AGENDA l New Initiatives Office concept, purpose of NIO Advisory Committee –Smith l Science Case – Strom l Technology considerations – Oschmann l Near.

Slides:



Advertisements
Similar presentations
TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
Advertisements

European Southern Observatory European Southern Observatory © ESO 2005 Page 1 AO Department Leiden, April 26th 2005 MUSE M ulti U nit S pectroscopic E.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
Maximum Aperture Telescope Workshop Organized by AURA Chaired by Jay Gallagher MAX-AT Workshop Madison, Wisconsin, August.
George Angeli 11 September, 2001 Current Concepts and Status of GSMT Control Systems.
Maximizing GSMT Science Return with Scientific Figures of Merit.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Aug-Nov, 2008 IAG/USP (Keith Taylor) ‏ Instrumentation Concepts Ground-based Optical Telescopes Keith Taylor (IAG/USP) Aug-Nov, 2008 Aug-Sep, 2008 IAG-USP.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
The Need for Contiguous Fields NGAO Team Meeting, Waimea January 22, 2007 Claire Max.
1 Exosolar Giant Planet Science GSMT vs. JWST Terry Herter February 12, 2004 Based on material from: “Exosolar Planets” by Lunine for GSMT 4/28/03 “Planet.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
AURA New Initiatives Office. Larry Stepp and Brooke Gregory The GSMT Point Design.
DRAFT (12/18/00) AURA’s road map to future 30m - 100m groundbased observatories - entering the “ era of the Giants ” in partnership The New Initiatives.
High Redshift Galaxies: Encircled energy performance budget and IFU spectroscopy Claire Max Sept 14, 2006 NGAO Team Meeting.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
Black Holes in Nearby Galaxies Claire Max NGAO Team Meeting March 7, 2007.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
S. Strom, L. Stepp23 August, 2001 NIO GSMT Overview.
Adaptive Optics Road Map An Adaptive Optics Road Map Presentation to the AURA Board 7 February 2001 A Renaissance in Groundbased IR (even Optical) Astronomy?
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
MCAO A Pot Pourri: AO vs HST, the Gemini MCAO and AO for ELTs Francois Rigaut, Gemini GSMT SWG, IfA, 12/04/2002.
Next generation wide field AO (GLAO) and NIRMOS for Subaru Telescope.
Agenda GSMT Controls Workshop, 11 September, :00 am GSMT Overview – Brooke Gregory, Larry Stepp 9:30 am Pointing Control for a Giant Segmented Mirror.
Characterizing Exoplanets: The Challenge. GSMT Potential GSMT will detect & classify Jovian mass planets, from ‘roasters’ to ‘old, cold’ Jupiters located.
MCAO Adaptive Optics Module Mechanical Design Eric James.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
Telescopes & recent observational techniques ASTR 3010 Lecture 4 Chapters 3 & 6.
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
MAXAT-II Woods Hole September Overview Science Drivers Lessons of the past Focusing on Science and Innovation.
STDT: S. Seager (Chair, MIT), W. Cash (Colorado), S. Domagal- Goldman (NASA GSFC), N. J. Kasdin (Princeton), M. Kuchner (NASA GSFC), A. Roberge (NASA GSFC),
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Early scientific goals for the MMT’s multi-laser-guided adaptive optics Michael Lloyd-Hart, Thomas Stalcup, Christoph Baranec, N. Mark Milton, Matt Rademacher,
February 2013 Ground Layer Adaptive Optics (GLAO) Experiment on Mauna Kea Doug Toomey.
ASTR 3010 Lecture 18 Textbook N/A
NIO GSMT Overview VLOT/GSMT WORKSHOP Victoria, BC 17 JULY, 2001 S. Strom, L. Stepp.
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
1 Progress on the 30m Giant Segmented Mirror Telescope AURA New Initiatives Office Leiden, 17 May 2001 Matt Mountain Jim Oschmann Knut Olsen.
CELT Science Case. CELT Science Justification Process Put together a Science Working Group –Bolte, Chuck Steidel, Andrea Ghez, Mike Brown, Judy Cohen,
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Technology Development for ELTs Doug Simons GSMT SWG April 28, 2003.
Keck Observatory in the TMT Era Keck Strategic Planning meeting September 18, 2009.
Data Reduction with NIRI Knut Olsen and Andrew Stephens Gemini Data Workshop Tucson, AZ July 21, 2010 Knut Olsen and Andrew Stephens Gemini Data Workshop.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Forming High Mass Stars Probing the Formation Epoch.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
1 Comparative Performance of a 30m Groundbased GSMT and a 6.5m (and 4m) NGST NAS Committee of Astronomy & Astrophysics 9 th April 2001 Matt Mountain Gemini.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Wide field telescope using spherical mirrors Jim Burge and Roger Angel University of Arizona Tucson, AZ Jim
Overview Science drivers AO Infrastructure at WHT GLAS technicalities Current status of development GLAS: Ground-layer Laser Adaptive optics System.
AURA New Initiatives Office Euro50 - GSMT - XLT MeetingLMS, 08/02/02 The Giant Segmented Mirror Telescope.
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
FIRST LIGHT A selection of future facilities relevant to the formation and evolution of galaxies Wavelength Sensitivity Spatial resolution.
Giant Magellan Telescope Project Status and Relationship with the NSF Astronomy and Astrophysics Advisory Committee February 8, 2007 Patrick McCarthy -
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 GSMT AO Simulations.
Next Generation O/IR Telescopes Stephen E. Strom Associate Director GSMT Development NOAO User’s Committee October, 2005.
Theme 2 AO for Extremely Large Telescopes
Comparative Performance of a 30m Groundbased GSMT and a 6
Future Challenges Today’s burning questions in EGPN research, and the strategies, tools & techniques needed to answer them Outline: Overview (10 min) Open.
Probing the IMF Star Formation in Massive Clusters.
Scientific Potential Current Design Efforts Complementarity with JWST
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

