Intaver Institute Inc. Comparison of RiskyProject Professional vs Lite versions Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada.

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

RiskyProject Project Risk Management Software
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Project Information: Customizing and Printing Lesson 7.
Adaptive Management Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax: +1(403)
Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5 Quantitative Risk Analysis for Aerospace Industry.
Full Monte Cost and Schedule Risk Analysis
Approaches to Data Acquisition The LCA depends upon data acquisition Qualitative vs. Quantitative –While some quantitative analysis is appropriate, inappropriate.
Project Change Management
هوش تجاری فرشاد آقابزرگی
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada
Part II Project Planning © 2012 John Wiley & Sons Inc.
Statistics - Descriptive statistics 2013/09/23. Data and statistics Statistics is the art of collecting, analyzing, presenting, and interpreting data.
Monte Carlo Schedule Analysis The Concept, Benefits and Limitations Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403)
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
PMT 257_Day 4_Risk Management
Decision-Making In Project Management Decision Framing Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax:
Engineering Economy, Sixteenth Edition Sullivan | Wicks | Koelling Copyright ©2015, 2012, 2009 by Pearson Education, Inc. All rights reserved. TABLE 12-1.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Estimations In Project Management Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1(403) Fax: +1(403)
Paul S. Adler A Sneak Preview of the PMP Exam-Prep Workshop.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Risk Simulation Lecture No. 40 Chapter.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
PERT Chart Expert by Critical Tools Greater Cincinnati MPUG Chapter September 26, 2002 Presented by Chas Eddingfield GCMPUG Technology Chair - MSP Support.
How to Perform Project Risk Management for Oil and Gas Projects
Risk Event Modeling Risk event modeling in part of Intaver Institute’s presentations on project risk management and risk analysis Intaver Institute Inc.
Tm&i 2010 VII.1 technology management & innovation introduction to project management (iii) reviewing & operating projects.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
Intaver Institute Inc. Project and Portfolio Risk Management with RiskyProject Enterprise Project and Portfolio Risk Management with RiskyProject Enterprise.
College of Information Systems & Technology © 2001 University of Phoenix. University of Phoenix is a registered trademark of Apollo Group, Inc. in the.
RiskyProject Enterprise Project Portfolio Risk Management Software Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1 (403)
Roll the Dice with Confidence: Play to Win By Bill Carswell Adjunct Professor Embry Riddle Aeronautical University.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
CONTRACT CONTROL. IPM Global – Why IPM Exists We believe Project Management Software should be easy to use. We believe Software should be flexible, and.
Introduction to Project Management Project Monitoring and Control Lecture a This material (Comp19_Unit9a) was developed by Johns Hopkins University, funded.
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
1 Schedule Control with Microsoft Project 2003 P roject M anagement M ethodologies Laura Williams, PMP.
Chapter 11 Project Management.
John Philbrick PE, CCP, PMP
Key Features Advantages over PDF sharing Use Cases Clients
Eleanor Roosevelt High School
Project Management for Software Engineers (Summer 2017)
Look Ahead Schedule Training 2 Days Course From Tonex
CIS 517 RANK Lessons in Excellence-- cis517rank.com.
CIS 517 Education for Service-- tutorialrank.com
RiskyProject Enterprise Project Portfolio Risk Management Software
Monte Carlo Schedule Analysis
Quantitative Risk Analysis for Aerospace Industry
Event Chain Methodology
Quantitative Project Risk Analysis
RiskyProject 7 Project Risk Management Software Suite
Part II Project Planning © 2012 John Wiley & Sons Inc.
Webinar: Risk Management for Oil and Gas Projects
Webinar: Risk Management for Oil and Gas Projects
ENGINEERING MANAGEMENT (GE 404)
ابزار مدیریت ریسک : Risky Project
RiskyProject New Features and Benefits
Risk Event Modeling Intaver Institute Inc.
Risk Adjusted Project Schedules
ENGINEERING MANAGEMENT (GE 404)
Project Management Chapter 11.
Expedite Project Updates Using a Custom Status View
CAD DESK PRIMAVERA PRESENTATION.
Risk Analysis of Linear Project
Agile Project Management and Quantitative Risk Analysis
New Features RiskyProject 5 Intaver Institute Inc.
Program & Project Risks and Reporting with Oracle Primavera Cloud
Presentation transcript:

Intaver Institute Inc. Comparison of RiskyProject Professional vs Lite versions Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1 (403) Fax: +1 (403)

