Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.

Slides:



Advertisements
Similar presentations
ILC Accelerator School Kyungpook National University
Advertisements

Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
ALCW at SLAC, January 7, 2004J. Rogers, A Damping Ring Primer1 A Damping Ring Primer J. Rogers Cornell University Linear collider emittance requirements.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
THE NEXT LINEAR COLLIDER DAMPING RING COMPLEX J.N. Corlett, S. Marks, R. Rimmer, R. Schlueter Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley,
ALCW at SLAC, January 7, 2004J. Rogers, Novel Schemes for Damping Rings1 Novel Schemes for Damping Rings J. Rogers Cornell University Improving dynamic.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Beam-beam effects in eRHIC and MeRHIC
CLIC Damping ring beam transfer systems
Large Booster and Collider Ring
Beam-beam Effects in Hadron Colliders
First Look at Nonlinear Dynamics in the Electron Collider Ring
Electron Polarization In MEIC
BINP Tau-Charm Project
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Capture and Transmission of polarized positrons from a Compton Scheme
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
Electron Rings Eduard Pozdeyev.
Kicker and RF systems for Damping Rings
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
Kicker specifications for Damping Rings
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Status and plans for crab crossing studies at JLEIC
MEIC New Baseline: Part 7
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider

Page 2 Collider Review Retreat February 24, 2010 Outline Big Picture Upgrade Path Main Parameter Space Electron Injector Damping Rings Damping Ring to Linac Beamline Linac Positron Source Beam Delivery System Interaction Region SiD, LDC, GLD, 4 th Detector Concepts Detector Parameters

Page 3 Collider Review Retreat February 24, 2010 Big Picture

Page 4 Collider Review Retreat February 24, 2010 Big Picture

Page 5 Collider Review Retreat February 24, 2010 Big Picture Polarized photocathode electron source (> 80% polarized) with Warm RF Buncher/Pre-Accelerator (76 MeV) 5 GeV Superconducting Injector Linac Electron and Positron Damping Rings (6.7 km circumference) Beam transport from the damping rings to the main linacs, followed by a two-stage bunch compressor system prior to injection into the main linac Undulator-based positron source powered by 150 GeV electrons Two 11 km long main linacs, utilizing 1.3 GHz SCRF cavities, operating at an average gradient of 31.5 MV/m to accelerate the beams up to 500 GeV 4.5 km long beam delivery system, which brings the two beams into collision with a 14 mrad crossing angle, at a single interaction point which can be shared by two detectors

Page 6 Collider Review Retreat February 24, 2010 Upgrade Path Upgrade Positron source to produce polarized beams Run facility as an e - -e - Collider Extend tunnels 11km for Energy upgrade to 1 TeV Collide electrons at IP with a high energy laser beam to produce photons and operate as an e - -γ or γ-γ Collider

Page 7 Collider Review Retreat February 24, 2010 Basic Design Parameters a) Value at 500 GeV Center of Mass Energy

Page 8 Collider Review Retreat February 24, 2010 Technology Challenges Beam instability and kicker hardware constraints in the damping rings Beam current, beam power and pulse length limitations in the main linacs Emittance preservation requirements, in the main linacs and in the beam delivery system; Background control and kink instability issues in the interaction region.

Page 9 Collider Review Retreat February 24, 2010 Nominal and Design Range

Page 10 Collider Review Retreat February 24, 2010 Parameter Options

Page 11 Collider Review Retreat February 24, 2010 Technical Challenges The SLC polarized electron source already meets the requirements for polarization, charge and lifetime. The primary challenge for the ILC electron source is the 1 ms long bunch train, which demands a laser system beyond that used at any existing accelerator. Electron Injector Functional Requirements Generate the required bunch train of polarized electrons (> 80% polarization) Capture and accelerate the beam to 5 GeV Transport the beam to the electron damping ring with minimal beam loss, and perform an energy compression and spin rotation prior to injection.

Page 12 Collider Review Retreat February 24, 2010 Injector Optics Beam Transport along the 76 MeV Warm Injector

Page 13 Collider Review Retreat February 24, 2010 Injector Optics Beam Envelope along the 76 MeV Warm Injector Beam Transport along the 5 GeV SRF Injector Linac

Page 14 Collider Review Retreat February 24, 2010 Injector Optics Beam Transport from Booster Linac to Damping Ring

Page 15 Collider Review Retreat February 24, 2010 Electron Source Parameters

Page 16 Collider Review Retreat February 24, 2010 Damping Ring Layout Technical Challenges Control of the electron cloud effect in the positron damping ring. This effect, which can cause instability, tune spread, and emittance growth has been seen in a number of other rings and is relatively well understood. Control of the fast ion instability in the electron damping ring. Development of a very fast rise and fall time kicker for single bunch injection and extraction in the ring (3ns bunch spacing) 6.7 km circumference 6 arcs and 6 straight sections Normal conducting transport system 250 m of superconducting wigglers in each damping ring 650 MHz RF system (1/2 linac frequency) Arcs composed of TME cells to minimize quantum excitation Straights composed of FODO cells to accommodate the damping wigglers, RF cavities and the injection/extraction regions Two families of sextupoles within TME cells for chromatic correction Functional Requirements Accept e- and e+ beams with large transverse and longitudinal emittances and produce the low- emittance beams required for luminosity production Damp incoming beam jitter (transverse and longitudinal) and provide highly stable beams for downstream systems Delay bunches from the source to allow feed-forward systems to compensate for pulse to pulse variations in parameters such as the bunch charge.

