April 5, 2012 Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Todd Bragdon, CDM Smith Brandon Ball, Parametrix Bill Adams,

Slides:



Advertisements
Similar presentations
2008 Subsurface 3D Modeling: An Application to Waterfront Project Planning and Site Evaluation Andrew S. Thomas Moffatt & Nichol 600 University St, Ste.
Advertisements

June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Azurite Mine Overview Abandoned Underground Gold Mine, Located in North-Central WA on USFS-Administered Land Northwest of Mazama, Near Harts Pass Recreation.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Bart Bretherton, RG Region 2 Hazmat Coordinator Lessons Learned from Unanticipated Cleanup on a Preservation Project (a tale of whoa)
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.
Partnerships and Processes Landfill Redevelopment.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
Drainage Channel Restoration Construction Project Wood Co. Engineer’s Office Great Lakes Protection Fund A.D. Ward, D. Mecklenburg, R. McCall, D.J. Mears.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Abstract This project identifies, maps, and interprets the various sediment packages that resulted from the construction of E. N. Colton’s saw and shingle.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Pershing Hill Elementary School Burn Pit Stockpile Removal Project 1.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
PIT MANAGEMENT Why? Technical Standards Branch CEA PRESENTATION Revised Feb14 Bruce Blue.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Disaster Debris Preparedness Planning Angeline McInerny Wake County Environmental Services Department.
USEPA R10 Federal On-Scene Coordinator Third Quarter 2014 Report Regional Response Team Northwest Area Committee Meeting Portland, OR October 7, 2013.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Level IB: Advanced Fundamentals Seminar
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Mining And its environmental impact. What determines the type of mining? Underground v.s. Surface Mining v.s. Solution Underground v.s. Surface Mining.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
New Mexico Uranium Exploration & Mining BLM Uranium Workshop August 12, 2008 Salt Lake City, Utah Holland Shepherd, Program Manager Mining Act Reclamation.
Cultural Resources and Structural Rehabilitation Your NRCS Responsibilities.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.
  16 th Annual OSC Readiness Training Program Community Involvement Case Study – Standard Mine Gina Cristiano R8 Emergency Planning.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
Rick Moore, Hart Crowser
Upper Newsome Creek Habitat Improvement Pre-solicitation Restoration of Upper Newsome Stream Reach 3 and Haysfork Sediment Pond Restoration.
Earthwork & Volumes Spec Requirements End Areas End-area Volumes
Photo Placeholder Bloedel Donovan Park Stormwater Retrofit Alternatives and Analysis May 31 st 2013.
UNIT 6 STANDARDS: NCES 2.3.2, 2.4.1, LESSON 1
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015.
November 17, 2015 Application of ASTM’s Greener Cleanup Guide to a Superfund Site in Oregon Results and Take-Home Lessons Beth Sheldrake, Manager, Superfund.
Kwasi Badu-Tweneboah, Ph.D., P.E. – Geosyntec Consultants Jacksonville, Florida, USA Kenneth W. Cargill, P.E. – KW Cargill, P.A.. Punta Gorda, Florida,
Providing Safe Waterfowl Feeding Habitat in Toxic Floodplains
Resident Engineer Panel Discussion Jack Stone, P.E. District 2 Engineer, Casper Chad Aagard, P.E. District 2 Engineer, Casper Pete Hallsten, P.E. District.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Iowa BMPs for soil erosion prevention. BMP context BMPs needed for managed land (duh!) Strategies differ by land- use – Ag/crops (>71%) +/- CRP, etc –
Emergency Landslide Correction Benefits of a Contract Joey Franzino, P.E. INDOT Geotechnical Operations Engineer September 23, 2015.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
 Working with FHWA on review.  Submit to Cooperating Agencies (EPA and Corp of Engineers)  45 day review May  Respond to agency comments  Publish.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
GEOLOGY RECOMMENDATION SHEET GEOLOGY NOTESGEOLOGY RECOMMENDATIONS WYOMING DEPARTMENT OF TRANSPORTATION MATERIALS TESTING LABORATORY PROJECT __________________________________.
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Middle Harbor Redevelopment: Third Party Fill Material
And its environmental impact
Emphasis on Quality Rochester’s City Owner Contract Process
Kastanis- Existing Conditions
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

April 5, 2012 Managing Mine Slimes and Other Lessons Learned Jack Waite Mine Removal Action Todd Bragdon, CDM Smith Brandon Ball, Parametrix Bill Adams, EPA Region 10 Rod Zion, USACE Seattle Jeff Johnson, US BLM Rich Hamlin, Conti

