WESLEYAN P BID PACKAGE #19

Slides:



Advertisements
Similar presentations
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P-31-1 DATE: FOSS 9 & 10 – DOOR REPLACEMENT.
Advertisements

NOTE: REFERENCE PROJECT MANUAL DATED 1/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Architectural CAD I – IM230
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
WESLEYAN P C CAPITAL FY 15 OLIN LIBRARY
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Repair roof rafters / joists, soffit and fascia boards in this area.
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE
WESLEYAN P-22-1 MAJOR MAINTENANCE FY 16 23A VINE STREET
WESLEYAN P-FAFS-1 MAJOR MAINTENANCE FY WASHINGTON STREET
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

WESLEYAN P-105-1 BID PACKAGE #19 REMOVAL NOTES SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL WORK NOTED. REMOVE AND DISPOSE OF EXISTING WOOD RAILINGS. REMOVE AND DISPOSE OF EXISTING METAL RAILINGS. REMOVE AND DISPOSE OF TONGUE & GROOVE DECKING. REMOVE AND DISPOSE OF LATTICE AND FASCIA BOARDS. REMOVE AND DISPOSE OF STAIR TREADS, RISERS, STRINGERS AND STAIR FRAMING. REMOVE AND DISPOSE OF COLUMN BASES (TOTAL OF 6 - SEE PHOTO BELOW FOR CLARIFICATION). REMOVE AND DISPOSE OF EXISTING METAL POSTS AND FOOTINGS CURRENTLY SUPPORTING PORCH. REMOVE AND DISPOSE OF EXISTING PORCH FRAMING DISCONNECT EXISTING WATER SPOUT AT THE EAST SIDE AND SALVAGE FOR REINSTALLATION AT THE SOUTH SIDE. NEW PORCH INSTALLATION NOTES CONTRACTOR SHALL INCLUDE THE COST TO INSTALL (6) SIX NEW – 8” DIAMETER CONCRETE FOOTINGS. PROVIDE NEW PRESSURE TREATED SUPPORT POSTS AS REQUIRED. INSTALL NEW 2X10 PRESSURE TREATED FRAMING. REPLICATE EXISTING PORCH FOOTPRINT. NEW FRAMING SHALL BE INSTALLED SO THAT THE NEW DECKING AND COLUMN BASES MATCH THE EXISTING ELEVATION. INSTALL NEW COLUMN BASES TO MATCH EXISTING. (REFERENCE PHOTO ‘A’ FOR REPLACEMENT SECTION CLARIFICATION). MAINTAIN EXISTING COLUMNS. REPAIR AND PATCH ALL COLUMNS WITH EPOXY CONSOLIDANT AS REQUIRED. INSTALL 1” ROUND MINI COLUMN VENTS, THREE (3) AT COLUMN BOTTOM AND TWO (2) AT COLUMN TOP – TYPICAL FOR ALL FULL COLUMNS. VENTS BY MC MASTER CARR – ITEM #2016K11, WHITE PAINTED ALUMINUM. DRILL/CORE COLUMN AS REQUIRED FOR INSTALLATION. INSTALL NEW COMPOSITE PORCH AND STAIR RAILING SYSTEM. RAILING SYSTEM SHALL BE ‘LEGENDS VINYL BALUSTRADE’ BY FAIRWAY VINYL SYSTEMS http://www.fairwayvinyl.com/sv_legends.html RAILINGS SHALL BE 36” HIGH – BALUSTERS SHALL BE 32” TURNED ‘LEGENDS’ BY FAIRWAY VINYL SYSTEMS. INSTALL NEW COMPOSITE STAIR SYSTEM. PROVIDE NEW PRESSURE TREATED FRAMING FOR STAIRS. INSTALL NEW AZEK TONGUE & GROOVE DECKING AND TREADS. INSTALL NEW COMPOSITE SQUARE PRIVACY LATTICE AND COMPOSITE FASCIA BOARDS. RE-INSTALL / RE-LOCATE EXISTING WATER SPOUT TO THE SOUTH SIDE OF THE PORCH. PROVIDE ALL REQUIRED PLUMBING WORK. PREP, PRIME AND PAINT ALL PREVIOUSLY PAINTED SURFACES INCLUDING ALL COLUMNS, SOFFITS, BOX BEAMS ALONG THE CEILING, DENTIL MOLDINGS AND BEADBOARD CEILING. DO NOT PAINT ANY COMPOSITE MATERIALS INSTALLED. LOAM, SEED AND REGRADE DISTURBED AREA AROUND PORCH UPON COMPLETION OF THE PROJECT. SCOPE OF WORK IS LIMITED TO THE FRONT & REAR PORCHES NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 14 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-1

WESLEYAN P-105-2 PHOTO ‘A’ MAJOR MAINTENANCE FY 14 BID PACKAGE #19 MAINTAIN EXISTING COLUMN – REPAIR ALL COLUMNS WITH EPOXY CONSOLIDANT AS REQUIRED. REPLACE EXISTING COLUMN BASES – TYPICAL OF 6. REPLICATE EXISTING SHAPES AND PROFILES. PHOTO ‘A’ MAJOR MAINTENANCE FY 14 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-2