Page 17 Collider Review Retreat February 24, 2010 Damping Ring Parameters

Page 18 Collider Review Retreat February 24, 2010 Damping Ring RF Parameters

Page 19 Collider Review Retreat February 24, 2010 Damping Ring Optics

Page 20 Collider Review Retreat February 24, 2010 Damping Ring Dynamic Aperture Dynamic aperture of the ILC Damping Ring for relative momentum errors of -1%, 0% and 1% The thick green line represents the size of the injected positron beam.

Page 21 Collider Review Retreat February 24, 2010 Damping Ring to Linac Technical Challenges Control of emittance growth due to static misalignments, resulting in dispersion and coupling. Suppression of phase and amplitude jitter in the bunch compressor RF, which can lead to timing errors at the IP. RMS phase jitter of 0.24 between the electron and positron RF systems results in a 2% loss of luminosity. Functional Requirements Transport of the electron and positron beams from the damping rings at the center of the ILC accelerator complex to the upstream ends of their respective linacs Collimation of the beam halo generated in the damping ring Rotation of the spin polarization vector from the vertical to any arbitrary angle required at the IP Compression of the long Damping Ring bunch length by a factor of to provide the short bunches required by the Main Linac and the IP

Page 22 Collider Review Retreat February 24, 2010 Ring to Main Linac Optics From start of turn-around arc to match point at entrance of Main Linac

Page 23 Collider Review Retreat February 24, 2010 Ring to Main Linac Parameters

Page 24 Collider Review Retreat February 24, 2010 Linac

Page 25 Collider Review Retreat February 24, 2010 Linac Technical Challenges Achieving the design average accelerating gradient of 31.5 MV/m. Control of emittance growth due to static misalignments, resulting in dispersion and coupling. Control of the beam energy spread Functional Requirements Accelerate the beam while preserving the small bunch emittances Control of higher-order modes in the accelerating cavities Maintain the beam energy spread within the design requirement of 0.1 % at the IP Not introduce significant transverse or longitudinal jitter

Page 26 Collider Review Retreat February 24, 2010 Electron Linac Optics

Page 27 Collider Review Retreat February 24, 2010 Linac Parameters

Page 28 Collider Review Retreat February 24, 2010 Main 250 GeV Linac

Page 29 Collider Review Retreat February 24, 2010 Gradient Challenge

Page 30 Collider Review Retreat February 24, 2010 Positron Source Technical Challenges 150 m long superconducting helical undulator Ti-alloy target, which is a cylindrical wheel 1.4 cm thick and 1 m in diameter, which must rotate at 100 m/s in vacuum to limit damage by the photon beam Normal-conducting RF system which captures the positron beam, must sustain high accelerator gradients during millisecond-long pulses in a strong magnetic field, while providing adequate cooling in spite of high RF and particle-loss heating. Functional Requirements Generate a high-power multi-MeV photon production drive beam Produce the needed positron bunches in a metal target that can reliably deal with the beam power and induced radioactivity Capture and accelerate the beam to 5 GeV Transport the beam to the positron damping ring with minimal beam loss, and perform energy compression and spin rotation prior to injection.

Page 31 Collider Review Retreat February 24, 2010 Positron Source Parameters

Page 32 Collider Review Retreat February 24, 2010 Beam Delivery System Parameters Technical Challenges Tight tolerances on magnet motion (down to tens of nanometers) Uncorrelated relative phase jitter between the crab cavity systems Control of emittance growth due to static misalignments Control of backgrounds at the IP via careful tuning and optimization Clean extraction of the high-powered disrupted beam to the dump. Functional Requirements Measure the linac beam and match it into the Final Focus Protect the beamline and detector against mis-steered beams from the main linacs Remove any large amplitude particles (beam-halo) from the linac to minimize background in the detectors Measure and monitor the key physics parameters such as energy and polarization before and after the collisions.

Page 33 Collider Review Retreat February 24, 2010 Beam Delivery System Parameters

Page 34 Collider Review Retreat February 24, 2010 SiD Concept

Page 35 Collider Review Retreat February 24, 2010 LDC Concept

Page 36 Collider Review Retreat February 24, 2010 LDC Concept ¼ Cutout of LDC Detector Side View of Vertex Detector

Page 37 Collider Review Retreat February 24, 2010 GLD Concept

Page 38 Collider Review Retreat February 24, 2010 GLD Concept

Page 39 Collider Review Retreat February 24, th Detector Concept

Page 40 Collider Review Retreat February 24, 2010 Detector Parameters

Page 41 Collider Review Retreat February 24, 2010 Questions Thanks.