GRL Dynamic Pile testing with the Pile Driving Analyzer® © 1998 Goble Rausche Likins and Associates and Dr. Julian Seidel.

Slides:



Advertisements
Similar presentations
P-wave S-wave Particles oscillate back and forth Wave travels down rod, not particles Particle motion parallel to direction of wave propagation Particles.
Advertisements

Elasticity Hooke's Law : the extension in an elastic string is proportional to the applied force . T = x = extension l = natural length =
Spring 2007 Dr. D. M. McStravick Rice University
8. Axial Capacity of Single Piles
Pile Capacity Based on Dynamic Methods & Wave Equation Bigman Hutapea-Prodi Teknik Sipil,FTSL-ITB Sebagian besar materi diambil dari materi kursus singkat.
Wave Equation Applications 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Work Done by a Constant Force
SOFT SOIL (PROBLEMS & STABILISATION METHOD) Session 2 - 7
Unit 3 Kinematics Equations
Special Design and Construction Considerations
Physics. Session Kinematics - 3 Session Objectives Problems ? Free fall under gravity.
Volume 4: Mechanics 1 Vertical Motion under Gravity.
Foundations. Feature common to bridge and building structures Deep vs. shallow Safely transfer dead and live loads with acceptable levels of settlement.
Static Equilibrium And Elasticity (Keseimbangan Statik dan Kekenyalan)
DESIGN AND ANALYSIS OF DEEP FOUNDATION WEEK 9 FRICTION AND END BEARING PILES BEARING CAPACITY ANALYSIS OF PILES USING EMPIRICAL AND DYNAMIC FORMULAE.
BENDING MOMENTS AND SHEARING FORCES IN BEAMS
Analyses of tunnel stability under dynamic loads Behdeen Oraee; Navid Hosseini; Kazem Oraee 1.
Chapter 2 Preview Objectives One Dimensional Motion Displacement
Chapter 9 Static Equilibrium; Elasticity and Fracture
Objectives Recognize the difference between the scientific and ordinary definitions of work. Define work by relating it to force and displacement. Identify.
CTC / MTC 222 Strength of Materials Final Review.
Vibration and Waves AP Physics Chapter 11.
Basic Structural Theory. BASIC STRUCTURAL THEORY TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 Beams Different member types.
Kinetic Energy and Work Chapter 7 Copyright © 2014 John Wiley & Sons, Inc. All rights reserved.
Additional Design Considerations 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
DISPLACEMENT AND VELOCITY Chapter 2-1. Objectives Describe motion in terms of frame of reference, displacement, time and velocity. Calculate displacement,
JJ205 ENGINEERING MECHANICS COURSE LEARNING OUTCOMES : Upon completion of this course, students should be able to: CLO 1. apply the principles of statics.
Preview Objectives Definition of Work Chapter 5 Section 1 Work.
PILE DRIVING BY WAVE MECHANICS George Goble GOBLE PILE TEST.
© Houghton Mifflin Harcourt Publishing Company The student is expected to: Chapter 2 Section 1 Displacement and Velocity TEKS 4A generate and interpret.
Kinematics in One Dimension We will focus today on problem- solving. Note: some problems are hard, some are not so hard. Part of the learning is recognizing.
Welcome to AP Physics B Ms. Bridwell Spring 2014.
CH 14 Sections (3-4-10) Sound Wave. Sound is a wave (sound wave) Sound waves are longitudinal waves: longitudinal wave the particle displacement is parallel.
Chapter 4 Axial Load. Saint -Venant's Principle Saint-Venant's Principle claims that localized effects caused by any load acting on a body will dissipate.
Copyright © 2010 Pearson Education South Asia Pte Ltd
Engineering Mechanics: Statics
OMAE 2009 Honolulu, HI - May 31 to June
© Houghton Mifflin Harcourt Publishing Company Preview Objectives Definition of Work Chapter 5 Section 1 Work.
AFT STATNAMIC Load Testing of High Capacity Marine Foundations
Static Equilibrium and Elasticity
Copyright © 2010 Pearson Education South Asia Pte Ltd WEEK 8: FRICTION THE BEST APPLICATION OF FRICTION.
© Houghton Mifflin Harcourt Publishing Company Preview Objectives One Dimensional Motion Displacement Average Velocity Velocity and Speed Interpreting.
 2005 Pearson Education South Asia Pte Ltd 4. Axial Load 1 CHAPTER OBJECTIVES Determine deformation of axially loaded members Develop a method to find.
Wave Equation Applications 2009 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Session 19 – 20 PILE FOUNDATIONS
1 MFGT 104 Materials and Quality Compression, Shear, Flexural, Impact Testing Professor Joe Greene CSU, CHICO.
 Vertical projectile motion deals with objects that fall straight down, objects that get thrown straight up and the motion of an object as it goes straight.
PILE FOUNDATIONS UNIT IV.
1 MISCELLANEOUS Pile driving formulae To develop the desired load carrying capacity, a point bearing driven pile must penetrate sufficiently into a dense.
Today: (Ch. 3) Tomorrow: (Ch. 4) Apparent weight Friction Free Fall Air Drag and Terminal Velocity Forces and Motion in Two and Three Dimensions.
Work & Energy Principles
VERTICAL ONE DIMENSIONAL MOTION.  Relate the motion of a freely falling body to motion with constant acceleration.  Calculate displacement, velocity,
Pile Foundation Reason for Piles Types of Piles
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Soil mechanics and foundation engineering-III (CE-434)
Prepared by:- Barham Jalal
Kinetic Energy and Work Chapter 7. Definition: The Energy (E) of a body is its capacity to do work. Energy is present in the Universe in various forms.
Mechanics of Materials – MAE 243 (Section 002) Spring 2008 Dr. Konstantinos A. Sierros.
The student is expected to:
11 Energy Methods.
PILE DRIVING BY WAVE MECHANICS
Copyright © 2010 Pearson Education South Asia Pte Ltd
Foundations.
11 Energy Methods.
CHAPTER OBJECTIVES Determine deformation of axially loaded members
Chapter 14 : Kinematics Of A Particle – Work and Energy
Work, energy and power.
Energy Problems.
Presentation transcript:

GRL Dynamic Pile testing with the Pile Driving Analyzer® © 1998 Goble Rausche Likins and Associates and Dr. Julian Seidel

GRL SummarySummary History of Dynamic Pile TestingHistory of Dynamic Pile Testing Measuring stress wavesMeasuring stress waves Fundamentals of Wave MechanicsFundamentals of Wave Mechanics The Case Method (Pile Driving Analyzer)The Case Method (Pile Driving Analyzer) –Capacity –Stresses –Integrity –Hammer performance

GRL 18th Century:Closed Form Solutions Late 19th Century:Engineering News Formula 1920’s: First Strain Measurements 1950:Smith’s Wave Equation Program 1964:Case Project began under Dr. G.G. Goble 1968:Pile Driving Analyzer ® (PDA) 1970:CAPWAP ® 1972:Pile Dynamics, Inc. founded 1976: WEAP program 1977:Saximeter 1982:Hammer Performance Analyzer 1986: Hammer Performance Study 1989:Pile Integrity Testing (PIT) 1996: FHWA Manual 1998:Pile Installation Recorders (PIR) 1999:Remote PDA History of Dynamic Pile Testing/Analysis

GRL 1-D Wave Theory Hammer causes a downward travelling stress-wave to enter the pileHammer causes a downward travelling stress-wave to enter the pile Soil resistance causes stress-wave reflectionsSoil resistance causes stress-wave reflections Stress in pile can be represented by 1-dimensional Wave TheoryStress in pile can be represented by 1-dimensional Wave Theory These stress-waves can be measured and identified with measurement of force and velocity near the pile topThese stress-waves can be measured and identified with measurement of force and velocity near the pile top

GRL W2W2W2W2 m2m2m2m2 m2m2m2m2 W1W1W1W1 m1m1m1m1 m1m1m1m1 v1v1v1v1 v1v1v1v1 v1v1v1v1 v1v1v1v1 Newtonian Collision Analogy Hammer is a concentrated mass “Rigid body” motion assumption is reasonable Hammer is a concentrated mass “Rigid body” motion assumption is reasonable Pile is a longitudinally-distributed mass “Rigid body” motion assumption is not reasonable Motion is dominated by stress-wave effects Pile is a longitudinally-distributed mass “Rigid body” motion assumption is not reasonable Motion is dominated by stress-wave effects

