PERPAMSI Persatuan Perusahaan Air Minum Seluruh Indonesia Indonesian Water Supply Association www.perpamsi.org REGIONAL WORKSHOP TO DISSEMINATE WATER SUPPLY.

Slides:



Advertisements
Similar presentations
Environmental Management System Implementation
Advertisements

[Organisation’s Title] Environmental Management System
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Nomad Aviation Employee Training on ISO 9001 – the globally recognized quality management system 1ISO 9001 Training for Employees-Rev. B.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
The ISO 9002 Quality Assurance Management System
Quality Management System
ISO General Awareness Training
Quality Management Dr. S.W. Poon. Quality Management Introduction Meaning of quality Quality Control (QC) Quality Assurance (QA) Differences between QC.
Chapter 10: Quality Management Systems Jennifer Sadorus Heather Heller.
First Practice - Information Security Management System Implementation and ISO Certification.
Implementing a Quality Management System
Quality Management Systems: ISO 9001 BY MATTHEW FELTEN.
ISO 9000:2000 Quality system standards adopted in 1987 by International Organization for Standardization; revised in 1994 and 2000 Technical specifications.
Presented by Katarina NEUSCHLOVA
ISO 9000 Certification ISO 9001 and ISO
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
5.2 Personnel Use competent staff Supervise as necessary
Software Process Improvement Initiative
ISO 9000 Introduction Imran Hussain.
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
Visit us at E mail: Tele:
ISO 9001 Quality Management System
Quality Management System
Quality Management Systems P.Suriya Prakash Final Mech Vcet
P E R P A M S I Persatuan Perusahaan Air Minum Seluruh Indonesia Association of Indonesian Water Supply Enterprises IWA World Water Congress.
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Implementation of ISO 14001/OHSAS TMS Consultancy Ltd.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
FOURTH EUROPEAN QUALITY ASSURANCE FORUM "CREATIVITY AND DIVERSITY: CHALLENGES FOR QUALITY ASSURANCE BEYOND 2010", COPENHAGEN, NOVEMBER IV FORUM-
1 Implementing a Business Management System compliant to ISO 9001:2000.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Arnsburger Str. 64, Frankfurt, Germany Tel , Fax Internet:
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
African Regional Director
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Managing with Quality The case of the architectural heritage dept. DM
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial control Bilateral screening:
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
Government of Mongolia Government Financial Management and Information System (GFMIS) FreeBalance Case Study ICGFM, April 2004.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Advancing Business Excellence CPPC Forum 2007 Helping The Public Sector Meet Quality and Societal Challenges Tricia Cooper Manager, QMI.
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
9 Stage Online Consultancy for ISO Certification ISO Auditor Training ISO Documentation.
UNDERSTANDING ISO 9001:2008.
Software Process Improvement Initiative
WRTVC INTERNATIONAL GUIDELINES Requirements for
Water Services Trust Fund Field Monitors Training Workshop
Pacific Region Infrastructure Facility
Awareness program on ISO/TS16949:2002
OFFICE OF THE PUBLIC PROTECTOR
UNIT V QUALITY SYSTEMS.
Quality Management Systems – Requirements
ISO/IEC 27001:2005 A brief introduction Kaushik Majumder
QUALITY MANAGEMENT SYSTEM
Integrated Management System
Sub-RésEAU Western Balkans
José Ockerman Marco A. Soto
ISO 9001:2000 Awareness Training
Swiss Engagement in the Water Sector in the Western Balkans
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

PERPAMSI Persatuan Perusahaan Air Minum Seluruh Indonesia Indonesian Water Supply Association REGIONAL WORKSHOP TO DISSEMINATE WATER SUPPLY AND SANITATION STANDARDS OF QUALITY OF SERVICES 24 – 27 July 2007, Kampala / Uganda Dr. Werner BRENNER, Advisor Finance & Management INDONESIAN EXPERIENCES IN ISO 9001:2000 CERTIFICATION OF PUBLIC WATER UTILITY SERVICES

WBI/InWEnt, Kampala, July, ISO Workshop OVERVIEW OF PRESENTATION A.INTRODUCING THE INDONESIAN WATER SECTOR B.OUTSET SITUATION C.OBJECTIVE FOR IMPLEMENTATION OF ISO 9001:2000 D.SCOPE & PROCESS OF QUALITY CERTIFICATION E.PROBLEMS & SUCSESS FACTORS F.BENEFITS OF ISO 9001:2000 CERTIFICATION G.WHAT NEXT H.PICTURES