AGENDA l New Initiatives Office concept, purpose of NIO Advisory Committee –Smith l Science Case – Strom l Technology considerations – Oschmann l Near term plans – Stepp l Programmatic commitments, long term plans – Mould l Discussion/feedback

What is the AURA New Initiatives Office? Partnership between Gemini, NOAO and our communities Science Drivers for a 30m Complementarity to other facilities (e.g. NGST) Implementation Concepts Resources Interfaces or Partnership Issues

AURA NIO: Mission “The mission of the AURA NIO is to ensure broad astronomy community access to a 30m telescope contemporary in time with ALMA and NGST, by playing a key role in scientific and technical studies leading to the creation of a GSMT.”

Goals of the NIO l Foster community interaction on GSMT l Develop point design l Conduct studies of key technical issues and relationship to science drivers l Optimize community resources by: –exploring design options that yield cost savings, –emphasize studies that benefit multiple programs, –collaborate to ensure complementary efforts, –give preference to technologies that are extensible to even more ambitious projects.

A Few Guiding Principles l U.S. effort will likely be a private/public partnership. If so, public/community involvement should begin at the outset. l NIO will seek to establish collaborations with all partners demonstrating a commitment to this same goal and evidence of a viable program. l NIO work will advance generally applicable scientific and engineering concepts of general interest. l Committed to free and open exchange of information. l NIO will maintain all possible options for international collaboration.

NIO Structure Management unit of AURA –Reports to AURA President Partnership between Gemini and NOAO Activities overseen by management board –AURA president; directors of NOAO; Gemini –Project Manager; Project Scientist (ex officio) Guidance from NIO Advisory Committee

AURA New Initiatives Office Adaptive Optics Ellerbroek/Rigaut (Gemini) Controls George Angeli

NIO ADVISORY COMMITTEE John CasaniJet Propulsion Laboratory Alan DresslerCarnegie Observatory Richard EllisCaltech Bob FugateStarfire Optical Range Jay GallagherUniversity of Wisconsin Bob GehrzUniversity of Minnesota Roberto GilmozziEuropean Southern Observatory Riccardo GiovanelliCornell University Bob KirshnerHarvard-Smithsonian, CfA Rolf KudritzkiUniversity of Hawaii Simon LillyHIA Joe MillerUniversity of California Jerry NelsonUniversity of California Larry RamseyPenn State University Chuck SteidelCaltech Present Members

Charge to the Committee l Advise and comment on the NIO program l Identify opportunities for collaboration with other groups l Broad exchange of technical and scientific ideas

NIO Objectives: General Involve the community in:  designing; instrumenting; operating a GSMT  developing the necessary partnerships Make use of AURA’s technical experience Develop capabilities that contribute value- added to GSMT efforts  science; instruments; AO; sites; structures