GRL Impact on elastic rod F dL time = dt Compressed Zone Cross-sectional area, A Elastic modulus, E Mass density,  Cross-sectional area, A Elastic modulus, E Mass density,  Stress,  = F/A Wavespeed, c = dL/dt Stress,  = F/A Wavespeed, c = dL/dt

GRL Particle Velocity FdLF F dx dx = F dL EA EA dx = F dL EA EA v = dx = F dL = F c dt EA dt E A dt EA dt E A v = dx = F dL = F c dt EA dt E A dt EA dt E A Particle Speed Wave Speed

GRL v = F c EA EA v = F c EA EAdL Cross-sectional area, A Mass density,  Cross-sectional area, A Mass density,  Wavespeed a = dv = d Fc dt dt EA dt dt EA a = dv = d Fc dt dt EA dt dt EA F = ma = dL A  a = dL A  a F = ma = dL A  a = dL A  a F = dL A  F c dt E A dt E A F = dL A  F c dt E A dt E A c 11 c 2 = E c 2 = E    US  US  SI  SI

GRL Wavespeed Example (SI units) Determine the wavespeed for a concrete pile with the following properties: E = 40,000 MPa  = 24.5 kN/m 3 Answer:Determine the wavespeed for a concrete pile with the following properties: E = 40,000 MPa  = 24.5 kN/m 3 Answer: c 2 = 40,000 x 1000 x 9.81 / 24.5c 2 = 40,000 x 1000 x 9.81 / 24.5 c 2 = 1.602x10 7 m 2 /s 2c 2 = 1.602x10 7 m 2 /s 2 c = 4002 m/s ~ 4000 m/s.c = 4002 m/s ~ 4000 m/s. 

GRL Force, velocity, stress and strain v = d x = F dL = Fc dt EA dt EA dt EA dt EA v = d x = F dL = Fc dt EA dt EA dt EA dt EA Particle Speed Wave Speed F = EAv c c Pile Impedance F = EAv c = Zv = Zv F = EAv c = Zv = Zv F =  = v E A c F =  = v E A c  =  = v E c  =  = v E c  US  US  SI  SI

GRL F,v, ,  Example (SI units) A steel H-pile of 12,000 mm 2 x-secn area reaches a peak velocity of 6.2 m/s during impact. What are the peak strain, stress and force in the pile-top? (For steel, E = 210,000 MPa, c = 5120 m/s).A steel H-pile of 12,000 mm 2 x-secn area reaches a peak velocity of 6.2 m/s during impact. What are the peak strain, stress and force in the pile-top? (For steel, E = 210,000 MPa, c = 5120 m/s). Answer:Answer:  = v/c = 6.21/5120 = 1.213x10 -3  = v/c = 6.21/5120 = 1.213x10 -3  = .E = 1.213x10 -3 x 210,000 = 255 MPa  = .E = 1.213x10 -3 x 210,000 = 255 MPa F = .A = 255 x 12,000x10 -6 = 3.06 MN F = .A = 255 x 12,000x10 -6 = 3.06 MN 

GRL Force and Velocity Measurements W 2W Strain transducer Accelerometer

GRL Measuring stress waves Strain transducer Accelerometer

GRL Strain Transducer C C Resistance strain gages connected in Wheatstone bridge configuration CT TC T T TC CT F =  A =  EA

GRL AccelerometersAccelerometersPiezo-electricAccelerometerPiezo-electricAccelerometer mass spring quartzcrystal Piezo-resistiveAccelerometerPiezo-resistiveAccelerometer v =  a.dt mass strain gage cantilever

GRL Sign Conventions Force: Compression -positive (+)Compression -positive (+) Tension -negative (-)Tension -negative (-) Velocity: Downward -positive (+)Downward -positive (+) Upward-negative (-)Upward-negative (-)