Introduction Project Team – Parametrix / CDM Smith; Engineering Design – U.S. EPA Region 10; Lead Regulatory Agency – U.S. Forest Service; Property Owner, Joint Lead Regulatory Agency – U.S. Army Corps of Engineers – Seattle District; Construction Procurement and Administration – Conti; Removal Action Contractor Site Features and Removal Actions – Removal of two tailings piles (TP1 and TP2) and Mill area in alluvial valley – Consolidation to two repositories: TP3 and Borrow Area 2 (BA2) – Rehabilitation of Tributary Creek Managing Mine Slimes – Jack Waite Mine Removal Action

Jack Waite Mine Layout Managing Mine Slimes – Jack Waite Mine Removal Action N Tailings Pile TP3 Borrow Area 1 Borrow Area 2 Tailings Pile TP2 Tailings Pile TP Level Adit and Waste Rock Pile Tailings Pile TP4

Tailings Pile 1, Mill Area, & Tributary Creek Managing Mine Slimes – Jack Waite Mine Removal Action TP-1 (110,000 cy); Mill Area (14,000 cy); Alluvium (2,900 cy) TP1 Mill Tributary Creek

Tailings Pile 2 Managing Mine Slimes – Jack Waite Mine Removal Action TP-2 (15,000 cy Tailings) TP2

Materials Management & Restoration (MMR) Issues 2011 MMR Issues Encountered at the Jack Waite Site – Difficult material types – Additional waste volumes – Insufficient borrow soil gradation characterization – TP3 alluvial repository configuration – Remote high elevation site; limited construction season Issue Discussion – Design approach – 2011 construction issue – Solutions / lessons learned Managing Mine Slimes – Jack Waite Mine Removal Action

Difficult Material Types Design Approach – Borings and cone penetrometers completed through tailings piles 2011 Construction Issue – TP2 slimes encountered in July 2011 – Difficult to excavate material – Difficult to haul material – transportation caused separation of solids / liquids & spills Solutions / Lessons Learned – Temporary stockpile material to dewater, addition of Portland Cement (5%); transportable; achieved good compaction – For tailings piles, focus on potential volume of this material Managing Mine Slimes – Jack Waite Mine Removal Action

Additional Waste Volumes Design Approach – Aerial survey / LiDAR data (2-ft. topographic contouring) – Test pit and boring extent / depth of mine wastes – Mine waste volumetrics developed using CAD 3D – Contingency volumes included (~30 Percent) 2011 Construction Issue – Additional waste rock volume at Mill Site (34,000 vs. 14,000 cy) – Additional tailings volume at TP2 (23,000 vs. 15,000 cy) – 2012 concerns with waste volume in Tributary Creek alluvium Solutions / Lessons Learned – Flexibility in repository design to allow additional capacity – Steep slopes and alluvial interface difficult to estimate Managing Mine Slimes – Jack Waite Mine Removal Action

Insufficient Borrow Soil Gradation Characterization Design Approach – Repository cover / rehabilitation area growth media and fill primarily developed from Borrow Area 2 – Test pits used to estimate depth of borrow soils – Field observations / geotechnical data used to evaluate gradation (oversize vs. granular material) – Borrow soil volumetrics developed using CAD 3D and gradation 2011 Construction Issue – Significantly more oversize material - 19,000 cy vs. 11,000 cy – Limited stockpiling areas / double handling in steep terrain Solutions / Lessons Learned – Design approach should use grizzly / screening for oversize rock Managing Mine Slimes – Jack Waite Mine Removal Action

TP3 Alluvial Repository Configuration Design Approach – EE/CA and Action Memorandum included TP2 repository located in Tributary Creek alluvial valley – Volume and cost constraints – Maximize mine waste in BA2 repository – Utilize low permeability cover to reduce infiltration – Utilize riprap toe armoring (100-yr event) ; HEC-RAS model 2011 Construction Issue – Tailings piping observed Solutions / Lessons Learned – Revised design to include toe drain system Managing Mine Slimes – Jack Waite Mine Removal Action

Remote High Elevation Site Design Approach – Completed design / contracting process in 2010 (utilized $1.2M ARAR funding) – Allowed for snow removal in bid for early mobilization – Allowed for flexibility in bid for one or two-season construction 2011 Construction Issue – Snow plowed in May; heavy precipitation in June; limited site construction until July Solutions / Lessons Learned – Field conditions can significantly impact schedule – Consider summer traffic on hauling Managing Mine Slimes – Jack Waite Mine Removal Action

Questions Managing Mine Slimes – Jack Waite Mine Removal Action