Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.

Slides:



Advertisements
Similar presentations
Presented by Paul Almond – Datacentre UK
Advertisements

Data Center Business Overview
Windows Server Deployment and Management With System Center.
On-Demand Architecture for Network-Critical Physical Infrastructure
G.E. UPS Productline.
MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis Premium Power for Colocation Telecom Power Infrastructure Analysis February 27,
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
1 Vladimir Knežević Microsoft Software d.o.o.. 80% Održavanje 80% Održavanje 20% New Cost Reduction Keep Business Up & Running End User Productivity End.
APC by Schneider Electric – Strategies for managing distributed IT environments.
Cooling Product Positioning
Achieving Data Center Availability along with Efficiency by Management Systems Shimon Katz, Data Center Project Manager ELECTRICITY 2012 – Eilat, Israel.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
InfraStruxure for Small IT Spaces Solution Introduction.
Copyright 2009 FUJITSU TECHNOLOGY SOLUTIONS PRIMERGY Servers and Windows Server® 2008 R2 Benefit from an efficient, high performance and flexible platform.
Citrix Partner Update The Citrix Delivery Centre.
Copyright Green Revolution Cooling
Integrated Power, Cooling, and Rack Infrastructure for Critical Networks Increase Availability While Decreasing Your Total Cost of Ownership (TCO) REV.
Whiteboard Message for Cloud Computing Answering End user questions in 5 minutes with a white board 1.What is Cloud Computing? 2.How does Cloud computing.
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Restricted. For HP.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
All content in this presentation is protected – © 2010 American Power Conversion Corporation InfraStruxure ™ Management Software Eduard Bodor Senior System.
A Connected World in transformation NICE – DATACENTRES 2012 May 23 rd 2012 Paul-François CATTIER Global Data Centre Solution VP.
IT ASSET MANAGEMENT (From Booz-Allen & Hamilton).
All content in this presentation is protected – © 2009 APC by Schneider Electric Core | High Density | Rev 0 Build a Better Data Center with APC and Cisco.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
© 2009 IBM Corporation New designs & methods for the Data Centre Brian Canney Global Services Executive Global Site & Facilities Services August 2009.
Private Cloud: Application Transformation Business Priorities Presentation.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Current trends in data centre outsourcing
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
Selling Consolidation’s Value. Why Consolidate? Reduce Complexity Increase Productivity Reduce TCO Improve End User Experience Improve IT Performance.
On-Demand Architecture for Network-Critical Physical Infrastructure Large Data Centers Small & Medium Data Centers Computer Rooms & Closets David Blumanis.
Data Center Consolidation & Energy Efficiency in Federal Facilities
Effectively Explaining the Cloud to Your Colleagues.
Sanbolic Enabling the Always-On Enterprise Company Overview.
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Data Center Solutions Marketing Data Center Business Advantage Customer Proof.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
APC InfraStruxure TM Central Smart Plug-In for HP Operations Manager Manage Power, Cooling, Security, Environment, Rack Access and Physical Layer Infrastructure.
Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate.
May 29, 2009 | Bangalore. Evolving Rules of the Business New business models will be required to meet demand / competition from fast growing economies.
Virtualization is only half the battle for efficiency in Data Centers Eduard Bodor System Engineer Romania & Bulgaria.
IBM Americas SMB © 2007 IBM Corporation 1 IBM Americas SMB Infrastructure Solutions Marketing 2007 IT Optimization: Getting more out of your IT with help.
Role of Infrastructure In Enhancing Business Continuity in Banks Tarun Makhija APC.
1 High Density Data Center Assessments. 2 Agenda About APC & what is APC’s value proposition to Cisco? Why are Cisco and APC data center services teams.
Citrix Solutions in Financial Services Joseph Alexander Delgado Business Development Manager, Citrix Wordtext Systems, Inc.
AT & T Cisco Corp. Mitsubishi Electric Time Warner Corp. Boeing Corp. Sprint Communications Hexal AG Deloitte & Touche Cap Gemini Goodyear Walt Disney.
Overview of Data Center Energy Use Bill Tschudi, LBNL
Most organization’s data centers that were designed before 2000 were we built based on technologies did not exist or were not commonplace such as: >Blade.
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Increasing Density Difficult to maintain 300 cfm per.
Optimizing Power and Data Center Resources Jim Sweeney Enterprise Solutions Consultant, GTSI.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
InfraStruXure Systems Alex Tavakalov
Setting up the Zeroth level of a Computational Grid Vincenzo Spagnoletti District Manager
Designing Cisco Data Center Unified Fabric
Dell EMC Modular Data Centers
Avenues International Inc.
Azure Infrastructure for SAP®
Server Consolidation and Virtualization
Cloud vs. On-premise 5 Advantages of Cloud Deployment
Carl Holmes Christy Lee
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Data Center Cooling Market.
Nlyte for Colocation Providers
Managed Content Services
Modular Edge-connected data centers
Modular Edge-connected data centers
Modular Edge-connected data centers
Presentation transcript:

Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise District Manager APC Philippines

© 2003 APC corporation. Agenda  About APC  Network-Critical Physical Infrastructure investment and their Imperatives  Maximizing the performance of your investment Availability Agility TCO  Next Step

© 2003 APC corporation. CIO Priorities: Top Initiatives Question: Which of the following technology initiatives are important to your organization …. Source: Survey by Ziff Davis Media # 1: Business Continuity & Downtime Prevention / Increased Availability

© 2003 APC corporation. Is Your Company experiencing these trends?  Rapid changes in IT technology  Regulatory requirements  Increasing availability expectations  High operating/service costs  High density  Server consolidation In response, APC is changing the way the world designs, installs, operates, manages and maintains Network- Critical Physical Infrastructure (NCPI). What is NCPI?

