output Productive hours/worker/day7.25 Paid straight hrs/day8 Demand/moJanFebMarAprMayJun Given the demand and cost information below, what are the aggregate hours/worker/month, units/worker, and dollars/worker? 7.25x x0.15=48.33 & 84.33x22= x8hrsx$8=$1408

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 14 Chase Strategy (Hiring & Firing to meet demand) Lets assume our current workforce is 7 workers. First, calculate net requirements for production, or =4250 units Then, calculate number of workers needed to produce the net requirements, or 4250/ =3.997 or 4 workers Finally, determine the number of workers to hire/fire. In this case we only need 4 workers, we have 7, so 3 can be fired.

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 15 Below are the complete calculations for the remaining months in the six month planning horizon.

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 16 Below are the complete calculations for the remaining months in the six month planning horizon with the other costs included.

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 17 Level Workforce Strategy (Surplus and Shortage Allowed) Lets take the same problem as before but this time use the Level Workforce strategy. This time we will seek to use a workforce level of 6 workers.

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 18 Note, if we recalculate this sheet with 7 workers we would have a surplus. Below are the complete calculations for the remaining months in the six month planning horizon.

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 19 Below are the complete calculations for the remaining months in the six month planning horizon with the other costs included. Labor Material Storage Stockout Note, the total costs under this strategy are less than under Chase.