MMSD’s 2011-2020 Infiltration and Inflow Private Property Program Purpose of the program is to reduce infiltration and inflow from private property to.

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
12/30/99Public Forum - Sewer Lateral RESIDENTIAL SEWER LATERAL REPAIR PROGRAM Proposition 1 on the April 6, 1999 Election Ballot Ordinance 19,
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Storm Water Mitigation Program March 17, Purpose of the Program Connections to the public sewer system within private residences or on private property.
2010 DCA CDBG Applicants’ Workshop New for 2010 & Important Reminders.
Workshop on Clear Water Cross Connections & Inspections 7/23/2012.
Central Texas Turnpike Project. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike Project.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Building a Special Education Infrastructure Through a Joint Power Authority.
Idaho High School Wireless Project Joyce Popp Chief Information Officer.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
New Vision Industries Business Incubator Copyright 2005 © Enterprise Development Group, Inc. Business Funding Match Enterprise Development Group.
GLOBAL LESSONS: DESIGNING CDD OPERATIONS Samantha de Silva HDNSP April 2005.
Basement Flooding Improvement Program Town Hall Meeting, Ward 33 May 21, 2009.
Rental Assistance Demonstration (RAD) Opportunity July 13, 2015 Resident Information Meeting Housing Authority of the City of Milwaukee.
Supporting and investing in Camden’s voluntary and community sector (VCS) Proposed investment and support programme.
MINISTRY OF WATER AND IRRIGATION REVIEW OF FINANCIAL FLOWS TO WATER SECTOR BY ENG. P. MANGITI DIRECTOR LAND RECLAMATION/HEAD DONOR COORDINATION UNIT.
BUYING A HOUSE Are You Ready?. Advantages of home Ownership Sense of stability and permanence Allows individual expression Can have pets Financial Benefits.
Sidewalks February 13,  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Tax Increment Thomas Chapman Raymond James John Repsholdt Ehlers Steven Langert Consolidated High School District 230.
Biennial Budget Budget Message Presented by Chris Jordan, City Manager April 27, 2009.
Commonwealth Housing Task Force Draft – For Final Review Confidential – Not for Distribution Zoning Overlay Districts & State Financing Recommendations.
Construction Contracts and Project Delivery Methods
Toronto Catholic District School Board Budget Consultation Meeting Catholic Education Centre May 5, 2008.
Mock State Aid Project County Highway Accountant’s Conference 2015.
Proposed Modifications to the Gated Community Ordinance Board of County Commissioners April 8, 2008.
State Rates Advisory Committee: Various Rate Updates December 2005 State of Montana Helena, Montana Davis Deshaies, LLC.
Early Market Briefing Proposed tender for the Australia-Timor-Leste Partnership for Human Development (ATLPHD) 14 September 2015, Dili.
Board Member Questions Concerning School Finance Dr. Tony Prothro Assistant Executive Director ASBA New Board Member Conference October 15, 2012.
Builders’ Risk. Define the intent of the policy Understand exposures Discuss why owner should purchase the policy Who is Insured? Underwriting Information.
E-Rate Training for TASBO Members October 8, 2008 Presented by Susan Sullivan Director of Technology/Media.
MUNICIPAL SYSTEMS BILL September LEGISLATION n Municipal Demarcation Act, 1998 n Municipal Structures Act, 1998 n Municipal Systems Bill (1999)
M ICHIGAN P UBLIC S ERVICE C OMMISSION Energy Optimization Plans 2011 Biennial Review Pre-Filing Update Rob Ozar, Manager Energy Optimization Section March.
STAKEHOLDER CALL/MEETING TO DISCUSS AND PROVIDE INPUT ON ZEV INCENTIVE PROGRAM GUIDELINES CALIFORNIA AIR RESOURCES BOARD March 7,
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Post-Award basics MATTHEW MOORE ASSOCIATE DIRECTOR, POST-AWARD OPERATIONS.
Michigan Minority Contractors Association October 2, 2015.
Smoke Testing Information
December 2015 Detailed Presentation STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS CALIFORNIA Water Boards.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Immediate Threat and Danger Program Pam Truitt  September 10, 2015.
Illinois Green Infrastructure Grant Program (IGIG) ABC’s and 123’s of Illinois EPA’s newest grant program Jan Carpenter Illinois EPA
1.  Understand ESEA and the purpose of Title I, Part A Programs and Services  Understand how to communicate and plan with private schools  Understand.
MW-AT E Addressing the Challenges of Recovery & Rebuilding from Hurricanes Katrina & Rita Rebuild Louisiana Housing Programs February 20,
Rural Ohio Technology Infrastructure Group All Transportation Counts Conference October 8, 2003.
1 Section 3 Certification City of St. Louis Community Development Administration NOFA Presentation January 29, 2016.
Budgeting Unit 4 Further aspects of management accounting Mr. BarryA-level Accounting Year 13.
Construction Management At Risk Process
Autumn Staff briefings As a NHS patient, care is provided free at the time you need it, whether this is from a hospital or community nurse or.
Effectiveness of Private Property Infiltration and Inflow Reduction efforts in East Tosa October 14, 2014: Wauwatosa Budget and Finance Committee Meeting.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1% Sales Tax Commission Board Meeting June 3, 2015.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
Orange County Water and Wastewater Utility Bonds, Series 2016 Discussion Agenda March 15, 2016 Orange County.
Community Crossings Matching Grant Fund Program Kathy Eaton-McKalip
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
Welcome to the Libertyville Stormwater Master Plan Open House
County Highway Accountant’s Conference 2015
Hurricane Matthew Recovery
Implementing the Transportation/Land Use Connection Program
HOME Underwriting and Subsidy Layering Training
Sponsored Programs at Penn
Residential Sewer Lateral Maintenance Program Analysis
Presentation transcript:

