Capacity Management.

Slides:



Advertisements
Similar presentations
Debrief S&OP Copy and paste this debrief at the beginning a session that follows the S&OP session.
Advertisements

Strategic Decisions (Part II)
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Operations Management Aggregate Planning Chapter 13
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
Aggregate Planning in a Supply Chain
Aggregate Planning.
Supply Chain Risk.
Inventory Management.
Chapter 13 – Aggregate Planning Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
Reid & Sanders, Operations Management © Wiley 2002 Aggregate Planning 13 C H A P T E R.
Manufacturing’s Objectives
Sales and Operations Planning
Chapter 8 Aggregate Planning in a Supply Chain
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Kick off.
Supplier Management.
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
Cooperative Purchasing Association
Aggregate Planning.
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Aggregate Planning and Resource Planning Chapters 13 and 14.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Chair Manufacturing Operation.  Operation Strategy (Ankush Moham)  Process (Jae Won Yu)  Forecast & Production (Prab Sandhu)  Site & Equipment (Alvin.
Operations Management
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Operation Management.
© Wiley Chapter 13 – Sales and Operations Planning Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Chapter 13 – Aggregate Planning
Format Modules around TFC Cross functional trade offs Strategy into action (level1,2,3) Cross functional trade offs Strategy into action (level1,2,3)
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Demand Planning & Shaping
Production Planning.  What to produce  When to produce  How to produce.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Planning Supply and Demand in a Supply Chain
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 14 Aggregate Planning.
BIA 674 – Supply Chain Analytics
13 Aggregate Scheduling PowerPoint presentation to accompany
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 8 Aggregate Planning in the Supply Chain
Fundamentals of Production Planning and Control
Dr Sh Salleh bin Sh Ahmad
Chapter 13 – Aggregate Planning
13 Aggregate Scheduling PowerPoint presentation to accompany
Production and Operations Management
Manufacturing’s Objectives
Presentation transcript:

Capacity Management

Trade offs The Fresh Connection is full of trade offs Over multiple roles and within roles Sometimes conflicting with role incentives Capacity management Volatility manaagment Capacity mgt Demand mgt Supplier mgt Inventory mgt

Production Strategies Four basic production strategies: Chase (demand matching) Level Subcontracting Hybrid (combination) © 2009 APICS CONFIDENTIAL AND PROPRIETARY 3

© 2009 APICS CONFIDENTIAL AND PROPRIETARY Chase Strategy © 2009 APICS CONFIDENTIAL AND PROPRIETARY 4

© 2009 APICS CONFIDENTIAL AND PROPRIETARY Chase Strategy Advantages: Stable inventory Varied production to meet sales requirements Disadvantages: Costs of hiring, training, overtime, and extra shifts Costs of layoffs and impact on employee morale Possible unavailability of needed work skills Capacity must match maximum demand © 2009 APICS CONFIDENTIAL AND PROPRIETARY 5

Level Strategy © 2009 APICS CONFIDENTIAL AND PROPRIETARY Source: Arnold et al., Introduction to Materials Management, 6th ed. Reprinted by Permission of Pearson Education © 2009 APICS CONFIDENTIAL AND PROPRIETARY 6

© 2009 APICS CONFIDENTIAL AND PROPRIETARY Level Strategy Advantages: Avoids labor and capacity costs of demand matching Avoids changeover costs and lowers the average production cost per item Disadvantages: Buildup of inventory Requires a very accurate forecast © 2009 APICS CONFIDENTIAL AND PROPRIETARY 7

Meet demand by subcontracting Advantages: No excess capacity Level production Disadvantages: Costs of subcontracting Proprietary production technology © 2009 APICS CONFIDENTIAL AND PROPRIETARY 8

Hybrid Strategy © 2009 APICS CONFIDENTIAL AND PROPRIETARY Source: Arnold et al., Introduction to Materials Management, 6th ed. Reprinted by Permission of Pearson Education © 2009 APICS CONFIDENTIAL AND PROPRIETARY 9

Hybrid Strategy: Characteristics Produces at or close to full capacity for part of the cycle Produces at a lower rate during the other part of the cycle Production is level in both parts of the cycle Inventory and workforce adjustment costs are lower than in the chase strategy Requires an accurate forecast as in the level strategy © 2009 APICS CONFIDENTIAL AND PROPRIETARY 10

Capacity management in TFC Subcontracting in not an option TFC Levelling of capacity is impossible for a fresh product Two choices by varying the frozen period Chasing Hybrid Explore TFC What is the % runtime, breakdowntime, changeover time and unused for the filling line? How can you influence breakdown and change over time?

Capacity Planning Issues in the game Components Finished product Supply Production Distribution Palletlocations FTE Palletlocations FTE Shifts Improvements Explore TFC What is the utilization rate per resource? What is the overtime/overflow per resource? What can you conclude from this?

Capacity in time Resulting in Overtime Overflow Idle time Capacity required Overtime Overflow Idle time Unused capacity Time Resulting in Overtime/Overflow% Utilization rate What is the optimal utilization rate?

Volatility of capacity required is important Costs High volatility capacity required Average volatility capacity required Low volatility capacity required 70% 80% 90% Utilization rate How can you influence the volatility of capacity required? Inbound warehousing Production Outbound warehousing

Capacity volatility reduction Raw materials warehouse Small batches for high volume products (orange) Steady flow of incoming goods Decrease demand volatility caused by production (Increase intake time)

Capacity volatility reduction Production Short fixed period (bullwhip effect) Decrease volatility caused by customer demand Short production intervals

Capacity volatility reduction Finished goods warehouse Early order deadlines Pallet shipments Decrease customer demand volatility Stable production rate

Utilization finished goods warehouse

Influence of overtime in TFC Overtime in production and warehousing will influence your costs. What is the other important effect of overtime?

Production reliability in the game Terms of delivery Overtime% bottling lines Availability components Fixed period Component stock

Overtime % bottling lines in the game # shifts per bottling line Overtime % bottling lines Improve-ment projects Past shelf life Bottling line Raw materials inspection Decrease peaks