David Romo Paterson & Cooke, Chile Ray Martinson Paterson & Cooke, Chile New Projects: Conventional or High Density Tailings?

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

The Caserones Project October 2014 Mr. Héctor Sepúlveda O.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
1. About us Ambiotek SpA, is a spin off from Universidad de Santiago de Chile, that develops and offers environmental solutions for the mining industry.
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
HIGH CONCENTRATION FILL TECHNOLOGY – A NEW AREA ON ASH UTILIZATION By Dr. C. N. Ghosh, Chief Scientist Central institute of mining & fuel research ( Council.
By John Wates and Michael Knight Fraser Alexander An evaluation of cyclone performance to improve the quality of cyclone underflow material for tailings.
Rome, December 2014Slide 1 CO 2 transport infrastructure in Germany– Necessity and boundary conditions up to 2050 Study by DNV GL.
San Joaquin River Bedload Sampling summary January 4 and 5, 2011 April 1 and 2, 2011 Ledger Island.
King River Tasmania Copper Tailings Remediation. Background Macquarie Harbour is Largest Estuarine System in Tasmania 1893 – million tonnes of.
Surface Water Treatment Plant
W.L. Oliveira‐Filho, UFOP D.R. Silva, SAMARCO F.E. Almeida, SAMARCO
Strictly Private & Confidential 1 Tunis, 21 October 2009 Nur Energie Solar Development in the Mediterranean Basin.
Areva Resources Canada Inc. Midwest Project Presentation to Engineering consulting firms Vincent Lanièce, Director of Project Development September 2006.
Implementing Strategies to Improve Mill Capacity, with Case Studies. Presented by Nic Barkhuysen From Recent Advances in Mineral Processing Plant Design;
Joint Task Force on Emission Inventory & Projection / Task Force on Modeling and Measurement Workshop Wood Burning and other uncertain PM sources: activity.
Geological Issues at the OK Tedi Mine Keith McGregor Sophie Price.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Dry Stacking of Cycloned Tailings
29 August 2013 AMD Debate Technical solutions and funding models for the Acid Mine Drainage problems of South Africa.
PREPARED BY: MD.ALAM (492/08). The separation of solids from fluids (dewatering) is one of the important subjects in the field of mineral dressing  Water.
Presented by Mike Gowan Principal
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
Energy Storage Systems Prof. G. Bothun Dept. of Physics University of Oregon.
Metago Environmental Engineers PREDICTION OF THE BEACH PROFILE OF HIGH DENSITY THICKENED TAILINGS FROM RHEOLOGICAL AND SMALL SCALE TRIAL DEPOSITION DATA.
TRP Chapter Chapter 4.2 Waste minimisation.
Storage and disposal of mercury and mercury waste in Asia - Conclusions Sven Hagemann GRS.
Applications for CBX Sludge Blanket Meter Savings and optimization of the process.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Buckhorn Disinfection Byproducts / Backwash Disposal Project Board of Directors Meeting June 14, 2012.
SPWSTAC 2006 From POU to Centralized Arsenic Treatment: A Small Water System Case Study 2006 NGWA Naturally Occurring Contaminants Conference J. Mitchell.
Logo L u c k y P e n n y The presentation will begin shortly…
` Soluble Metal Recovery Improvement Using High Density Thickeners in a CCD Circuit Ruashi II a Case Study February 2009 M. Mulligan (Presenter) L. Bradford.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
Tailings and Waste Rock Management Alternatives Study
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
FOOD ENGINEERING DESIGN AND ECONOMICS
TERRAMIN AUSTRALIA Limited
P. Simms, S. Sivathayalan, F. Daliri Carleton University Desiccation in dewatering and strength development of high density hard rock tailings.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
PRESENTER:Julia Brown Waste Research Management & Training Centre Scientific Research Council CLEANER PRODUCTION TECHNOLOGIES.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
1.  Residual Solids Management Plan – RSMP (2014)  Pilot-Scale Screw Press Evaluation  Residual Disposal Options  Recommendations 2.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Sloping Tube Coal Separator – KNS Innovative solutions in coal preparation 2009.
Practical Treatment of Produced and Flow-back Waters for Re-use or Surface Discharge Eric Ringler, Bill Chatterton (SR) Joon H. Min, Allen Chan (BKT Co.
PROPOSED BHJ/BHQ BENEFICIATION PLANT AT DONIMALAI- AT A GlANCE PROPOSED BHJ/BHQ BENEFICIATION PLANT AT DONIMALAI- AT A GlANCE  The per capita consumption.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
Transfer of Environmentally Sound Technology to Reduce Transboundary Pollution in the Danube River Basin A UNIDO initiative in the Danube River Basin Implemented.
Engineered systems for wastewater treatment and disposal.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Overview of Desalination Trends and Jaffna Project
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Innovations and Demonstration of Novel Mine Water Treatment Technologies Dr Jo Burgess Research Manager: Mine Water Treatment and Management Water Research.
Hydrotransport 15 Conference
GREENHILLS PORTUGAL LDA
Paste vs Dry Stacking Breakout work shop Presented by: Jerold Johnson
Hydrotransport 15 Conference,
Troubleshooting a 556m Long Sand Slurry Pipeline
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Preliminary Design of 200mm and 300mm NB Distribution Pipelines for Phosphate Slurry at the Jorf Lasfar Terminal Facilities in Morocco Dr Nigel Heywood,
Hydrotransport 17 Effect of comminuted flint on pumping chalk slurry in the 92 km Kensworth – Rugby pipeline N.J. Alderman1 N.I.Heywood1 and D. J. Clowes2.
Electrocoagulation Treatment of Heavy Metals from Mine Impacted Water
RELIABLE, & AFFORDABLE ENERGY SOLUTIONS
Sanitation Study and Wastewater Network System AL Tayba Village
Presentation transcript:

David Romo Paterson & Cooke, Chile Ray Martinson Paterson & Cooke, Chile New Projects: Conventional or High Density Tailings?

Every new mining project has to define the most important aspects for the business: Mineral resources model Mine explotation design Methallurgicall process The challenges of new mining projects After that, the main consumptions of the process have to be evaluated: Water consumption Energy consumption At the end, the projects have to define what to do with the waste of the process: Sterile material Tailings 2

In this case Paterson & Cooke office in Santiago was in charge of the definition of tailings management system of the project. Aim of the study The aim of this presentation is to show the issues we had to face and what we did to deal with them, in order to support the definitions of the Client. “What we have to do is to look at the whole picture of the problem” 3

1.Project overview 2.Tailings deposit location 3.Bench scale tests 4.Conceptual trade off: conventional or thickened tailings? 5.Semi pilot test work 6.Reviewing the solution 7.Conclusion Content 4

The study adresses a new project of Sociedad Punta del Cobre, the greatest medium copper mining company in Chile. It is a gold-copper mine located at the IV region of Chile, around 300 km north of Santiago It is located in a desert area, the annual rainfall is less than 200 mm. The project considers a plant to process over 15,000 tpd The tailings deposit considers a capacity over 100 million tonnes 1. Project Overview 5

Paterson & Cooke led a consulting team to design the tailings system for the project 1. Project overview TRANSITION ENGINEERING PREFEASIBILITY STUDY CONSTRUCTION FEASIBILITY STUDY PROFILE STUDY COMMISIONING DEPOSIT LOCATION PRELIMINARY ARRANGEMENT BENCH SCALE TESTS CONCEPTUAL TRADE OFF SEMI PILOT TESTS UPDATE THE SOLUTION PATERSON & COOKE LED THE TAILINGS CONSULTING TEAM PUMPING TAILINGS SYSTEM DESIGN SUB-CONTRATOR OF AMEC CHILE 6

Based on satellite survey, 11 potential sites were identified closer than 30 km to the plant. The storage target was 150 million tonnes. A comparison was done considering: Conventional tailings pumping head Recovered water pumping head Dam wall volume Existing human activity Three alternatives were selected to complete the trade off comparison 2. Tailings Deposit Location 7

The evaluation of each alternative considered: Storage capacity of 80 million tonnes Processing plant of 17,000 tpd Conventional tailings with 55%cw Sand wall from cycloned tailings The results were the following: 2. Tailings Deposit Location Alternative 2 Alternative 4 Alternative 5 PLANT LOCATION ParameterUnitAlternative 2Alternative 4Alternative 5 Starting wall volumeMm³ Final wall volumeMm³ Final wall heightm Slurries and water pipeline lengthm Total installed powerkW1,2496,6697,759 Plant make-up waterm³/t Due to lower Capex and Opex, lower installed power, best plant make- up water and lower environmental impact, Alternative 2 was selected. 8

In order to get slurry design parameters, bench scale tests were done on samples of each UGM and on a composite. The samples were got from metallurgical bench scale tests. The average p80 was 148 μm, 61% less than 75 μm and Sg of 3.03 Sedimentation tests were done by Delkor: Magnafloc 338 was the best floculant, floc dose between 6-12 g/t and dilution of 13%cw Depending on the sample, a paste thickener could produce tailings between 68.5% %cw, being the expected average equals to 71.5%cw. 3. Bench Scale Tailings Tests 9

A range of rheology was measured in rotational viscometer. The unsheared yield stress, for the expected operational thickening points, was determined between 15 and 40 Pa, which is considered a low rheology. The rheology reduction was measured at 30%, so the expected fully sheared yield stress was between 10 – 28 Pa. At the average thickening point the expected fully sheared yield stress was 19 Pa. 3. Bench Scale Tailings Tests 10

In order to estimate the beach slope at the deposit, a flume test was done on the composite sample. The limitations of flume tests for predicting beach slopes are well known, so the measured values were reduced by considering two reduction factors: evaluating the average slope in the middle of the flume and also considering a reduction of 30%. 3. Bench Scale Tailings Tests With those considerations, at the average fully sheared yield stress of 19 to 20 Pa at the deposit, a beach slope of 1.5% was estimated for the purpose of pre- feasibility engineering 11