MMSD’s Infiltration and Inflow Private Property Program Purpose of the program is to reduce infiltration and inflow from private property to reduce the risk of basement backups.Purpose of the program is to reduce infiltration and inflow from private property to reduce the risk of basement backups. o Comment: Effort should not be sold as a guaranteed solution. Staff is still putting together the mechanics of the program.Staff is still putting together the mechanics of the program. Today we want to discuss various concepts and get your feedback.Today we want to discuss various concepts and get your feedback.

Proposal is to spend $157 million between Proposal is to spend $157 million between Focus of program is to fund disconnections of foundation drains; repair or rehabilitation of private laterals; other actions to reduce known sources of infiltration and inflow.Focus of program is to fund disconnections of foundation drains; repair or rehabilitation of private laterals; other actions to reduce known sources of infiltration and inflow. o Comment: Should not disconnect foundation drains without planning for where the water will go. District can not fund work on locally owned public infrastructure, whether storm or sanitary.District can not fund work on locally owned public infrastructure, whether storm or sanitary. o Local storage may be a more cost effective option. There will be a large public education component.There will be a large public education component. What do we know today?

Initial Vision -- A Neighborhood by Neighborhood Approach Municipalities will determine priority areas for I/I private property work.Municipalities will determine priority areas for I/I private property work. Plan will be submitted to the District.Plan will be submitted to the District. District will provide funding to the Municipalities.District will provide funding to the Municipalities. Options on the table – may be possible for District to lead work to provide economies of scale.Options on the table – may be possible for District to lead work to provide economies of scale. o Comment: There should be local control over all aspects of the program.

Equalized Value Allocation Funding Over the ten years of the program, funding will be provided to municipalities on a proportional basis, based on equalized value.Over the ten years of the program, funding will be provided to municipalities on a proportional basis, based on equalized value. o Comment: Certain communities may not have enough I/I private property work to utilize all the funding. o Newer communities may have fewer I/I issues than older communities. At the outset, all municipalities have PP I/I work to be done.

1.Prioritization of Areas for Work 2.Funding for Design and Planning 3.Eligible Work 4.Credits and Debits 5.Procurement 6.New Rules 7.Cost Share Variety of Issues for Discussion

1. Prioritization of Work Municipalities will be asked to provide a list of priority neighborhoods.Municipalities will be asked to provide a list of priority neighborhoods. Identify priority neighborhoods based on all your available information: basement backup reports, sewer overflows, flow monitoring data, age of construction.Identify priority neighborhoods based on all your available information: basement backup reports, sewer overflows, flow monitoring data, age of construction. District will perform “common sense” review.District will perform “common sense” review.Feedback?

2. Funding for Design, Planning, Investigation Want to focus resources on actual remediation work.Want to focus resources on actual remediation work. District has hired a consultant to do work across municipalities.District has hired a consultant to do work across municipalities. Program funding for design, investigation work per municipality to be capped at an amount equal to 2x a municipality’s 2011 equalized value allocation.Program funding for design, investigation work per municipality to be capped at an amount equal to 2x a municipality’s 2011 equalized value allocation. o Comment: Cap investigation work at 20% of total. Does this approach make sense?

3. Eligible Work Foundation drain disconnection will be eligible. Repair or replacement of deteriorated laterals will be eligible.Foundation drain disconnection will be eligible. Repair or replacement of deteriorated laterals will be eligible. No requirement for an inspection of laterals if known information (age, type of construction, location) indicates laterals likely to be a problem.No requirement for an inspection of laterals if known information (age, type of construction, location) indicates laterals likely to be a problem. Other remedies will be considered and approved if effective (like foundation drain switches).Other remedies will be considered and approved if effective (like foundation drain switches).

