PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.

Slides:



Advertisements
Similar presentations
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Line Efficiency     Percentage Month Today’s Date
Recommendation of the Texas Test Plan Team and RMS to the TAC October 9, 2003.
Recommendation of Texas Test Plan Team to RMS July 17, 2003.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/28 Feb 2002 PA/QA Status1 PA/QA STATUS MPE /PACS/IGL.
PACS IQR 13 Jan 2005 PACS OBSW1/33 PACS On-board Software & User Manual A. Belbachir (UVIE/TUVIE, SPU) H. Feuchtgruber (MPE, SE) A. Mazy (CSL, DMC) S.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IQR ESTEC, 13 Jan 2005 Documentation1 G. Wildgruber MPE Garching Introduction to Documentation - CQM/AVM EIDP and IQR-
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
ELENA installation progress F. Butin / ELENA collaboration.
SRG Gantt Chart Template
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Jan 2016 Solar Lunar Data.
SPF MAG Quarterly Report – Feb 2015
Implementation Plan Ronald Drimmel (Project Manager)
13-block rotation schedule
RAASA Report 02 November 2018.
Project Status: [Project Name]
Due Dates subject to change. Watch for dashboard updates.
RAASA Report 04 September 2017
RAASA Report 22 December 2016.
RAASA Report 20 December 2018.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Safety Group Program Timeline
2014 Advantage Program Timeline Guide *** Progress Visits ***
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Births as per Civil Registration System,
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
LCLS-II Cryoplant Controls Workshop.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
2017 Advantage Program Timeline Guide
Stakeholder Event 08 September 2016
Safety Group Program Timeline
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2013 Safety Group Advantage Program Timeline
Presentation transcript:

PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching

PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …2 Important Events CAPTEC audit of on-board S/W completed (IFSI, UVIE, CSL) –Reports are available –Debriefing meeting with Project still missing !? DRB´s for AVM/CQM completed –DRB on 22/23 Nov: FPU delivered to Astrium on 26 Nov 04 –Delta-DRB for WE on 8 Dec 04: WE delivered on 10 Dec 04 Latest developments –CQM FPU mounted on OB: NCRs against all L0 straps –WE: ILT EGSE test succesfully completed –WE: CCS: many problems with missing cables, bridge files –WE: mounted on SVM panel, WIH integrated, bonding ok

PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …3 Funding/Contracts MPE –Funding proposal (PACS Instrument) for 2005/2007 approved by DLR CSL/OIP –PRODEX helped to solve severe Belgian funding problem (Dec 04) IFSI –Italian ICC funding until end of 2005 approved by ASI –New contract for QM and FM manufacture approved, but not yet signed IAC –Funding for QM and FM manufacture approved UVIE –Funding secured until end 2005, but reduced travel money  Impact on S/W testing

PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …4 FM Schedule I  WE has severe schedule problems: Herschel DPU/ICU Meetings: Project, ASI, CGS, IFSI, 3 PI/PM´s: –2 April 04, ASI / 27 May 04, IFSI / 29 July 04, CGS / 2+3 Sep 04, IFSI Herschel/Planck CRISA Meetings: Project, CRISA, PM´s: –8 July 04, CRISA / 26 Aug 04, CRISA PACS DECMEC Meetings: Project, Prodex, CSL, OIP, MPE: –16 June 04, ESTEC / 14 July 04, OIP AVM2QMFM DPUDec 04 end March 05 end Sep 05 SPU (EM) - end June 05 DECMEC mid Feb 05 ? end Sep 05 ? BOLC end June 05 mid Nov 05

PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …5 FM Schedule II Delivery dates to KT –FPU structural itemscw 37/40, 2004 –Filterscw 5, 2005 –Choppercw 7 + –Gratingcw 9 + –PhFPUcw 30 –Ge:Ga detector array assemblycw 35 (CRE/module integration and test, detector array integration and test are on critical path) FPU delivery to MPEcw 38 (mid Sep) FM ILT6 months FM delivery to Projectearliest mid March 06 !