NIO Interfaces Community task groups; workshops NSF NASA – GSMT and NGST form a complementary system Potential collaborators: CELT; IfA; Canada; Mexico; ESO … Private sector/government lab consultants AURA System Committee –GSMT will be the apex of US System –System facilities must complement & support GSMT

Developing Science Cases Two community workshops ( ) – Broad participation; wide-ranging input Tucson task group meetings (SEP 2000) – Large-scale structure; galaxy assembly – Stellar populations – Star and planet formation NIO working groups (MAR 01 – SEP 01) – Develop quantitative cases; simulations NIO-funded community task groups (CY 2002) NIO-funded community workshop (CY 2002) – Define “Science Reference Mission”

GSMT Science Case “The Origin of Structure in the Universe” From the Big Bang… to clusters, galaxies, stars and planets Najita et al (2000,2001)

Tomography of the Universe Goals: Map out large scale structure for z > 3 Link emerging distribution of gas; galaxies to CMB Measurements: Spectra for 10 6 galaxies (R ~ 2000) Spectra of 10 5 QSOs (R ~15000) Key requirements: 20’ FOV; >1000 fibers Time to complete study with GSMT: 3 years Issues Refine understanding of sample size requirements Spectrograph design

Mass Tomography of the Universe z~0.5 Existing Surveys + Sloan z~3 Hints of Structure at z=3 (small area) 100Mpc (5 O x5 O ), 27AB mag (L* z=9), dense sampling GSMT1.5 yr Gemini50 yr NGST140 yr

Tomography of Individual Galaxies out to z ~3 Determine the gas and mass dynamics within individual Galaxies Local variations in star formation rate  Multiple IFU spectroscopy R ~ 5,000 – 10,000 GSMT 3 hour, 3  limit at R=5, ”x0.1” IFU pixel (sub-kpc scale structures) J H K

Origins of Planetary Systems Goals: Understand where and when planets form Infer planetary architectures via observation of ‘gaps’ Measurements: Spectra of 10 3 accreting PMS stars (R~10 5 ;  ) Key requirements: On axis, high Strehl AO; low emissivity Time to complete study with GSMT: 2 years Issues Understand efficacy of molecular ‘tracers’ Trades among emissivity; sites; telescope & AO design

Probing Planet Formation with High Resolution Infrared Spectroscopy Planet formation studies in the infrared (5-30µm):  Planets forming at small distances (< few AU) in warm region of the disk Spectroscopic studies:  Residual gas in cleared region emissions  Rotation separates disk radii in velocity  High spectral resolution high spatial resolution  8-10m telescopes with high resolution (R~100,000) spectrographs can detect the formation of Jupiter-mass planets in disks around nearby stars (d~100pc). S/N=100, R=100,000, >4  m Gemini out to 0.2kpc sample ~ 10s GSMT 1.5kpc ~100s NGST X

Stellar Populations Goals: Quantify IMF in different environments Quantify ages; [Fe/H]; for stars in nearby galaxies Develop understanding of galaxy assembly process Measurements: Spectra of ~ 10 5 stars in rich, forming clusters (R ~ 1000) CMDs for selected areas in local group galaxies Key requirements: MCAO delivering 2’ FOV; MCAO-fed NIR spectrograph Time to complete study with GSMT: 3 years Issues – MCAO performance in crowded fields

GSMT System Considerations Science Mission - DRM’s GSMT Concept (Phase A) Support & Fabrication Issues Active Optics (aO) Site Characteristics Enclosure protection Adaptive Optics Instruments Full System Analysis

End-to-End Approach l Science Requirements (including instruments) l Error Budget l Control systems l Enclosure concept –Interaction with site, telescope and budget l Telescope structure –Interaction with wind, optics and instruments l Optics –Interaction with telescope, aO/AO systems and instruments l AO/MCAO –Interaction with telescope, optics, and instruments l Instruments –Interaction with AO and Observing Model

Derived Top Level Requirements

The Enemies….. l Wind….. l The Atmosphere……

Enabling Techniques l Active and Adaptive Optics l Active Optics already integrated into Keck, VLT and Gemini l Adaptive Optics “added” to Keck, Gemini (and soon) VLT  Active and Adaptive Optics will have to be integrated into GSMT Telescope and Instrument concepts from the start

