Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
LAT-PR Section 22-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Dec. 18, 2003 LAT-PR-02590: Grid Manufacturing Readiness Review 1.Introduction Marc Campell.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
LAT Design Integration1 GLAST LAT ProjectDecember 2003 LAT Planning Meeting December 10, 2003 Design Integration LAT Planning Meeting December 10, 2003.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
B. Donakowski UCB/SSLFIELDS iCDR – MEP Mechanical 1 SPP FIELDS MEP Main Electronics Package Mechanical Packaging Bill Donakowski
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
GLAST Large Area Telescope:
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Main Electronics Package
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
BSS Prep work at CERN and Acceptance of Parts
Bill Donakowski Mechanical Engineer UCB/SSL
GLAST Large Area Telescope:
Open Issues Modification of Cactus Arm bending tool required
GLAST Large Area Telescope
1. Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical/Thermal Systems
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

Mech Systems Proposed EMI Modifications Marc Campell 9/2/03

Mechanical Systems EMI Impacts2 EMI Skirt on Grid

Mechanical Systems EMI Impacts3 Finding 3 - E-Nickel on Grid Issue: Electroless nickel on Grid at CAL (and TRK, ACD & Radiator) interfaces is “better” than alodine on Aluminum Implementation plan is the concern –Sequence of Grid plating, insert installation and higher level drilling operations; –Grid requires high emissivity outer walls and –Masked areas for bonding operations –Grid has holes so masking/plugging holes is non-trivial

Mechanical Systems EMI Impacts4 CAL – Grid Interface

Mechanical Systems EMI Impacts5 Finding 3 - E-Nickel on Grid (cont) Impacts –Grid Mfg plan –Grid drawing note callout and masking details on drawing Schedule –4 x 4 Grid Mfg plan due by early Sept –4 x 4 Drawing due mid-Sept –Drop dead decision date mid Oct (with impacts)

Mechanical Systems EMI Impacts6 Findings 5 & 6 – EMI Shield Butt Joints Issue: Butt joints may leak 2 types of butt joints - edge on and flange as shown –EMI skirt to X-LAT plate –EMI skirt to Grid –EMI skirt to EMI skirt –EMI skirt to connector patch panel Possible improvements –Tongue & groove joint –EMI gasket in groove –Conductive bond between components

Mechanical Systems EMI Impacts7 EMI Skirt Joints

Mechanical Systems EMI Impacts8 EMI Skirt Joints 2

Mechanical Systems EMI Impacts9 5 & 6 – EMI Shield Butt Joints (cont) Tongue and groove or gasket –Looks difficult to implement on grid especially near S/C interface & other Grid shear bosses –Plausible for some skirt to skirt joints and some areas of the X-LAT plate to EMI skirt away from heat pipe exits Radiator Mount Bracket & Heat Pipe Patch panels could be conductively bonded to each other & the Grid (no planned removals after Grid Assy)

Mechanical Systems EMI Impacts10 5 & 6 – EMI Shield Butt Joints (cont) Impacts –6 (x 2) skirt drawings (90 Mhrs) –Grid drawing including possible redesign (& analysis?) of shear bosses ( Mhrs) –X-LAT plate is awaiting final definition Schedule –EMI skirt drawings needed late Sept –Being analyzed now Consider EMI test of EMI skirt box to isolate specific problem areas & to define magnitude of problem

Mechanical Systems EMI Impacts11 Finding 7 – 3 Piece X-Lat Plate 3 vs 1 piece X-LAT trade is currently under study Issues –Alignment of X-LAT fasteners to E-box inserts for direct bolting of X-LAT plates –LM tooling impacts & VCHP alignment –Tolerance of butt joint is an issue at EMI skirts –LM cost & producibility Schedule –X-LAT design finalized mid-late Sept

Mechanical Systems EMI Impacts12 3 X-LAT Plates

Mechanical Systems EMI Impacts13 X-LAT Butt Joint

Mechanical Systems EMI Impacts14 Finding 9 – Venting of EMI Box 2 choices –1) Vent through X-side EMI skirt(2-4 in 2 req’d) –2) Vent through CAL baseplate crenulations, past TRK’s and out between ACD to Grid gap 1) is straight forward, but effective 550 kHz filtered vent must be designed (commercial filters for 10’s MHz to GHz) 2) is convoluted path past TRK & CAL cables –If analysis is not robust, a test may be required

Mechanical Systems EMI Impacts15 Finding 9 – Venting of EMI Box (cont) Impacts –2 EMI skirt drawings (20 Mhr) –Design, develop & test a filter/vent (120 Mhr) Schedule –EMI skirt drawings late Sept

Mechanical Systems EMI Impacts16 Finding 11a – Radiator Level EMI Test Issue – S/C regulated power and LAT heater control box will send noise down to strip heaters mounted on Radiator which may emit noise LM can be directed to do best practices for EMI shielding of TCS components LM can’t do this test without S/C regulated power & LAT heater control boxes Finding a problem at the LAT level test is too late Needs to be worked at SLAC upfront

Mechanical Systems EMI Impacts17 Finding 11a – Radiator Level EMI Test (cont) Impact –LM did not cost this test in their Phase II proposal –Cost & schedule impacts to Radiator delivery Schedule –Radiator is on a day for day slip until spec gets released including resolving this issue

Mechanical Systems EMI Impacts18 Finding 11b – LAT Level Radiator EMI Test Radiators should be installed for LAT level EMI test –Agree I&T needs to access impacts to current flow –S/C regulated power needs to be available Systems Engr. needs to revise LAT Test Plan

Mechanical Systems EMI Impacts19 Finding 12 – Radiator – Grid Interface Current design has G-10 spacer between Radiator and its mounting brackets to limit heat leak into Radiator (in survival mode) to less than 5 watts This electrically isolates the 2 parts 2 options –Ti spacers with reduced area &/or increased thickness –G-10 spacers wrapped in thin foil

Mechanical Systems EMI Impacts20 Radiator Mount Brackets

Mechanical Systems EMI Impacts21 Finding 12 – Radiator – Grid Interface (cont) Impacts –LM needs to analyze these options for thermal & structural performance Schedule –LM waiting to fab

Mechanical Systems EMI Impacts22 Back ups

Mechanical Systems EMI Impacts23 EMI Box +Z up

Mechanical Systems EMI Impacts24 EMI Box –Z up

Mechanical Systems EMI Impacts25 X-LAT Joint