Chapter Two Hydrograph Convolution and Deconvolution

Slides:



Advertisements
Similar presentations
Hydrology Rainfall - Runoff Modeling (I)
Advertisements

Unit Hydrographs Ch-7 (Streamflow Estimation)
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Urbanization Minnesota, New Jersey and most other states are facing population and development increases. Flood water is increasingly difficult to handle:
Unit Hydrograph Reading: Applied Hydrology Sections , 7.5, 7.7,
Rainfall-Runoff Modeling
Unit Hydrograph The Unit Hydrograph Unit Hydrograph Derivation
Hyetographs & Hydrographs
Unit Hydrograph Reading: Sections , 7.5, 7.7,
Problem 1- Tabulated below are total rainfall intensities during each hour of a frontal storm over a drainage basin.
Unit Hydrograph Theory
Transforming the Runoff
Chapter Two Net Storm Rainfall. Hydrograph Vocabulary Rising limb, a falling limb, and a recession. The rising limb and falling limb are separated by.
UH Unit Hydrograph Model Response Functions of Linear Systems Basic operational rules:  Principle of Proportionality: f(cQ ) = c  f(Q)  Principle of.
Synthetic Unit Hydrographs
Chapter One Hydrologic Principles Flashlight and globe.
8.3 Solving Systems of Linear Equations by Elimination
Design Storms in HEC-HMS
ERT 246 Hydrology & Water Resources Engineering
Basic Hydrology & Hydraulics: DES 601
Chapter 7 – Solving Systems of Linear Equations
Runoff Hydrograph and Flow Routing
9.2 Solving Systems of Linear Equations by Addition BobsMathClass.Com Copyright © 2010 All Rights Reserved. 1 Step 1.Write both equations in the form Ax.
Precipitation Types Important for Real Time Input and Forecasting
HEC-HMS Runoff Computation.
ERT 246 Hydrology & Water Resources Engineering Siti Kamariah Md Sa’at School of Bioprocess Engineering, UniMAP.
Higher Geography Hydrosphere
Do Now : Evaluate when x = 6, y = -2 and z = The Quadratic Formula and the Discriminant Objectives Students will be able to: 1)Solve quadratic.
Hydrologic Analysis Dr. Phil Bedient Rice University.
Engineering Hydrology Discussion Ch. #6 Hydrographs
Chapter 4 Section 3. Objectives 1 Copyright © 2012, 2008, 2004 Pearson Education, Inc. Solving Systems of Linear Equations by Elimination Solve linear.
Synthetic UH Definition: Synthetic Hydrograph is a plot of flow versus time and generated based on a minimal use of streamflow data. Example: A pending.
CE 3354 Engineering Hydrology
Basic Hydrology: Rainfall-Runoff – I
Slide Copyright © 2009 Pearson Education, Inc. 7.2 Solving Systems of Equations by the Substitution and Addition Methods.
HEC-HMS Simulation Developing a Unit Hydrograph
1 Hydrographs-Cont.. 2 Objectives Ability to subtract groundwater (base flow) Ability to synthesize unit hydrographs for different storm durations using.
Rainfall-Runoff modeling Forecasting and predictingForecasting and predicting –Flood peaks –Runoff volumes Due to Large rain and snowmelt events ***especially.
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
Basic Hydrology & Hydraulics: DES 601
Module 7: Unit Hydrograph Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 7 1.
Precipitation Measurement
HYDROLOGY Lecture 10 Unit Hydrograph
Rainfall-Runoff modeling
Routing surface runoff to a basin outlet
Hydrologic Analysis (Bedient chapter 2)
Infiltration and unsaturated flow (Mays p )
S Curves From Mays, 2011, Ground and Surface Water Hydrology.
CE 3354 Engineering Hydrology
The Drainage Basin System
Module 6 Writing and Solving Two Step Equations
Using a unit hydrograph to determine storm streamflow
Hydrologic Analysis PART 1
المنحنى الزمني للتدفق في المجاري الطبيعية Stream Flow Hydrograph
Solving Word Problems Objective: Students will be able to write and solve equations based on real world situations.
Hydrograph Computation
Dr. Phil Bedient Rice University
SCS Dimensionless Unit Hydrograph
Why do Rivers Flood and How Can They be Managed?
Hyetographs & Hydrographs
Find: Qpeak [cfs] Time Unit Rainfall Infiltration
Find: 4-hr Unit Hydrograph
SCS Dimensionless Unit Hydrograph
Review: 6.5b Mini-Quiz 1. Solve: 9x2 – 100 = 0.
Hydrographs-Cont..
Solving Systems of Equations by the Substitution and Addition Methods
Sum and Difference Formulas
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
WinTR-20 Project Formulation Hydrology Using WinTR-20 for Small Watersheds What is Small ?? Some individuals are using WinTR-20 for subdivision planning.
Presentation transcript:

Chapter Two Hydrograph Convolution and Deconvolution

UH Convolution Suppose we had an excess (net) rainfall hyetograph and a 1-hour UH for an area, and we’d like to know what the actual storm hydrograph might look like.

The Procedure The procedure is a little like the time-area method we dealt with earlier. If you have the excess rainfall intensity in one hour increments, and the 1-hour UH, you can multiply the 1-hour UH by the rainfall intensity for each time interval, lag each resulting UH by the appropriate amount, and sum.

The Convolution Equation The UH Convolution formula is Where n is the time, Pi is the rainfall excess at time increment i and Ui is the unit hydrograph ordinate at time increment i.

An Example I’ll go through the example in your text, first the way your author does it, then by a much easier method. Next slide.

You can do this with a spreadsheet—you write the UH ordinates down columns, each multiplied by the rainfall intensity for that hour, then lag each successive UH until the rain stops, then sum.

And for homework, we will do a unit hydrograph convolution to derive a storm hydrograph for area 1

The Intent So if we can make a UH, we can construct hydrographs based on hyetographs. While these aren’t perfect, they can be calibrated for watersheds, with a goal of being able to adequately predict flooding.

Deconvolution If we had an actual storm hydrograph, and an excess rainfall hyetograph, we could produce the UH from them. We can solve each line of the convolution equation we used above IN ORDER for the U ordinates because each successive line adds only one unknown. The example in the text, which we will do in detail, illustrates this.

The deconvolution method Suppose we had a 4-hour rainfall that resulted in 7 hours of runoff, and we have a hyetograph and hydrograph for each. To get a UH, write out the convolution equations for this situation:   You can solve these equations for the U ordinates one at a time, starting at the first. Note that you wouldn’t have to solve the last three, because you’d already have all seven of the U ordinates.