GRL Infinite Pile Compressivestress-wave Wavespeed, c F(x,t) Compression = +ve v(x,t) Motion down pile = + F = EAv c = Zv = Zv F = EAv c = Zv = Zv Cross-sectional area, A Elastic modulus, E Cross-sectional area, A Elastic modulus, E x = constant

GRL Time domain - infinite pile ExponentialDecay F = EAv c c

GRL Finite pile with free end + Free End : F = 0 +F-F - incident force wave reflected in opp. sense

GRL Direction of Motion Downward Travelling (incident) Waves TOPTOE Force + Velocity + V Force - Velocity - F= Zv T C V

GRL Direction of Motion Upward Travelling (reflected) Waves TOPTOEV Velocity - Force + V Velocity + Force - F=-ZvF=-ZvC T

GRL Finite pile with free end F+, v+ + F-, v+ + +v+v incident wave pushes pile down reflected tension wave pulls pile down Free End : v doubled x = constant

GRL Time Domain - free pile Characteristic tension response - velocity increases relative to force response time = 2L/c  US  US  SI  SIZv F

GRL Free end example (SI) A 25m long 300mm segmental precast concrete pile is installed through deep organic sediments. Pile resistance is negligible. The pile modulus is 38,000 MPa. What is the maximum tension stress in the pile for a peak pile-top velocity of 1.15 m/s? What action do you recommend?A 25m long 300mm segmental precast concrete pile is installed through deep organic sediments. Pile resistance is negligible. The pile modulus is 38,000 MPa. What is the maximum tension stress in the pile for a peak pile-top velocity of 1.15 m/s? What action do you recommend? AnswerAnswer c =  E/  = 38,000x9.81x10 3 /24.5 = 3900 m/sc =  E/  = 38,000x9.81x10 3 /24.5 = 3900 m/s  = v/c = 1.15/3900 = 2.95x10 -4  = v/c = 1.15/3900 = 2.95x10 -4  = .E = 11.2 MPa. (Tension = Compression)  = .E = 11.2 MPa. (Tension = Compression) Reduce the drop heightReduce the drop height 

GRL Finite pile on rigid base + -+v-v incident wave pushes pile down reflected wave pushes pile up GRANITE Fixed End : v = 0

GRL Finite pile on rigid base v+, F+ +C v-, F+ +C+F+F incident wave pushes pile down reflected wave pushes pile up GRANITE x = constant Fixed End : F doubled

GRL Time domain - pile on rigid base Characteristic compression response - force increases relative to velocity response time = 2L/c  US  US  SI  SIF Zv

GRL Fixed end example (SI) A 10m long 300mmx6mm wall Grade 250 steel pipe pile is installed through soft clay on to fresh basalt rock. What is the maximum section stress at the pile toe if the maximum pile-top velocity is 3.22 m/s? What is likely to result?A 10m long 300mmx6mm wall Grade 250 steel pipe pile is installed through soft clay on to fresh basalt rock. What is the maximum section stress at the pile toe if the maximum pile-top velocity is 3.22 m/s? What is likely to result? AnswerAnswer c =  E/  = 210,000x9.81x10 3 /78.5 = 5120 m/sc =  E/  = 210,000x9.81x10 3 /78.5 = 5120 m/s  = v/c = 3.22/5120 = 6.29x10 -4  = v/c = 3.22/5120 = 6.29x10 -4  = 2 .E = 264 MPa. (double compression in)  = 2 .E = 264 MPa. (double compression in) Buckling of the pile toe (esp local)Buckling of the pile toe (esp local) 

GRL Separation of Waves F  =Zv  Downward Waves F  =-Zv  Upward Waves F = F  + F  v = v  + v  F  = ½ (F+Zv) Downward Waves F  = ½ (F-Zv) Upward Waves  US  US  SI  SI E=mc 2 E=mc 2

GRL Waves - Proof 1 F  = Zv  2 F  = -Zv  3 F = F  +F  4 v = v  +v  5  Zv = Zv  +Zv  6  Zv = F  - F  7  +  : F + Zv = 2F  …or F  = ½(F + Zv) 8  -  : F - Zv = 2F  …or F  = ½(F - Zv) 