The main aspects to figure out in the project in terms of the prefeasibility study were as follows: Deposit location Tailings management system Dam wall and storm water system design The dam wall and storm water system design were undertaken by Knight Piesold Chile. Two different options for tailings management system were evaluated: Conventional tailings option: low density tailings, cyclons operation, slimes transport, tailings sand wall and tailings discharge at the deposit from the wall. Thickened tailings option: high density tailings, wall constructed with borrowed material and tailings discharge at the end of the deposit. 4. Conceptual Trade off: Conventional or Thickened Tailings? 12

4. Conceptual Trade off: Parameter Conventional tailings systemThickened tailings system Solids concentration64% CW 70% CW Thickener(1) × Ø48 m high rate thickener, yield stress < 15 pa (1) × Ø48 m paste thickener, yield stress < 80 Pa Tailings transport Gravitational flow through 4,300 m HDPE pipeline Gravitational flow through 700 m HDPE pipeline Tailings classification cyclones No cyclones or pumping slurries systems were considered Sand transport slurry pumps TDH 20 m Slimes transport Gravitational flow through 1,475 m steel pipeline Recovered water transport barge pumps and water pumps TDH 230 m Starting dam wall 1.8 Mm³1.0 Mm³ Final dam wall 12.5 Mm³6.5 Mm³ Beach slope 0.3%1.5% Plant make-up water 0.46 m³/t0.40 m³/t Installed power 3,100 kW1,700 kW 13

4. Conceptual Trade off The thickened tailings system was selected because of: Lower capex Lower installed power Lower plant make up water Lower volume of water within the deposit Greater opportunities to improve the using of the deposit facilities Wall Thickener Plant Location Tailings discharge 14

Semi pilot tailings tests were done in order to improve the knowledge of tailings on a larger scale. The p80 was 218 μm μm Fine fraction less than 75 μm was 56%-60% Slurry behaviour tests were done by P&C Johannesburg: Natural pH 7.8 Slurry conductivity over 40 mS/cm (sea water) Slurry naturally settling 5. Semi Pilot Tailings Tests 15

Semi pilot thickening tests were done by Outotec in a Ø190mm x 4 m thickener: Magnafloc 338 was the one of the best floculants, floc dose grew up to 17 g/t and dilution was 12%cw Optimum flux rate was 0.4 t/m².h Expected U/F solids concentration 65%-73%cw Unsheared yield stress between Pa Two options were proposed: One 55Øm high compression thickener Two 38Øm high compression/paste thickeners 5. Semi Pilot Tailings Tests 16

A range of rheology was measured in rotational and tube viscometer. A great difference between the rheology of both samples was measured. Even the rheology was 6 times greater than the measured one at the PFS study. A rheology reduction of 60% was measured on these samples 5. Semi Pilot Tailings Tests 17

4 m flume tests were done to estimate the beach slope. The experience and test data analysis were done with the support of Professor Andy Fourie. Both samples showed different behaviour, due to the different lithology. The beach slope estimation considered a safety factor of 50% over the measured slope. At the average solids content for the thickener operation of 70% CW, the average beach slope was estimated on 1.6% 5. Semi Pilot Tailings Tests 18

6.1 Tailings Pumping Because of the higher rheologies measured at semi pilot test work, pump stations are required for tailings transportation from thickener(s) to the deposit. Depending on the option of thickening circuit the pumping system is as follows: 6. Reviewing the Solution Pump station(1) × Ø55 m thickener (2) × Ø38 m thickener Underflow discharge (1 + 1) 20 m/15 m 250 kW centrifugal pumps 2 × (1 + 1) 20 m /15 m 200 kW centrifugal pumps Transport to deposit(1 + 1) 25 m/20 m 200 kW centrifugal pumps 19

6.2 Filtered tailings Bench top filtering tests were done by Delkor, but the filtration rates were very poor for vacuum and pressure technologies. In spite of those results, an evaluation of filtered tailings system was done. The area of the deposit is not suitable to dispose tailings in stock piles. This is because of the maximum expected value for the hydrographic basin storm flow which reaches 211 m³/s. As a result, a water dam as well as an evacuation tunnel had to be considered in this evaluation. Finally the filtered tailings option resulted into a Capex over 2.4 times the thickened tailings option. 6. Reviewing the solution 20

The study developed for this new project of Sociedad Punta del Cobre ended into the following conclusions: The site conditions are the most important aspects that define which type of dewatering system is the best. The topography and the hydrographic basin storm determine the design of the deposit and the tailings management system. The other very important aspect are the pumping distances. If the material presents good conditions to be thickened or filtrated, a complete test plan must be done to support every engineering evaluation. Bench scale or pilot tests are recommended to be done for each stage of engineering. In this case, thickened tailings clearly has technical advantages over conventional and filtered tailings systems. The expected plant make-up water is 0.4 m³/t and the installed power is 2,700 kW For feasibility engineering, the final selection of the thickening circuit and the study of disposal strategies will be important issues to address. 7. Conclusion 21

We want to acknowledge to all people who worked with us, from Knight Piesold Chile, Multical, Delkor, Outotec, Mr. Andy Fourie and to Pucobre S.A. Acknowledgements 22