2014 WEA Conference Seismic Design of Wine Tanks.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Cofferdam.
Lesson 9 Design & Construction of Food Premises & Equipment
South Old Bridge Vol. Fire Co. Standard Operation Procedures for Hazardous Material Incidents.
METHODS OF RETROFITTING
Above Ground Storage Tanks &
Subpart R Steel Erection
Seismic Code Highlights Determining what level of Seismic Restraints are Required Arkansas Fire Prevention Code 2002 Based on the IBC 2000.
RECOGNIZING TREE HAZARDS. Introduction  Trees are an important part of our world. However, trees may be dangerous. Trees or parts of trees may fall and.
1 Risk Management Services State of Georgia Risk Management Services Trenching Safety Training Department of Administrative Services Loss Control Services.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
OSHA Office of Training and Education1 Excavations – Subpart P.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
This Briefing is: UNCLASSIFIED Headquarters Air Combat Command Carl M Drechsel, NE HQ ACC/A7OI 19 NOV Years of “What Were You Thinking?”
Foundations and Footings
SOUTH ASIA LAUNCH OF GLOBAL CAMPAIGN MAKING CITIES RESILIENT MY CITY IS GETTING READY New Delhi June 8-9, 2010.
What is safe building? Life of a reinforced building lasts 50 to 100 years or longer; Safe building means it will not collapse during span of life; A.
Earthquake Hazards and Safety Ch Objective  Describe how earthquakes cause damage and the kinds of damage they cause.  Explain what can be done.
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
During the semester Introductions Basics of earthquakes History and Recording Damaging Earthquakes and Understanding seismic exposure Undertaking loss.
What have we accomplished? STRENGTH OF MATERIALS
Chapter 19 Floors.
Safety for Working in High Places
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Trenching and Shoring 29 CFR A Trenching Tragedy False sense of security Knew they were out of compliance Thought the soil was stable Conditions.
Foundation Engineering CE 483
MAKE SURE YOUR OWN ACTIONS REDUCE RISKS TO HEALTH AND SAFETY.
MSDS = Material Safety Data Sheet
Chapter 2b Foundations Shallow & Deep Foundations.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Building Codes. Building codes: collapse prevention.
MNM Fatal Fall of Person Fall of Person February 27, 2014 (Iowa) February 27, 2014 (Iowa) Underground Limestone Mine Underground Limestone Mine.
And Society. Earthquakes & Society 7-3 Key concept : Studying seismic activity can help scientists forecast earthquakes and reduce the damage earthquakes.
STRUCTURES Outcome 3 Gary Plimer 2008 MUSSELBURGH GRAMMAR SCHOOL.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
 Explain how earthquake-hazard level is determined.  Compare methods of earthquake forecasting.  Describe five ways to safeguard buildings against.
Foundation Loads Dead Load Live Load Wind Load
1 7.3 Earthquakes and Society. 2 Have you experienced an earthquake? How did you feel? What did you do to protect yourself?
Sprinkler Loads on Trusses
OSHA Office of Training and Education
Excavation & Trench Safety
BUILDING CONSTRUCTION
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Structural Elements.
Why make a plan? Disasters change things. When an emergency happens you may have to decide what to do very quickly, while you are worrying about what.
Leads Institute of Technology & Engineering Subject Code : Name Of Subject :Building Construction Name of Unit : Soil Foundation Topic : Bearing.
AR362 - Structural Systems In Architecture IV Lecture : Foundations
Why House Bolting Needed?
Leads Institute of Technology & Engineering
Navigators Team Roseanne DeBellis Allison Esrig
Review of Indian Seismic Codes
Refrigeration Issues and Developments
Welcome to Earthquake Engineering
Regulation of non-structural elements in NZ
Building Planning and Drawing
by Dr. Syed Mohamed Ibrahim M.Tech., Ph.D.,
Objectives Upon completion of this module you should be able to:
PRINCIPLE PROPERTIES OF BUILDING MATERIALS
Wood Structures Topic 8 Quality Workmanship
Gas Utility Operations Best Practices Program
Earthquakes and Society
Non-Structural Safety
Graduation Project Bracing system for deep excavation.
Presentation transcript:

2014 WEA Conference Seismic Design of Wine Tanks

Introduction & Scope Current Design Codes, –What they are. –What they do and do not cover. –What all the figures mean. What Wine Tank Owners need to consider and specify when ordering a tank. Type of wine tank designs (pros and cons, limits) Review of some of the common failures and learning’s from Marlborough –Legs –Plinths – conventional –Cast in place Q & A Content

Introduction and Scope Cliff Ellery –NDA/Crown. General Manager and Senior Engineer. CPEng with 18 years experience in Tank fabrication for Wine, Dairy, Tare Treatment and Pharmaceutical industries. Design tanks 500m3 to 5 litre and over 100 tanks in the last year alone. Seismic design of wine tanks. (for the non Engineer) –Atmospheric storage vessels for non toxic, food grade products. –For this class of tank seismic strength and restraint is the governing design condition. Excludes –Pressure Vessels –HASNO vessels. –Water storage tanks for domestic and fire fighting purposes.

Common Questions, Why is there no code covering wine tanks design? Why did my tanks fail when they where designed to a code? The tanks come with a compliance statement so I don’t need to worry about anything else. I‘m not a Engineer so how can I be expected to specify what the seismic requirements are for my tanks. Should I bolt my tanks down? I heard it was best to let them move around?

Tank Design Codes. The NZ code structural codes ‘Earthquake Action” excludes tanks, but it also excluded bridges, dams retaining walls and off shore structures all of which are designed to withstand earthquakes. For Tanks we therefore use 2 codes for seismic design. –AS/NZS “Earthquake actions New Zealand” – For the size of earthquake. –NZ National Society for Earthquake Engineering (NZNSEE) “Seismic Design of Storage tanks: – for how important the tank is and how strong it needs to be to withstand the design earthquake.