GRL Waves example (SI) At impact a 300mmx6mm wall Grade 250 steel pipe pile achieves a peak velocity of 5.34 m/s, 10m above ground level. At time 2L/c later, the force and velocity are measured at 1620 kN and m/s. What are the upward and downward waves at impact and 2L/c later? AnswerAt impact a 300mmx6mm wall Grade 250 steel pipe pile achieves a peak velocity of 5.34 m/s, 10m above ground level. At time 2L/c later, the force and velocity are measured at 1620 kN and m/s. What are the upward and downward waves at impact and 2L/c later? Answer EA/c = 210,000x5542x10 -3 /5120= 227 kNs/mEA/c = 210,000x5542x10 -3 /5120= 227 kNs/m At impact F d = 227x5.34 = 1214 kN; F u = 0 kNAt impact F d = 227x5.34 = 1214 kN; F u = 0 kN At 2L/c F d = ½( x-2.67) = 507 kNAt 2L/c F d = ½( x-2.67) = 507 kN At 2L/c F u = ½( x-2.67) = 1113 kNAt 2L/c F u = ½( x-2.67) = 1113 kN 

GRL Waves - pile on rigid base F Zv F,Zv F  = ½(F + Zv) F  = ½(F - Zv)

GRL Time of reflection xR Total travel distance = 2x Wavespeed = c Reflection from resistance at x arrives at pile-top at time arrives at pile-top at time Reflection from resistance at x arrives at pile-top at time arrives at pile-top at time 2x/c  US  US  SI  SI

GRL Timing example (SI) Measurments on an existing preast concrete pile of unknown length indicate a modulus of 35,000 MPa. The dynamic records show a compressive response commencing 4.3ms after impact, and a tension response at 11.7ms. What is the depth to soil resistance, and estimate the pile length. AnswerMeasurments on an existing preast concrete pile of unknown length indicate a modulus of 35,000 MPa. The dynamic records show a compressive response commencing 4.3ms after impact, and a tension response at 11.7ms. What is the depth to soil resistance, and estimate the pile length. Answer c =  E/  = 35,000x9.81x10 3 /24.5 = 3740 m/sc =  E/  = 35,000x9.81x10 3 /24.5 = 3740 m/s Length to resistance = ½(3.74x4.3) = 8.0mLength to resistance = ½(3.74x4.3) = 8.0m Pile length = ½(3.74x11.7) = 21.9mPile length = ½(3.74x11.7) = 21.9m 

GRL Typical pile response toe response time = 2L/c start of toe response response from shaft only response from pile base timing and amount of separation is a function of location and extent of soil resistance

GRL Typical pile response toe response time = 2L/c F  = ½ (F+Zv) exponential decay FFFF returning compressive reflections lift pile-top force…....and slow the pile-top down relative to the “no resistance” pile

GRL Typical pile response F  = ½ (F-Zv) toe response time = 2L/c F=½RF=½RF=½RF=½R F=½RF=½RF=½RF=½R upward travelling wave before 2L/c is related to the cumulative shaft resistance R shaft  2F 2L/c

GRL Typical pile response Q. Why may it be preferable to view data as F , F  ? Downward wave - isolates input from driving system Upward wave - isolates response from pile/soil  US  US  SI  SI

GRL Shaft resistance (SI) 2340kN; 3.34 m/s 1420kN -1.32m/s Problem: Make an approximate estimate of the pile shaft resistance. Problem: Make an approximate estimate of the pile shaft resistance. Answer:Answer: Z = 2340/3.34 = 700 kNs/mZ = 2340/3.34 = 700 kNs/m R 2 x F 2L/cR 2 x F 2L/c R 2x ½( x-1.32) = 2344 kNR 2x ½( x-1.32) = 2344 kN 

GRL Conclusion Pile driving events can be evaluated using 1-D Wave Mechanics principlesPile driving events can be evaluated using 1-D Wave Mechanics principles Stress-waves cause changes in force and particle velocityStress-waves cause changes in force and particle velocity Force and velocity are related by the pile impedanceForce and velocity are related by the pile impedance Waves travelling both up and down a pile can be separated by F and V measurementWaves travelling both up and down a pile can be separated by F and V measurement Soil resistance causes reflections which can be interpreted to determine extent and location of resistanceSoil resistance causes reflections which can be interpreted to determine extent and location of resistance

