Trade of Plumbing – Phase 2 Module 2 – Unit 11 Module 2: Domestic Hot and Cold Water Services Unit 11 – Sanitary Appliances Duration – 11 Hours.

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Air Gaps, Vacuum Breaker, and Back Flow Preventers TP 8 50 min.
Advertisements

ACTIVE LEARNING PROCESS
Domestic Hot and Cold Water Services
Unit 206: Domestic hot water systems
Waste Pipe from Bath The waste pipe from the bath should be a minimum of 40mm in diameter, it can be 50mm in diameter if there is a longer run of pipe.
Trade of Plumbing – Phase 2 Module 2 – Unit 6 Module 2: Domestic Hot and Cold Water Service Unit 6 – Soldering Duration – 32 Hours.
Unit 205: Cold water systems
Equipment and Facilities. 154 Plan Review The local health department must assess your facility and equipment before: –Beginning construction of a food.
 Materials & Fittings  What to buy  Quantity  Cost  Where to get them  When to buy i.e. before work starts  Blue print; this tells us the number.
Trade of Plumbing – Phase 2 Module 2 – Unit 5 Module 2: Domestic Hot and Cold Water Service Unit 5 – Bronze Welding Duration – 30 Hours.
WASH Cluster – Groundwater Pumping GWP GWP1 1 Groundwater Pumping Session 1 Handpumps.
Water Sensitive Plumbing And Sanitation BY:DINESH MUTHA Downloaded from CivilDigital.comCivilDigital.com.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Condensation Piping and Installation Drain Pans
Unit 205: Cold water systems
Trade of Plumbing – Phase 2 Module 2 – Unit 12 Module 2: Domestic Hot and Cold Water Services Unit 12 – Above Ground Sanitation Pipework Duration – 18.
How do each part of a W.C’s work? Don’t worry I will explain everything to you.
PLUMBING FIXTURES INTRODUCTION CLASSIFICATION WATER DEMAND TRAPS
Unit 205: Cold water systems
Unit 206: Domestic hot water systems
Whatever the nature of your business, often simple changes in behaviour or processes can save water and reduce your water bill. These water savings can.
Presentation on Installation of a Domestic Cold Water Storage Cistern
INTD 59 bathroom plumbing & fixtures. plumbing residential plumbing system provides water to various points throughout the home—understanding how water.
Safe Facilities and Equipment
Maintaining and Repairing Plumbing Systems Agriscience Content Standard: AC–31, AC–32, AC–34, AS–45.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Warm-up 4/6/15 What type of water do you have at your house? Objective:
1 HVACR316 - Piping Condensation Removal Refrigerant Traps Condensation Removal Refrigerant Traps.
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
Radon Overview How Radon Enters the Home. Learning Outcomes Upon completion of this module you will be able to:  Recall the predominant source of radon.
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
HVAC523 Circulator Pumps.
Trade of Plumbing – Phase 2 Module 3 – Unit 3 Module 3 Domestic Heating/MMA Welding Unit 3 – Domestic Heating System Installation Duration – 35 Hours.
ISH Innovation 2015 Pre-wall/flushing technology
Andrew Franks. A large bowl for urinating or defecating into, typically plumbed into a sewage system and with a flushing mechanism Vent distance- 10’
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
Trade of Plumbing – Phase 2 Module 2 – Unit 9 Module 2: Domestic Hot and Cold Water Services Unit 9 – Valves and Taps Duration – 11 Hours.
CON 4003/CVE 4073/CVE 5073 Construction Estimating Prof R. V. Locurcio.
Outcome 3 Pressure, force and flow of water Unit 203: Scientific principles for domestic, industrial and commercial plumbing.
Maintaining and Repairing Plumbing Systems Agriscience Content Standard: AC–31, AC–32, AC–34, AS–45.
Kitchens, Laundry Areas and Baths Chapter 22. Objectives 1. Explain basic principles for designing efficient kitchens, laundry areas and bathrooms. 2.
BASIC PLUMBING Theory, Repair, & Installation. PART ONE Overview & Safety  Objectives for the day.
DOMESTIC DRAINAGE SYSTEM 2012BC25444
1 Product Presentation January Normal BinROXELL Bin Old feed Normal bin: ‘centerflow’ feed flows first in center  bridging ‘mass flow’ feed.
House Drainage System By- Prajyoti P. Upganlawar
HOUSE DRAINAGE MEHTA ANJANI PRAFULBHAI =
EVAPORATION EVAPORATION By: Dr. Tahseen Ismail By: Dr. Tahseen Ismail.
Unit 209: Drainage systems
Unit 209: Drainage systems
Unit 209: Drainage systems
Plumbing is the directing of the flow of water. Usually considered in two parts Fresh water supply Pipes, fittings, and fixtures that supply hot and cold.
Water Supply System And Other Plumbing Fittings
Lubricating system Components
Mahatma Gandhi Institute Of Technical Education & Research centre ,Navsari. A presentation on House Drainage Subject :- Environmental engineering.
FIXTURES.
Approximate activity space required
Product Presentation January 2010.
Cleanliness of the Kitchen and Facilities
Electrical Gas Plumbing Heating & Cooling
PLUMBING APPLIANCES & COMPONENTS
by: FMM Malaysian Ceramic Industry Group (MCIG) October 2016
Hot water Systems Heaters.
Lubricating system Components
Cold water supply and Treatment
Cisterns and Insulation
Domestic Hot and Cold Water Service
Presentation transcript:

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Module 2: Domestic Hot and Cold Water Services Unit 11 – Sanitary Appliances Duration – 11 Hours

Trade of Plumbing – Phase 2 Module 2 – Unit 11 In this module we learn how to:  List the various types and applications of sanitary appliances.  Describe the working principles of sanitary appliances.  List the materials and design features of sanitary appliances.  Install siphon and ballvalve in WC cistern.  Fit taps and wastes in wash hand basins and baths.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Key Learning Points  RkVarious types and applications of sanitary appliance.  RkWorking principles of sanitary appliances.  Sc Principle of siphonic action.  RkAutomatic-flushing cisterns.  RkMaterials for sanitary appliances.  RkDesign features of sanitary appliances.  RkRecommended fitting heights, brackets and supports for sanitary appliances.  RkTraps and depth of water seal.  RkWaste pipe connections.  SkInstallation of ballvalve, siphon, handle in WC cistern.  SkFitting taps and wastes to basins and baths.  PGood working practice.  PProblem solving.  PWorking independently.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Sanitary Appliances Sanitary appliances are divided into two main groups:  “Waste” appliances  “Soil” appliances

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Waste Appliances ApplianceUse Bath Bidet Shower tray Wash hand basin Washing the body, for which reason they are frequently referred to as ablution appliances. Domestic sinkHousehold purposes Cleaner’s sinkFloor washing in large buildings Utensil sink Vegetable sink Large kitchens, for example canteens and hotels Drinking fountainDrinking water in schools, factories etc.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Soil Appliances ApplianceUse UrinalGentlemen’s toilet, usually in large buildings and public conveniences Water Closet (WC)Ladies toilets and domestic toilets Slop sinkFor use in hospitals Bed-pan washerAn item from the specialised range of equipment for hospitals

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Design and Construction of Sanitary Appliances  Durable (long lasting)  Impervious to water (it must not absorb water).  Resistant to corrosion (in order to make it long lasting and to be hygienic).  Simple in outline (so that there will be no crannies to hold dirt).  Smooth surfaced inside and out (for ease of cleaning and to be largely self cleansing internally as flushed in use).  With the inside so designed that the water will drain naturally to the outlet.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Materials for Sanitary Appliances The materials from which sanitary appliances are manufactured are dependent upon the type of fitment and the use of the building into which it is to be installed. In general terms the materials must be non-corroding, non-absorbent and easily cleaned.  Metal - Baths, shower trays and flushing cisterns are commonly made out of cast iron. The interior surfaces of cast iron baths and shower trays are vitreous enamelled.  Ceramic - Ceramic or Pottery ware used for WCs, wash hand basins, urinals, sinks and shower trays. The term ceramic means a substance made by firing clay and includes various forms of pottery such as fireclay, stoneware and vitreous china. Fitments manufactured from fireclay and stoneware are porous. Vitreous china is a special type of earthenware which, as a result of high firing temperature, is made impervious, i.e. will not absorb water.