GSMT Control Concept LGSs provide full sky coverage Deformable M2 : First stage MCAO, wide field seeing improvement and M1 shape control 10-20’ field at ” seeing 1-2’ field fed to the MCAO module  M2: rather slow, large stroke DM to compensate ground layer and telescope figure,  or to use as single DM at >3  m. (~8000 actuators)  Dedicated, small field (1-2’) MCAO system (~4-6DMs). Focal plane Active M1 (0.1 ~ 1Hz) 619 segments on 91 rafts

Control Systems

Zernike modes Bandwidth [Hz] ~100 ~50 ~20 ~10 2 Offloading of Decentralized Controllers aO (M1) AO (M2) Main Axes LGS MCAO Secondary rigid body temporal avg spatial & temporal avg spatial avg

An enclosure is essential: Scaled up and taller variation of JCMT Enclosure

30m Giant Segmented Mirror Telescope Point Design Concept 30m F/1 primary, 2m adaptive secondary GEMINI

30m Giant Segmented Mirror Telescope Initial Structural Model Horizon Pointing - Mode 1 = 2.16 Hz

Wind Loading l Driving characteristic may be wind –Lower wind sites with good seeing –How to protect telescope Enclosure needs May be more limiting than local seeing to performance Cost drivers Advance methods for correcting More critical than for existing telescopes

Animation Wind pressure: c00030oo test_2, day_2, Azimuth angle=00, Zenith angle=30, wind_gate:open, open; wind speed=11 m/s

Average Pressure PSD Data - Effect of Enclosure Shutters

Average Pressure PSD by EL  Note: No elevation dependence on average pressure on primary

How to scale to 30 meters: Average Pressure SF (C00030oo) D(d) = d M RMS pressure differences Spatial scale

Response to Wind Current concept will now go through “second iteration” of design in response to wind analysis

AO Technology Constraints (50m telescope) r 0 (550 nm) = 10cm No. of Computer CCD pixel Actuator pitch S(550nm) S(1.65  m) actuators power rate/sensor (Gflops) (M pixel/s) 10cm 74% 97% 200,000 9 x cm 25% 86% 30,000 2 x cm 2% 61% 8,000 1, SOR (achieved) 789 ~ 2 4 x 4.5 Early 21 st Century technology will keep AO confined to > 1.0  m for telescopes with D ~ 30m – 50m

MCAO on a 30m: Summary MCAO on 30m telescopes should be used  m l Field of View should be 1-2 arcminutes, l Assumes the telescope residual errors ~ 100 nm rms l Assumes instrument residual errors ~ 70 nm rms –Equivalent Strehl from focal plane to detector/slit/IFU > 1 micron –Instruments must have: very high optical quality very low internal flexure (  m) Delivered Strehl ~ ~ ~ Sodium laser constellation 4 tip/tilt stars (1 x 17, 3 x 20 Rmag) PSF variations < 1% across FOV Rigaut & Ellerbroek (2000)

8,960 actuators, 30cm spacing on Primary 3,225 actuators, 50cm spacing 50cm actuator pitch Good conditions (0.5" seeing): lambda diameter["] %energy cm actuator pitch Good conditions (0.5" seeing): lambda diameter["] %energy GSMT will need an Adaptive Secondary Options: from low to high order

Sky coverage and Strehl for narrow field, thermal infrared observations using an adaptive secondary (wind buffeting on M1) (Rigaut, 2001)  for >  single laser beacon required

GSMT Implementation Concept - MCAO/AO foci and instruments MCAO optics moves with telescope Narrow field AO or narrow field seeing limited port MCAO Imager at vertical Nasmyth elevation axis 4m Oschmann et al (2001)

Modeling versus Data 20 arcsec M15: PSF variations and stability measured as predicted GEMINI AO Data Model Results 2.5 arc min.