GRL Case-Goble Capacity A pile is struck at time t 1. The impact force generates a wave F(down,t 1 ) F( ,t 1 ) L The impact wave returns to the pile top at time The impact wave returns to the pile top at time t 2 = t 1 + 2L/c together with all resistance waves F( ,t 2 )

GRL The Case Method Equation At time t 2 = t 1 + 2L/c the upward traveling waves arriving at the pile top include the reflection of the initial impact wave plus the sum of all resistances: Or, rearranging we solve for the resistance: R = (F 2 -v 2 Z)/2 + (F 1 +v 1 Z)/2 where R is the total pile resistance, mobilized at a time L/c after t 1. F( ,t 2 ) = - F( ,t 1 ) + R 

GRL The Case Method Equation R = ½(F 1 + Zv 1 + F 2 - Zv 2 ) F 1 and v 1 are pile top force and velocity at time 1 F 2 and v 2 are pile top force and velocity at time 2 Time 2 is 2L/c after Time 1: t 2 = t 1 + 2L/c R is the total pile resistance present at the time of the test, and mobilized by the hammer impact.

GRL Static Resistance example - US units 2L/c = 10ms Zv 2 F2F2F2F2 Zv 1 F1F1F1F1

GRL Case-Goble Static Resistance R static = R - R dynamic Total Resistance = Static + Dynamic  US  US  SI  SI J c = ? J c = ? Need to estimate R dynamic (Estimate it from pile velocity)

GRL Case Damping Factor To calculate static from total resistance, a viscous damping parameter, J v, is introducedTo calculate static from total resistance, a viscous damping parameter, J v, is introduced R d = J v v Non-dimensionalization leads to the Case Damping Factor, J c :Non-dimensionalization leads to the Case Damping Factor, J c : J c = J v  Z  R d = J c Z v J c = ? J c = ?

GRL Case-Goble Static Resistance R static = R - R dynamic R s = (1-J c )[F 1 + Zv 1 ]/2 + (1+J c )[F 2 - Zv 2 ]/2 Total Resistance = Static + Dynamic  US  US  SI  SI J c = ? J c = ?

GRL Case Damping Factor Values for RMX Gravel Sand Clay Silt Reducing Grain Size Reducing Increasing Damping factor Increasing 

GRL Restrike testing - fine grained soils log time capacity 1 day 10 days 100 days 1000 days Technically desirable E Economically desirable Restrike testing generally under- taken 1 to 10 days after installation

GRL Mobilized Resistance Displacement, x Resistance, R Displacement for full mobilization Mobilized Resistance Ultimate Resistance Maximum test displacement

GRL Resistance: Rules for good correlation Need to Mobilize CapacityNeed to Mobilize Capacity (sufficient set per blow) Account for time dependent strength changes Account for time dependent strength changes Setup - Capacity increase Relaxation - Capacity decrease Therefore, restrike test pile after sufficient wait using a sufficiently large impact weight

GRL Capacity Results Capacity Results GRLWEAPGRLWEAP by numerical analysis of assumed pile/hammer/soil prior to installationby numerical analysis of assumed pile/hammer/soil prior to installation Case MethodCase Method measured by PDA during installationmeasured by PDA during installation CAPWAPCAPWAP by numerical analysis of measured PDA data after installationby numerical analysis of measured PDA data after installation

GRL The Pile Driving Analyzer calculates...

GRL … PDA Results … PDA Results Case Method Bearing CapacityCase Method Bearing Capacity Pile StressesPile Stresses Compressive at TopCompressive at Top Bending at TopBending at Top Tension Below TopTension Below Top Compressive at BottomCompressive at Bottom Pile Integrity (Beta)Pile Integrity (Beta) Transferred EnergyTransferred Energy

GRL PDA RESULTS vs GRLWEAP CAPACITYCAPACITY –PDA: from force and velocity records –GRLWEAP: from analysis and blow count TOP STRESSESTOP STRESSES –PDA:directly measured –GRLWEAP: from analysis and blow count Note:Note: Max. Compressive Stress does NOT always occur at Pile Top Max. Compressive Stress does NOT always occur at Pile Top