Why did my tanks fail when they where designed to a code The goal of the codes is to 1.Save lives. (Prevent full or part structural collapse that would prevent evacuation of people). 2.Protect society. 3.Protect the Environment. 4.Protect Adjacent Property. –Risk of property on same site is at owners discretion.

Design State Tanks are designed to “U ltimate limit state”. Meaning some bending and distortion is ok but ultimate failure or collapse is not.

Some distortion is Acceptable Provided tank does not collapse or spill content or harm people. Diamond BucklingElephant foot Buckling

Not Acceptable Tank and walkway collapse poses a serious risk to wine staff personnel and is not code compliant.

What to Specify Tank Location –Using NZS – Hazard factor (size of earthquake) –Marlborough and Hawke’s Bay =0.4

What to Specify Soil Type –AS/NZ 1170:5 creates five classes – –Strong Rock [A] –Rock [B] –Shallow soil [C] –Deep or soft soil [D] (Default in Marlborough) –Very soft soil [E] Geotechnical site report, or council recommendation.

Design Life Design period which structure/tank intended purpose is without major structural repair. Less than 6 months 5 years 25 Years – can be applicable for some applications 50 Years – NZSEE recommendation. 100 Years or more

Importance Level, & 4 Building/structural code definitions difficult to apply to tanks. AS/NZS are Building Definitions (containing people) Importance Level 1 – structure presenting low risk – Farm Buildings. Importance Level 2 – Normal structures – single family dwellings. Importance Level 3 – structures containing crowds. (schools, airports etc) Importance Level 4 – Post disaster functions or hazardous materials, Hospitals.

Tank code – Risk based approach. Seismic Design of Storage tanks: Risk based approach. Risk of failure Importance Level 1 – Negligible or slight Importance Level 2 – Moderate Importance Level 3 – Serious Importance Level 4 – Extreme.

Tank Content Schedule 4 – Water, Milk, Wine Schedule 3 – Substances presenting low danger Schedule 2 - Substances presenting medium danger Schedule 1 - Substances presenting High danger

Risk to Life Schedule 4 (Wine), Number of people within 50m –Less than 10 – slight – Level 1 –Less than 100 – Moderate – Level 2 –More than 100 – Serious – Level 3

Risk to Environment Schedule 4 (Wine), –Low to High – Level 1

Risk to Community –Risk = Negligible to slight – Level 1

Risk to Adjacent Property Adjacent property within 50m –Less than $1 million - slight – Level 1 –Less than $10 million – Moderate – Level 2 –More than $100 million – serious - Level 3

Risk to your Property Your property –slight – Level 1 –Moderate – Level 2 –serious - Level 3 Your call. Your own business risk.

Client Design Specification Design Codes –AS/NZS “Earthquake actions New Zealand” –NZ National Society for Earthquake Engineering (NZNSEE) “Seismic Design of Storage tanks: Design Variables –Design Life 50 years. –Percentage Full = 100% –SG of Product = 1.05 –Soil Type D. –Location = Napier (Hazard Factor = 0.38) –Important Level 1 (2 if supporting working platforms) or ? to meet your business risk for that tank.

MARLBOROUGH 2013 EARTHQUAKES Lessons learnt Observations Improvements

Tanks on Leg Pro Easy to install. Easy to move. Cons Seismically weak. Requiring –Large number of legs – cross bracing. Difficult to effectively attached thin wall vessels to legs.

Tanks on Legs Legs weak, require cross bracing Legs tend to tier tank at point they attach to tank.

Bolt all tanks down. Especial tanks on legs Load from earthquake taken by downwards load on one legs and upwards load on opposite leg Not bolting legs down increases load on the one leg, leading to failure & risk to people.

Bolt tanks to foundations with i.a.w designer specifications

Plinth Mounted Tanks Wine Industry standard for large tanks. Suitable for tank of all sizes. Cons Cost of installation higher than leg design. Difficult to move tanks or remove old concrete plinths.

Plinth mounted tank Seismic Performance If skirts do not extend to the ground then tanks will bend at floor knuckle and settle in and earthquake. Gap

Tanks on Plinths If skirts do not extend to the ground then tanks will bend at floor knuckle and settle in and earthquake.

Plinth mounted tank Seismic Performance Extending the skirt to the ground eliminates this issue. Or retro fit chairs that extend to the ground. Skirt extends to Foundations

Extend skirts to ground Ensure base plates are correctly grouted across full width and circumference.

Or Cast in place Plinths Tank skirt is pumped full of concrete fully supporting floor and knuckle. This design worked well in the 2013 Earthquakes

Cast in Place Plinths

Bolt failures For necked hold down bolt, material needs to be ductile (stretchy) therefore high tensile material not suitable. Large M24 and M30 Hold down bolts need to be embedded up to 300mm into the foundations.

Summary – Key Find from Marlborough2013 Personnel safety is key – safe walkways and platforms are required by law. Above 15kl, tanks on plinths with skirts that extend to the foundation performed the best. Bolt your equipment, tanks and platforms down. Ensure your holddown bolts are installed in accordance with manufactures recommendations. Fully embedded into the foundations.

Produce a specification for your Tanks. Specify the conditions and level of product risk you want your tanks built for. Design Variables –Design Life 50 years. –Percentage Full = 100% –SG of Product = 1.05 –Soil Type D. –Location = Napier (Hazard Factor = 0.38) –Important Level 1, 2 if supporting walkways, or ? to meet your business risk for that tank.

Any Questions