WBI/InWEnt, Kampala, July, ISO Workshop Facts about PERPAMSI, the Indonesian Water Supply Association  Established:  1972 by the Ministry of Home Affairs  Organization:  Head quarter in Jakarta (30 employees)  27 Provincial offices to coordinate activities  Members:  All 328 Indonesian public water utilities  Around 100 extraordinary members (suppliers, investors,…)  Services:  Typical association services to the members, governmental institutions, financing institutions, investors, donors and others  Training institution under PERPAMSI A: THE INDONESIAN WATER SECTOR

WBI/InWEnt, Kampala, July, ISO Workshop A: THE INDONESIAN WATER SECTOR (cont)

WBI/InWEnt, Kampala, July, ISO Workshop A: THE INDONESIAN WATER SECTOR (cont)  Water utilities are owned by local governments and controlled by local parliaments  Coverage rates for piped water supply  around 35% for urban areas and  around 20% for overall Indonesia (ca. 6,5 million household connections are installed)  Urban water supply provided by 328 water utilities  Only 5% of water utilities have more then 50,000 connections  60% have less than 10,000 connections  Less than 25% of PDAMs considered to be “financially viable”  Overall coverage rate for sewerage services < 1%

WBI/InWEnt, Kampala, July, ISO Workshop A: THE INDONESIAN WATER SECTOR (cont)

WBI/InWEnt, Kampala, July, ISO Workshop A: THE INDONESIAN WATER SECTOR (cont)

WBI/InWEnt, Kampala, July, ISO Workshop B: OUTSET SITUATION THE SUSTAINABILITY CHALLENGE Deteriorating assets Declining productivity Increasing operating costs Intermittent supply Poor quality water Angry customers Unwillingness to pay Low tariffs Declining revenues Unpaid bills Inability to access financing Declining credit rating and investment Cycle of Physical & Commercial Decline Assets deteriorate & expansion is difficult if full economic costs are not recovered. Service to the poor & wastewater suffer.

WBI/InWEnt, Kampala, July, ISO Workshop B. OUTSET SITUATION (cont) 1.Human Resources 1.1 Low level of the employees’ competence 2.Equipment 2.1 Old treatment plant equipment 2.2 Equipment breakdown development (Fig. 1) No. of Problems Fig. 1 Equipment Breakdown

WBI/InWEnt, Kampala, July, ISO Workshop 3.Water Treatment Plant System (Cicokol WTP; liter per sec.) 3.1 No standard operating procedures in place 3.2 Low efficiency & effectivity in the operation of the WTP (Fig. 2) 2004 – 2005 Hour Fig. 2 Breakdown Time for Maintenance B. OUTSET SITUATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop 4.Water Quality 4.1 There was no person in charge to handle & follow up the customer complains 4.2 Low water quality (eq : Turbidity & Chlor residue) (Fig. 3 & 4) B. OUTSET SITUATION (cont) Fig. 3 Water Turbidity Fig. 4 Water Chlor Residue ppm Standard 1.5 NTU Standard 0.6 ppm

WBI/InWEnt, Kampala, July, ISO Workshop C. OBJECTIVES FOR THE IMPLEMENTATION OF ISO 9001: Increase customers satisfaction 2.Improve the company’s performance. 3.Improve efficiency & effectivity of working system 4.Improve employees’ capacity & responsibility 5.Better communication & improvement of data quality 6.Better customers & suppliers relationship

WBI/InWEnt, Kampala, July, ISO Workshop REQUIREMENTSREQUIREMENTS Management Responsibility Measurement, Analysis & Improvement Resource Management Product Realization Output Product CUSTOMERCUSTOMER SATISFACTIONSATISFACTION CUSTOMERCUSTOMER PROCESS APPROACH Input C. OBJECTIVES FOR THE IMPLEMENTATION OF ISO 9001:2000 (cont)

WBI/InWEnt, Kampala, July, ISO Workshop D. SCOPE & PROCESS OF ISO 9001:2000 CERTIFICATION I.SCOPE OF ISO 9001:2000 CERTIFICATION Operation & maintenance of a water treatment plant (capacity liter per second) II. CERTIFICATION PROCESS 1.First Stage: 1.1 Determine the management commitment 1.2 Appoint the team member to develop the system 1.3 Socialization of the ISO 9001:2000 quality management system 1.4 Determine scope of certification