Trade of Plumbing – Phase 2 Module 2 – Unit 11  Plastic - Acrylic plastic produces appliances that are very light in weight and cheap to manufacture. The plastic becomes soft when heated, so the appliances must always be exposed to cold water before being subjected to hot water, or mixing taps should be used.  Glass-reinforced polyester appliances are much stronger than those made from acrylic plastic, but they are more expensive. Baths and shower trays are often made from this material, and should have a good gel coat finish.  Vitreous enamelled pressed steel also used for the manufacture of baths and sink units. It is cheaper material but does not have the long lasting qualities of cast iron.  Stainless steel is also extensively used for WCs, sink units, urinal stalls and wash hand basins. Its properties are as follows:  It has a clean, pleasant appearance.  It is non-corrosive.  It is hard wearing.  It has no vitreous enamelled surface to chip.  It is easily cleaned.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Sanitary Appliances

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Flushing Cisterns The cistern is operated by depressing a lever which lifts the piston. Thi action forces or lifts a body of water over the crown of the siphon and into the flush pipe. Siphonic action is then created which empties the cistern.  For siphonic action to take place all siphons require a “short leg” and a “long leg”  In a WC cistern the short leg of the siphon is located within the cistern, and the long leg is created by the addition of a flush pipe to the outlet connection of the siphon. This pattern of cistern is the most common sort and is known as the “plunger” or “disc type” cistern.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Flushing Cisterns

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Crown

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Flush Pipe

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Flushing Cistern

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Bell-Type Flushing Cistern The bell-type flushing cistern is rather noisy but may be used in factories and schools. The cistern is operated by the chain being pulled down which also lifts the bell. When the chain is released the bell falls thus displacing water under the bell down the stand pipe. Siphonic action is then created which empties the cistern.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Bell Type Flushing Cistern

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Bell Type

Trade of Plumbing – Phase 2 Module 2 – Unit 11 W.C. Flushing Cistern Maintainence

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Wash Down PC Pans The wash down WC pan is cheap, simple and efficient and rarely becomes blocked. It is used in all types of buildings and is made from vitreous china, glazed fireclay or stonewash. The contents of the pan are removed by the momentum of the water flush. A high-level flushing cistern gives a good flush but is noisy. A low-level cistern gives a quieter flush, is neater and now more popular. The outlet of the pan may be horizontal, P, S left or right hand. A plastic connector is a popular outlet joint and only requires pushing over the outlet and into the soil pipe. The flush pipe joint is usually made by a rubber cone connector

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Wash Down PC Pan

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Wash Down PC Pan

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Connector Types

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Close Coupled Wash Down

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Clear of Floor Wash Down or Corbel

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Flush Pipe

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Siphonic Water Closets  Recommended for fixing in houses, flats, hotels, hospitals etc.  Have a larger water area and a deeper seal than ordinary wash-down types.  More expensive than the wash-down type.  Do not stand up as well to rough usage.  All types fall within the category of either single or double traps.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 A siphonic WC with two traps is known as the “exhaust action type”. Its action is as follows:  Flushing cistern lever is pulled down, causing water to pass down the flush pipe.  Water passing the end of the air pipe at A draws air from the space between the two traps at B, and creates a reduction in air pressure (partial vacuum) at this point.  Immediately, the greater pressure of the atmosphere acting on the surface of the water in the pan, sets up siphonic action and forces the water with its contents out of the pan.  This siphonic action is completed and the pan is emptied before the flush water enters the pan. The water therefore simply washes the pan down and refills the first seal.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Siphonic Action

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Siphonic Action

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Siphonic Action

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Double Trap Siphonic

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Slop Hopper

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Cleaners Sink

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Sink

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Drainer Types

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Sink

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Urinal

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Bowl Urinal

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Urinal Types

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Spray

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Bidets A sanitary fitting used for washing the lower parts of the body. Also can be used as a footbath. Bidets are usually classified in two distinct types:  Submerged inlet.  Over-rim-supply. Tap controls are placed to enable the user to adjust the flow rate and temperature of the water. With most submerged inlet bidets the rim seat may be warmed by an ascending spray which then fills the bowl for washing. To prevent back siphonage, most water authorities have special requirements for bidets with submerged inlets:  Non-return valves should be fitted to both the hot and cold supplies.  Hot and cold pipes to the bidet should be taken at least two metres above the appliance before being connected into the main supplies.  In some instances a separate cistern may be required. Bidets with over-rim supply are simpler to install and are supplied with water in the same manner as a wash basin.

Trade of Plumbing – Phase 2 Module 2 – Unit 11 Bidets