Comparative performance of a 30m GSMT with a 6.5m NGST Assuming a detected S/N of 10 for NGST on a point source, with 4x1000s integration GSMT advantage NGST advantage R = 10,000 R = 1,000 R = 5

High resolution, high Signal/Noise observations GSMT observation ~ 40 mins (30 mas beam) Detecting the molecular gas from gaps swept out by a Jupiter mass protoplanet, 1 AU from a 1 M O young star in Orion (500pc) Carr & Najita 1998)

Instruments Telescope, AO and instruments must be developed as an integrated system NIO team developing design concepts – Prime focus wide-field MOS – MCAO-fed near-IR MOS – MCAO-fed near-IR imager – AO-fed mid-IR HRS – Wide-field deployable IFU spectrograph Build on extant concepts where possible Define major design challenges Identify needed technologies

GSMT Implementation concept 20 arcmin. wide field MOS Barden et al (2001)

Optical “seeing improvement” using low order AO correction 16 consecutive nights of adaptive optics the CFHT Image profiles are Lorenzian

GSMT Implementation Concept - wide field MOS 20 arc minute MOS on a 30m GSMT ” fibers R=1, nm – 650nm R=5, nm – 530nm Detects 13% - 23% photons hitting 30m primary 1m Barden et al (2001)

Spot Diagrams for Spectrograph R=1000 case with 540 l/mm grating. R=5000 case with 2250 l/mm grating. 350 nm440 nm500 nm560 nm650 nm 470 nm485 nm500 nm515 nm530 nm On-axis Circle is 85 microns equal to size of imaged fiber. Barden et al (2001)

MCAO Optimized Spectrometer l Baseline design stems from current GIRMOS d-IFU tech study occurring at ATC and AAO –~2 arcmin deployment field – µm coverage using 6 detectors l IFUs –12 IFUs total ~0.3”x0.3” field –~0.01” spatial sampling R ~ 6000 (spectroscopic OH suppression)

Accomplishments to Date Core NIO team in place and working Point design structural concept developed by SGH AO system concept Instrument concepts MCAO imager MCAO NIR MOS IFU spectrograph Wide-field prime-focus MOS High resolution mid-IR spectrograph “Enhanced seeing” system concept Chilean site characteristics assembled Wind loading tests completed at Gemini N+S Initial analysis of point design underway

AURA New Initiatives Office Adaptive Optics Ellerbroek/Rigaut (Gemini) Controls George Angeli

Accomplishments to Date Core NIO team in place and working Point design structural concept developed by SGH AO system concept Instrument concepts MCAO imager MCAO NIR MOS IFU spectrograph Wide-field prime-focus MOS High resolution mid-IR spectrograph “Enhanced seeing” system concept Chilean site characteristics assembled Wind loading tests completed at Gemini N+S Initial analysis of point design underway

Objectives: Next 2 years l Develop point design for GSMT & instruments l Attack key technical problems –Adaptive optics –Wind loading –Mirror segment fabrication l Involve the community in defining GSMT science and engineering requirements l Involve the community in defining instrumentation options; technology paths l Carry out conceptual design activities that support and complement other efforts l Develop a formal partnership to build GSMT

Deliverables over 2 years Analysis of “point design” (Q4 2001) Initial science - requirements flowdown Conceptual designs for major instruments Roadmap for – key studies – enabling technologies Design concept for GSMT; key subsystems –collaborative with other groups l Site requirements and initial testing l Negotiated partnership to design; build GSMT

Objectives: Next Decade Complete GSMT preliminary design (2Q 2005) Complete final design (Q4 2007) Take the lead in building – a key subsystem – a major instrument Serve as locus for –community interaction with GSMT consortium –ongoing operations –defining; providing support capabilities –defining interactions with NGST

Key Milestones 2Q01: Establish initial science requirements 3Q01: Complete initial instrument concepts 3Q01: Complete point design analysis 2Q02: Identify key technology studies 1Q03: Fund technology studies 1Q03: Complete concept trade studies 2Q03: Develop MOUs with partner(s) 2Q03: Initiate Preliminary Design 4Q03: Complete SRM; establish science requirements 2Q05: Complete Preliminary Design 4Q05: Complete next stage proposal

Resources: Next 2 years Core NIO activities: $2.1M – Support core NIO staff (‘skunk works team’) Analyze point design Develop instrument and subsystem concepts – Support Gemini and NOAO staff to – Explore science and instrument requirements – Develop systems engineering framework Support community studies: $1.5M – Enable community efforts: science; instruments – Enable key external engineering studies – Support alternative concept studies

Resources: Next Decade $15M in CY from NOAO base – Enables start of Preliminary Design with partner $25M in CY from NOAO base Create a ‘wedge’ of ~$10M/yr by 2010 – Enables NOAO funding of Instrument development Operations