WESLEYAN P-105-3 MAJOR MAINTENANCE FY 14 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-3

WESLEYAN P-105-4 MAJOR MAINTENANCE FY 14 BID PACKAGE #19 REPLACE EXISTING COLUMN BASES – TYPICAL OF 6. REPLICATE EXISTING SHAPES AND PROFILES. MAJOR MAINTENANCE FY 14 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-4

WESLEYAN P-105-5 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-5

WESLEYAN P-105-6 BID PACKAGE #19 SCOPE OF WORK IS LIMITED TO THE FRONT & REAR PORCHES BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-6

WESLEYAN P-105-7 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-7

WESLEYAN P-105-8 BID PACKAGE #19 REMOVAL NOTES SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL WORK NOTED – MAINTAIN PORCH ROOF. REMOVE AND DISPOSE OF EXISTING SUPPORT POSTS REMOVE AND DISPOSE OF EXISTING WOOD RAILINGS. REMOVE AND DISPOSE OF TONGUE & GROOVE DECKING. REMOVE AND DISPOSE OF LATTICE AND FASCIA BOARDS. REMOVE AND DISPOSE OF EXISTING FRAMING REMOVE AND DISPOSE OF STAIR TREADS, RISERS, STRINGERS AND STAIR FRAMING. REMOVE AND DISPOSE OF EXISTING POSTS AND FOOTINGS CURRENTLY SUPPORTING PORCH. SAWCUT & REMOVE SECTION OF ASPHALT PAVING TO THE EDGE OF THE EXISTING DRIVEWAY. REMOVE AND DISPOSE OF EXISTING T-111 PERIMETER SKIRT REMOVE ALL PORCH COMPONENTS AS NOTED. REMOVE AND DISPOSE OF EXISTING T-111 PERIMETER SKIRT 8 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-8

WESLEYAN P-105-9 BID PACKAGE #19 NEW PORCH INSTALLATION NOTES SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL WORK NOTED. THE CONTRACTOR SHALL MAINTAIN THE EXISTING ROOF AND PROVIDE A NEW CONCRETE LANDING AND STAIRS AT THE SOUTH SIDE. NO STAIRS SHALL BE INSTALLED AT THE NORTH SIDE. CONTRACTOR SHALL INCLUDE THE COST TO INSTALL (5) NEW – 8” DIAMETER CONCRETE FOOTINGS AND A CONCRETE LANDING TO MATCH THE WIDTH OF THE STAIRS AND EXTEND TO THE EDGE OF THE ASPHALT DRIVEWAY. COORDINATE FOOTING LOCATIONS WITH OWNER. CONTRACTOR SHALL INSTALL NEW 4”X4” COMPOSITE STRUCTURAL POSTS TO REPLACE THE POSTS REMOVED. POSTS SHALL BE BY FAIRWAY VINYL SYSTEMS. CONTRACTOR SHALL INSTALL NEW COMPOSITE PORCH AND STAIR RAILING SYSTEM. RAILING SYSTEM SHALL BE ‘LANDMARK’ BY FAIRWAY VINYL SYSTEMS. BALUSTERS SHALL BE SQUARE. http://www.fairwayvinyl.com/lm_vinyl_rail.html RAILINGS SHALL BE 36” HIGH. INSTALL NEW COMPOSITE STAIR SYSTEM. PROVIDE NEW PRESSURE TREATED FRAMING FOR STAIRS. PROVIDE COMPOSITE RISER FASCIA BOARDS. INSTALL NEW TREX DECKING AND TREADS – COLOR SHALL BE GREY. INSTALL NEW COMPOSITE SQUARE PRIVACY LATTICE AND COMPOSITE FASCIA BOARDS. INSTALL NEW T-111 SKIRT BOARDS AROUND THE PERIMETR OF THE PORCH TO REPLACE THE EXISTING T-111. PROVIDE PRESSURE TREATED SUPPORT FRAMING AS REQUIRED. INSTALL HINGED ACCESS DOOR WITH LATCH. PREP, PRIME AND PAINT ALL PREVIOUSLY PAINTED PORCH AREAS INCLUDING ALL SOFFITS, BOX BEAMS ALONG THE CEILING, EXPOSED PORCH ROOF JOISTS, NEW T-111 SKIRT BOARDS AND THE PORCH CEILING IN ITS ENTIRETY. DO NOT PAINT ANY COMPOSITE MATERIALS INSTALLED. LOAM, SEED AND REGRADE DISTURBED AREA AROUND PORCH UPON COMPLETION OF THE PROJECT. INSTALL NEW T-111 SKIRT BOARDS AROUND THE PERIMETR OF THE PORCH TO REPLACE THE EXISTING T-111. PROVIDE PRESSURE TREATED SUPPORT FRAMING AS REQUIRED. INSTALL HINGED ACCESS DOOR WITH LATCH. THIS GRAPHIC REPRESENTATION IS FOR INFORMATION ONLY AND IS BEING PROVIDED TO SHOW THE LAYOUT INTENT OF THE NEW PORCH LANDING AND STAIRS – REFER TO INSTALLATION NOTES FOR SPECIFICATIONS AND PORCH REQUIREMENTS. 9 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 06/11/13 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 P-105-9