© 2003 APC corporation. What is Network Critical Physical Infrastructure (NCPI)? The facility, physical support, power, and cooling for Information Technology NCPI consists of: Power (UPS, Power Distribution) Air (Air Conditioners, Air Distribution) Rack (Enclosures, Cable Mgmt, etc.) Management (common platform) Services (professional & break/fix) Data Centres or “IT Rooms” could be as small as an oversized closet or as large as a 100,000 square foot facility!

© 2003 APC corporation. Essential foundation of reliability Network-Critical Physical Infrastructure (NCPI)

© 2003 APC corporation. Lifecycle Costs Adaptability/Modularity/Scalability Availability/Redundancy Manageability Serviceability NCPI Challenges

© 2003 APC corporation. 1.Optimize capital investment and available space 2.Accelerate Speed of deployment 3.Lower the cost of Service contracts Lifecycle Cost / Economics Challenges …

© 2003 APC corporation. Average Utilization of NCPI Forecasted capacity does not equal actual demand Over sizing results in lost capital & operating $$ Data centers are everbuilt to the most optimistic future needs that may ever be realized

© 2003 APC corporation. 4.Plan for a Power Density that is increasing and unpredictable 5.Adapt to ever changing environments 6.Vendor Neutral Mounting Adaptability/Modularity/Scalability Challenges …

© 2003 APC corporation. Power and Cooling requirements going up

© 2003 APC corporation. Heat Density Trends Source: The Uptime Institute - Reprinted with permission from a White Paper titled “Heat Density Trends in Data Processing, Computer Systems, and Telecommunications Equipment” v1.0

© 2003 APC corporation. 7.Minimize Human Error 8.Minimize points of failure between NCPI and the critical load 9.Reduce failure points that drop customers simultaneously 10.Eliminate Hot Spots Availability Challenges …

© 2003 APC corporation. Case Study of Downtime Failures Consistent with Surveys which attribute 60% or more of failures to Human Error

© 2003 APC corporation. Challenges …

© 2003 APC corporation. 11. Monitor Attributes at the Rack level 12. Provide predictive failure analysis Manageability Challenges …

© 2003 APC corporation. Challenges …

© 2003 APC corporation. 13. Decrease mean time to recovery 14.Simplify the complexity of the system Serviceability Challenges …

© 2003 APC corporation. Frequent IT changes create chaos resulting in human error They were not planned at all These systems were not planned to look like this

© 2003 APC corporation. The Business Value Equation for Network- Critical Physical Infrastructure Availability Agility TCO Value x = To Achieve Higher Business Continuity…

© 2003 APC corporation. Availability Agility TCO Value x =  Equipment Reliability  Mean-Time-To-Recover  Human Error

© 2003 APC corporation. Standardization enables improved availability  Modularize  Pre-test systems in the factory  Hot swappable  Pre-Integrate Power- Cooling-Rack Management & diagnostics  One-Time Engineering  Unique training requirements  On-site assembly  On-site testing  Custom programming StandardizeTo Eliminate Standardization accelerates learning at all levels, reducing human error and increasing availability

© 2003 APC corporation. Availability TCO Value x =  Speed of Deployment  Ability to Scale  Ability to Reconfigure Agility The inherent ability to scale due to our modular approach to NCPI allows rightsizing, lower upfront cost and react to changing business requirements..

© 2003 APC corporation. Traditional Approach (3-6 Mo.) Design Concept Construction Design Construction Commissioning Operation Custom Parts, Applications and Services “I need more capacity.” “I have more capacity.” Needs Assessment

© 2003 APC corporation.  The Design Concept is built on standardized parts that can be scaled to meet the need?  Construction Design incorporates a “Lego Block” approach of pre-engineered components?  Construction is mainly done in a factory instead of on-site?  Commissioning tests pre-integrated infrastructure systems. It should be that …..

© 2003 APC corporation. Availability Agility TCO Value x =  Capital Cost  Electricity Costs  Service Costs Oversizing is the dominant contributor…

© 2003 APC corporation. Waste due to over sizing Reference: APC White paper #37

© 2003 APC corporation. Reduced waste due to rightsizing

© 2003 APC corporation. The Business Value Equation for Network- Critical Physical Infrastructure Availability Agility TCO Value x =

© 2003 APC corporation. On-Demand Architecture for Network Critical Physical Infrastructure Changing the way the world designs data centers… InfraStruXure™ Symmetra PX InfraStruXure PDU NetShelter VX NetworkAIR FM  Wiring Closets (1-3 Racks)  Small Data Centers (5-20 racks) Smart-UPS NetShelter VX NetworkAir PA InfraStruXure TM  Computer Rooms (1-5 Racks) Symmetra RM NetShelter VX NetworkAir PA Symmetra PX InfraStruXure PDU NetShelter VX NetworkAIR FM  Medium Data Centers ( racks)  Large Data Centers (>100 racks) Symmetra MW InfraStruXure PDU NetShelter VX NetworkAIR FM InfraStruXure ™ for:

© 2003 APC corporation. After Before

The next step…  For the next project, challenge your team to: Dramatically increase availability Do it in half the time Right size to the current requirement Make sure it can adapt  To help you, we can team with your staff to: Survey opportunities for savings Develop options for increased availability Deliver scalable systems on short notice that minimize over-sizing

Questions?