WBI/InWEnt, Kampala, July, ISO Workshop 2.Second Stage: 2.1 Selecting the employees who will develop the system 2.2 Training for the working group members on ISO 2.3 Developing the quality manual 2.4 Developing the quality policy & quality objective 2.5 Developing the procedures & working instructions 2.6 Socializing the documents (procedures, working instructions, quality policy) with the employees D. SCOPE & PROCESS OF ISO CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop 3.Third Stage: 3.1 Implementation of the ISO 9001:2000 system 3.2 Revision of documents if the trial run is not appropriate 3.3 Internal audit training 3.4 Execution of internal audit 3.5 Corrective & preventive actions plans 3.6 Management review meeting D. SCOPE & PROCESS OF ISO CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop 4.Fourth Stage: 4.1 Determine certification body 4.2 Pre audit by certification body 4.3 Corrective & preventive actions 4.4 Final audit by the certification body 4.5 Recommendation for ISO 9001:2000 certificate D. SCOPE & PROCESS OF ISO CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop No. DESCRIPTION TOTAL MONTH 2005 JANPEBMARAPRMAYJUNJULAUGSEPOCTNOPDES A. FIRST STAGE Management Commitment Member of Work Group0.5 3.Socializations0.5 4.Scope of Certification0.5 B. SECOND STAGE4 1.Training ISO 9001: Develop the Quality Manual Develop the Procedure, Work Instruction Socialization of documents2 Fig. 5 Implementation Steps Table D. SCOPE & PROCESS OF ISO CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop No. DESCRIPTION TOTAL MONTH 2005 JANPEBMARAPRMAYJUNJULAUGSEPOCTNOPDES A. THIRD STAGE 3 1. Implementation System Revision of Documents1 3.Internal Audit Training Execution of Internal Audit1 5.Corrective & Preventive Actions1 6.Management Review Meeting0.25 B. FOURTH STAGE3 1.Determine Certification Body1 2.Pre Audit0.5 3.Corrective & Preventive Actions0.5 4.Final Audit Accepted the ISO 9001:2000 Certificate - Fig. 5 Implementation Steps Table D. SCOPE & PROCESS OF ISO CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop Fig. 6 ISO 9001:2000 CERTIFICATE D. SCOPE & PROCESS OF ISO CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop E. PROBLEMS & SUCCESS FACTORS DEVELOPMENT PHASE 1.Difficulties in “translating” ISO 9001 elements into water treatment plant management activities. 2.The limitations of human resources and experience in applying the ISO IMPLEMENTATION PHASE 1.Reluctance to improve or change 2.Quality management system is seen as another managerial burden. 3.Lack of discipline in documentation I. PROBLEMS DURING THE IMPLEMENTATION PHASE

WBI/InWEnt, Kampala, July, ISO Workshop 1. Prime commitment from the lowest to the highest staff level in the company. 2.The staff in the company is aware about ISO 9001:2000 standards. 3.High staff motivation and discipline. 4.Team building and co-operation II. KEYS SUCCESS FACTORS E. PROBLEMS & SUCCESS FACTORS (cont)

WBI/InWEnt, Kampala, July, ISO Workshop F. BENEFITS OF ISO 9001:2000 CERTIFICATION Internal : 1.Improvement in the company’s performance 2.Better working methods 3.Main tasks are undertaken more efficient and effective. 4.Media of continual improvement External : 1.Increase of customers satisfactions 2.Stakeholders and customers’ complaints are handled and anticipated better and better 3.Appreciation from external parties to the company’s existence are increased.

WBI/InWEnt, Kampala, July, ISO Workshop F. BENEFITS OF ISO 9001:2000 CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop Hour Fig. 8 Breakdown Time Maintenance Before After F. BENEFITS OF ISO 9001:2000 CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop Before After Fig. 9 Water Turbidity F. BENEFITS OF ISO 9001:2000 CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop Fig. 10 Water Chlor Residue ppm Before After F. BENEFITS OF ISO 9001:2000 CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop KIND OF AUDITDATE OF AUDIT GRADE/No. OF FINDINGS TOTAL MAJOR NC MINOR NCRCSFIxLRQA Final Audit25 – 26 Oct Surveillance Audit 116 May Surveillance Audit 228 Nov Fig. 11 Audit Findings Note : 1.Major NC= Major Non Conformity 2.Minor NC= Minor Non Conformity 3.RC= Requires Correction 4.SFI= Scopes for Improvement 5.xLRQA= Issue for Follow-up by LRQA at next visit Audited by Lloyd’s Register Quality Assurance F. BENEFITS OF ISO 9001:2000 CERTIFICATION (cont)

WBI/InWEnt, Kampala, July, ISO Workshop G. WHAT NEXT? ON GOING : 1.Implementation of safety management system (OHSA 18000) 2.Improve the internal audit 3.Improve the working efficiency and effectively 4.Paperless System for all documents of the quality management system NEXT STEPS : 1.Implementation of total productive maintenance (TPM) 3.Online monitoring system 4.Web based data management

WBI/InWEnt, Kampala, July, ISO Workshop THANK YOU!