3. Eligible Work continued Overland flooding issues may be eligible on a case by case basis (cross reference BMP program).Overland flooding issues may be eligible on a case by case basis (cross reference BMP program). o Comment: Overland flooding should be eligible where it contributes inflow. Correction of currently illegal connections would not be eligible. Backflow valves/hung plumbing would not be eligible.Correction of currently illegal connections would not be eligible. Backflow valves/hung plumbing would not be eligible. o Comment : Do not fund correction of illegal situations. Plan for work would be submitted by Municipality to District for approval. Plan for work would be submitted by Municipality to District for approval.Comments?

4. Credits and Debits Each year, each Municipality would get an allocation of the funding based on Equalized Value (a “credit”).Each year, each Municipality would get an allocation of the funding based on Equalized Value (a “credit”). Municipalities would be authorized to spend money faster and be reimbursed (a “debit”) in later years.Municipalities would be authorized to spend money faster and be reimbursed (a “debit”) in later years. o Comment: This is a good idea. District would not cover interest costs, but this could be a way to move work to earlier years.District would not cover interest costs, but this could be a way to move work to earlier years. Questions or comments?

5. Procurement Municipalities could procure work in a number of ways: public bid packages, homeowner reimbursements, pre-approving contractors. The District will require a competitive process to ensure good pricing.Municipalities could procure work in a number of ways: public bid packages, homeowner reimbursements, pre-approving contractors. The District will require a competitive process to ensure good pricing. An option is for the District to assist with procurement. Some municipalities may prefer for the District to manage the procurement.An option is for the District to assist with procurement. Some municipalities may prefer for the District to manage the procurement.

5. Procurement As a means of “jump starting” work, District could directly contract for work in priority neighborhoods in This would be foundation drain disconnection and lateral repair/replacement.As a means of “jump starting” work, District could directly contract for work in priority neighborhoods in This would be foundation drain disconnection and lateral repair/replacement. o Comment: Municipalities should do work on private property, not MMSD. o Comment: MMSD should not try to push program too fast. o Comment: MMSD staff time should be equitably allocated to communities receiving service. Could identify economies of scale, pricing, and other issues useful in planning future years.Could identify economies of scale, pricing, and other issues useful in planning future years. Comments on this approach? o Comment: Do a pilot program first to ensure effectiveness.

6.New Rules Are new MMSD Rules needed to ensure the program is effective?Are new MMSD Rules needed to ensure the program is effective? o Comment: MMSD should not issue new rules. o Comment: MMSD should have an incentive for Time of Sale ordinances. Should rules require disconnection of foundation drains or repair or rehabilitation of laterals or both, but only if the owner is offered financial assistance?Should rules require disconnection of foundation drains or repair or rehabilitation of laterals or both, but only if the owner is offered financial assistance? If owner does not accept offer, should owner be required to make repairs at his sole expense by District rule?If owner does not accept offer, should owner be required to make repairs at his sole expense by District rule?

7. Cost Share Should there be a cost share requirement from municipalities?Should there be a cost share requirement from municipalities? Is a cost share hard to do (or impossible) for 2011 funding, as municipal budgets require more planning?Is a cost share hard to do (or impossible) for 2011 funding, as municipal budgets require more planning? Would a cost share be a disincentive or barrier to participation?Would a cost share be a disincentive or barrier to participation? o We have heard proposals ranging from zero cost share to a 50% cost share. o Comment: No required cost match will help gain public acceptance.

8. Mandatory Participation All municipalities should participate in this program. All municipalities have I/I from private properties.All municipalities should participate in this program. All municipalities have I/I from private properties. o Comment: All municipalities should participate. o Counter Comment: Some municipalities do not have excessive I/I. If a municipality performs no work, and makes no plans to perform work, the District will utilize the municipality’s allocation to do private property work in that municipality.If a municipality performs no work, and makes no plans to perform work, the District will utilize the municipality’s allocation to do private property work in that municipality. o Comment: Do not reallocate funding to other municipalities.

Next Steps For full consideration District needs feedback by December 14, 2010 or as soon as possible.For full consideration District needs feedback by December 14, 2010 or as soon as possible. Document with program details will be drafted in early December.Document with program details will be drafted in early December. Goal of January Commission Consideration.Goal of January Commission Consideration. Written comments are preferred:Written comments are preferred: Kevin Shafer, MMSD, 260 West Seeboth, Milwaukee WI