Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Liquid Hydrogen Absorber
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Walls crates cables gas chambers electronics CERN adb.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Richard KeelerDepartment Review, April Particle Physics Group Faculty and Researchers Research directions –Overview –OPAL, ATLAS, BaBar Infrastructure.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
October 16th 2000 NSERC Site Visit M. Lefebvre1 ATLAS at the University of Victoria M. Lefebvre NSERC Site Visit October 16th 2000 The ATLAS Experiment.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Dec
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Installation of the T600 at Fermilab Fermilab, February 15,
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
ELENA installation progress F. Butin / ELENA collaboration.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Production at Victoria University of Victoria
Teleconference ACS – FREIA 31st October 2017
Far Detector Activities Late 2017 – Early 2018
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
ATLAS Canada Collaboration
Pierluigi Paolucci - I.N.F.N. Naples
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
Limited Streamer Tube Project Summary
as a prototype for Super c-tau factory
SNS PPU Cryomodule Vacuum Vessel
Teleconference ACS – FREIA 19th June 2017
ATLAS Liquid Argon Calorimeter Signal Feedthroughs
ICARUS Internal Cryogenic Sensors
Presentation transcript:

Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University of Victoria British Columbia, Canada ATLAS LAr Week 26 Jan 98

26 Jan 1998 LAr WeekM. Lefebvre Pin Carrier Order and Plans for Prototypes Pin carrier order placed second week of January Delivery weeks. Total Order: Glasseal 20 pin carriers BNL 20 pin carriers Victoria Pacific Coast Technology 10 pin carriers BNL 10 pin carriers Victoria BNL and Victoria plan to produce 2 feedthrough units each

26 Jan 1998 LAr WeekM. Lefebvre Pin Carrier Design

26 Jan 1998 LAr WeekM. Lefebvre Leak Test Setup in Victoria Leak detection using He leak detector supported by an RGA Leak detector services warm and cold test stations Cooling by cryo-cooler or LN 2 Parts ordered and received: He leak detector operational Warm side assembled; starting vacuum tests

26 Jan 1998 LAr WeekM. Lefebvre Assembly Jig in Victoria Rotation about horizontal and vertical axis possible Various assembly scenarios under study Parts ordered

26 Jan 1998 LAr WeekM. Lefebvre Endcap Integration Issues Feedthrough assembly skirt following radial space increase, the skirt will not cover all the bellows anymore. Extend skirt? Bi-metallic junction and hence diameter of funnel same as for barrel? Details of the bolt flange region to be verified. Same as for barrel module 0 cryostat? Final length of bellows under discussion Visit to the bellows company scheduled for 12th Feb 1998

26 Jan 1998 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Canadian Responsibilities Design Fabrication Pigtails purchased from Orsay Commissioning Transport Assistance during installation: Assistance during welding on the cryostat Assistance for leak testing during installation DC Electrical tests during the installation Grey areas which require more discussion: Heater power distribution Flange temperature monitoring Connection to vacuum manifolds

26 Jan 1998 LAr WeekM. Lefebvre Endcap Signal Feedthrough Team Paul Birney Senior Technician, TRIUMF Leak test station Assembly tooling Margret Fincke Research Associate, Victoria Electric test station Vacuum cable development Terry Hodges Chief Engineer, TRIUMF Feedthrough unit design Finite element analysis Alisa Humphrey Junior Technician, Victoria Temperature Cycling Unit Richard Keeler Faculty, Victoria Test stations Vacuum cable development Roy Langstaff Senior Draftsman, TRIUMF Feedthrough unit design Procurement issues Michel Lefebvre Faculty, Victoria Project leader Mark Lenckowski Draftsman, TRIUMF Ernie Neuheimer Research Scientist, CRPP Carleton Vacuum cable development On a consultant basis: Paul Poffenberger Research Associate, Victoria Leak test station Vacuum system Randy Sobie Faculty, Victoria DAQ

26 Jan 1998 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Top PBS Levels 4.nfor ATLAS Canada corresponds to n in the TDR

26 Jan 1998 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Series Assemblies Details

26 Jan 1998 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Project Setup Details

26 Jan 1998 LAr WeekM. Lefebvre Signal Feedthrough Notes Editors are being assigned for the following notes: ATLAS LAr Calorimeter Signal Feedthrough: Design Assembly Vacuum Cables Pigtail Cables Pin Carriers Testing Installation QA and QC

Endcap Signal Feedthrough Low Voltage Vacuum Cables Current and Temperature Issues Terry Hodges TRIUMF and University of Victoria British Columbia, Canada ATLAS LAr Week 26 Jan 98

26 Jan 1998 LAr WeekM. Lefebvre Vacuum Cable Development in Canada Signal Cables All-Flex design: rigid part of the connector is no longer an integral part of the microstrip cable Aim at simpler and cheaper design Design work: E. Neuheimer (CRPP Carleton) G. Hoeppel (Strataflex, Toronto) We visited Strataflex 24 Nov 97 Order of prototype signal strip lines placed in Dec 97 Two connector designs will be tried: wire mesh (BNL/CRPP design) plated plastic (Strataflex proposition) Expect first complete cable prototypes mid February 98

26 Jan 1998 LAr WeekM. Lefebvre Vacuum Cable Development in Canada HEC Low Voltage Cables HEC requires special vacuum cables for the low voltage Our current understanding: one HEC feedthrough unit per quadrant 8 modules per quadrant 5 motherboards per module 6 lines (3 LV and their returns) per mother boards Total of 240 lines per quadrant for a total of 15 different current supplies 6 X 64 = 384 pins are reserved per feedthrough unit Our baseline design uses 70  m ground and signal traces Propose a scenario where the striplines would always operate below 330K, even if one of the parallel traces for any of the heavier current supplies was broken: Instead of 16 x (15 x 1) = 240 Propose 16 x ( 11 x x x 3) = 352