09/05/2015 Intaver Institute Inc. 2 RiskyProject Professional Advanced Project Risk Management and Schedule Risk Analysis Software RiskyProject Professional Advanced Project Risk Management and Schedule Risk Analysis Software RiskyProject Lite is a project risk analysis software. RiskyProject Lite includes schedule risk analysis, cost risk analysis, risk register, risk adjusted Gantt chart, multiple reporting view. RiskyProject Lite is designed for project managers without advanced knowledge of risk analysis theory. With it, you can create a project schedule or use project schedule from Microsoft® Project, Oracle® Primavera, or other project management applications. Once you have your schedule, just define your risks using risk register and calculate the schedule to determine your risk profile. Project managers can use RiskyProject Professional for planning, scheduling, quantitative and qualitative risk analysis, and performance measurement of projects with multiple risks and uncertainties. Project risk management: risk register risk ranking customizable risk matrix risk response and mitigation plans risk mitigation waterfall chart Monte Carlo schedule risk analysis: works as standalone and Microsoft Project Add-In integrated with Primavera and other project management software multiple statistical distributions replacement for Risk+ Comprehensive quantitative analysis and reporting Tracking with risks and uncertainties RiskyProject Lite and Professional: Descriptions RiskyProject Lite Monte Carlo Schedule Risk Analysis Software RiskyProject Lite Monte Carlo Schedule Risk Analysis Software

Statistical Distributions 09/05/2015 Intaver Institute Inc. 3 RiskyProject Professional has statistical distributions for all tasks and the project In RiskyProject Lite statistical distribution are hidden. You may view Low, Base, and High results of analysis. Exception: Microsoft Project Add-in In RiskyProject Lite statistical distribution are hidden. You may view Low, Base, and High results of analysis. Exception: Microsoft Project Add-in

Defining Uncertainties 09/05/2015 Intaver Institute Inc. 4 In RiskyProject Lite there is no interface to define statistical distribution for cost and duration. You may only define low, base, and high estimates. Internally it will become triangular distribution. RiskyProject Professional has interface to define statistical distribution.

RiskyProject Toolbar in Microsoft Project 09/05/2015 Intaver Institute Inc. 5 RiskyProject Professional Toolbar Scatter Plot for RiskyProject Professional Only Additional Views Both RiskyProject Professional and RiskyProject Lite are seamlessly integrated with Microsoft Project RiskyProject Lite Toolbar

Risk Register 09/05/2015 Intaver Institute Inc. 6 Risk Register is the same for RiskyProject Lite and RiskyProject Professional Both RiskyProject Lite and RiskyProject Professional can be used as a client for RiskyProject Enterprise RiskyProject Professional RiskyProject Lite Database RiskyProject Enterprise

Risk Drag’n’Drop View 09/05/2015 Intaver Institute Inc. 7 Risk Drag’n’Drop view is available only in RiskyProject Professional In RiskyProject Lite you would need to assign risks to tasks using Risks tab

09/05/2015 Intaver Institute Inc. 8 RiskyProject Lite RiskyProject Professional RiskyProject has additional views: -Project summary -Cost analysis -Cash Flow -Risk Chart -Sensitivity Analysis (Tornado diagram) -Success Rate -Critical Tasks -Tracking Gantt -Five reporting views RiskyProject has additional views: -Project summary -Cost analysis -Cash Flow -Risk Chart -Sensitivity Analysis (Tornado diagram) -Success Rate -Critical Tasks -Tracking Gantt -Five reporting views RiskyProject Lite and Professional: Views RiskyProject Lite has fewer analytical and reporting views.

Cost Analysis 09/05/2015 Intaver Institute Inc. 9 Cumulative probabilistic cost analysis view is available only in RiskyProject Professional Cost with Risks Cost without risks Actuals

Sensitivity Analysis 09/05/2015 Intaver Institute Inc. 10 Sensitivity analysis view is available only in RiskyProject Professional

Baselines 09/05/2015 Intaver Institute Inc. 11 Baselines (schedule snapshots) are available only in RiskyProject Professional

Probabilistic and Conditional Branching 09/05/2015 Intaver Institute Inc. 12 Conditional and probabilistic branching is available only in RiskyProject Professional

Cost vs. Duration Scatter Plot 09/05/2015 Intaver Institute Inc. 13 RiskyProject Professional has Cost vs. Duration Scatter Plot

09/05/2015 Intaver Institute Inc. 14 Additional Resources White Papers and Articles: Online Tutorials: Project Decisions: YouTube Channel: Contact Details Michael Trumper Intaver Institute Inc Project Think: Why Good Managers Make Poor Project Choices Project Decisions: The Art and Science Introduction to Project Risk Management and Decision Analysis