Basic Assumptions Facilities managing MSW must go through Site Assignment Materials that are pre-sorted are not considered MSW Residuals remaining after.

Slides:



Advertisements
Similar presentations
November 4,
Advertisements

Composting Rule Update Tim Farnan 2013 Minnesota Composting Council Fall Workshop.
Environmental health Definition: “the control of all those factors in man’ s physical environment which exercise or may exercise a deleterious effect on.
PREPARED BY- NABANITA SHARMA M.E. 3 RD SEMESTER ROLL NO.-10/12.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
The Proposed Part 115 Rules and Waste Utilization East and West Michigan Chapters of the Air and Waste Management Association & The Environmental Law Section.
Regulating Composting United States Composting Council Compost Operations Training Course March 4, 2015 Greg Reyes County of Riverside Department of Environmental.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
Mobile Washing Policy Florida Statutes Section contain the basic requirement for DEP regulation. Must be a stationary pollution source, such as.
Definition of Solid Waste Final Rule Public Meeting Charlotte Mooney Office of Resource Conservation and Recovery U.S. Environmental Protection Agency.
Exemption Categories Category 1 – Industrial, farm and residential Category 2 – Storage and processing Category 3 – Permits by Rule Category 4 – Recycling,
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
Massachusetts Avian Flu and Other Carcass Management Planning John Fischer MassDEP MHOA 2007 Seminars.
Wildlife Hazard Management ACI-NA CONFERENCE, MARCH 16, 2004.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Town of Lyndon Zoning Bylaw Changes Town Planning Commission Public Informational Meeting 09December09.
REGULATORY ACCEPTANCE OF POST-CLOSURE CARE INNOVATION Mr. Charles G. Johnson Colorado Department of Public Health and Environment Hazardous Material and.
Overview the local, state, and federal regulatory authorities which affect the interim housing mission Identify vital stakeholders with regulatory authority.
Roundtable on Sustainable Biofuels E n e r g y C e n t e r The Roundtable on Sustainable Biofuels Ensuring that biofuels deliver on their promise of sustainability.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
“Study on Other States’ Regulatory Oversight of Waste and Material Handling Activities Relative to Recycling Centers, Transfer Stations, and Green Material.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Agricultural Preserves Program Uniform Rules Update Office of Long Range Planning Board of Supervisors Hearing September 25, 2007.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Understanding the processing options FACTSHEET 5 Food and Garden Organics Best Practice Collection Manual.
Our Creeping Progression to Anaerobic Digestion of Multiple Solid and Sludge Wastes How Regulations, Permitting and Policy are Affecting the Emergence.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Life Cycle Assessment of Waste Conversion Technologies April 15, 2004.
Rigid Plastic Packaging Container (RPPC) Informational Update Permitting and Compliance Committee Meeting February 17, 2009.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
Senate Bill 99 Composting Overview Derek Rompot Illinois EPA.
Successful Application of SEP In Sitting Of Industries.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Clarification of the Proposed ELG Request for comments (Item A.2, p 182) Alternative Groundwater Assessments.
Alternatives Drying Class A Processing Dewatering Centrifuge, BFP Thickened Liquid Sludge Class A Land Application Incineration Pelletization Alkaline.
Jamie Doucett MassDEP. What Problems Are We Solving? Current regulations are inadequate to address technologies other than recycling and composting Are.
Life After Landfill – regulatory requirements Kate Hamer and Thomas Gallasch Waste to Resources, Regulation and Compliance EPA 27 th September 2007.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011.
AGENDA WORKSHOP OVERVIEW SURVEY RESULTS WETLAND SCENARIOS.
1 Indiana Department of Environmental Management Budget Presentation FY
25 September 2008 Risk Communication New and Emerging Waste Treatment Technologies – A Risk Communication Challenge Mike Studden Regional Head of Environmental.
CALIFORNIA WATER ISSUES Survey of Wine Institute Advocacy Efforts Wine Institute Board of Directors Meeting – March 8, 2016 Tim Schmelzer, Director of.
Slide 1 California Implementation Water Board Policies.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Southern California Emerging Waste Technologies Forum July 27, 2006 Conversion Technology 101.
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
NCACC Environmental Steering Committee Legislative Update October 2013.
Environmental Services Training Group
by John Mitchell, Director Division of Environment
Hudson Wetlands Protection Bylaw
Solid Waste Handling Standards
Georgia Update Jeff Cown Land Protection Branch
Tajiguas Resource Recovery Project Doing More with Our Waste
The Science of Compost Session 1.
Presented to the HB 171 Workgroup, 5/17/2018
Comprehensive Land Use Planning and Zoning
Presented to the HB 171 Workgroup, 5/17/2018
Forum on the strategies for the management and development of contaminated sites in Taiwan Shian-chee Wu October 25, 2007.
Presentation transcript:

Basic Assumptions Facilities managing MSW must go through Site Assignment Materials that are pre-sorted are not considered MSW Residuals remaining after separating recyclables from the waste is MSW POTWs managing SSO in addition to sludge in an AD unit are adequately regulated under BRP regulations and exempt from SW regulations Must ensure quality of both incoming pre-sorted materials and outgoing products Maintain standards of protection Provide for adequate public review and comment on permits

Options Option 1 - Site Assignment Lite Option 2 - Limited Revisions Option 3 - Expand Site Assignment Exemptions Option 3A – Include Other Conversion Technologies

Types of Operations Examples of operations handling pre-sorted materials: Agricultural anaerobic digester Advanced windrow composting Anaerobic digester >250 tpd Aerobic digester >250 tpd Gasification or other technology

Major Issues Quality and Type of Input Materials Source Separated Organics (SSO) Pre-sorted Materials Size of Operation Location of Facility Type of Technology Quality and Type of End Products

Option 1 - Site Assignment Lite Using the current site assignment process, create specific composting/recycling facility siting criteria for use by Boards of Health Issue: Should the siting criteria be modified or should any be added? Statutory requirements cannot be modified BOH timelines Public hearing requirement Need for BOH to issue site assignment decision

Option 1 - Site Assignment Lite Existing Handling Facility Siting Criteria No site is suitable where the waste handling area is: Within a Zone I of public water supply Within an IWPA or Zone II Within a Zone A of surface drinking water supply 500 feet upgradient or 250 feet of private water supply For TS <50 tpd, is fully enclosed system and 250 feet from residence, prison, health care facility, school, etc. For TS >50 tpd, is 500 feet from residence, prison, health care facility, school, etc. Within the Riverfront Area Maximum high groundwater is within 2 feet of ground surface

Option 1 - Site Assignment Lite Existing General Siting Criteria No site is suitable where the waste handling area is within: An area of designated Agricultural land Areas of Critical Environmental Concern (ACECs) Also, these issues must be addressed: Traffic impacts and access to site Impacts to Wildlife and wildlife habitat Protection of open space Potential air quality impacts Potential for creation of nuisances Sufficiency of Size of facility Impacts of Areas previously used for solid waste disposal Preference for locations with no Existing facilities Consideration of other sources of contamination or pollution Preference for locations with no Regional participation

Option 1 - Site Assignment Lite PROS Facilities that receive site assignment get protection provided by statute on zoning Siting criteria are tailored to specific types of facilities CONS Limited ability to modify process established by statute Site assignment process can be long and expensive Outcome of application process not guaranteed

Option 2 – Limited Approach Limited proposal – Clarifies/expands composting Redefines composting to include anaerobic and aerobic digestion Removes existing tonnage/size restrictions on composting facilities Removes restrictions on what types of compostable materials a facility may accept Uses existing DON criteria for review and approval Does not add new, more specific criteria to address location, types of materials or technologies Enhanced public notice procedures

Option 2 – Limited Approach PROS Addresses all current food waste proposals CONS Only addresses food waste/SSO materials and does not address other pre-sorted materials Does not address gasification, enzymatic/chemical conversion or other types of projects using pre-sorted materials Does not provide as much certainty to applicants because specific decision criteria not specified

Option 3 – Expand Site Assignment Exemptions Go beyond current limitations in definitions of composting and recycling Expand current exemptions for recycling and composting Enhance public notice process

Option 3 – Expand Site Assignment Exemptions Expand definitions of composting and recycling (as in Option 2) to include: Anaerobic digestion Aerobic digestion Propose two levels of permits: “Permit by Rule” for facilities that pose little risk (current conditional exemptions) Facility-specific permits for facilities that potentially pose greater risk than those in “permit by rule” category (similar to current DON process)

Option 3 – Enhanced Permitting Criteria Expand facility-specific permit process (DON): Expand and clarify permit application and decision criteria by considering: Adequacy of pre-sorting of the materials – What test must you pass? The site Size of facility Technology or process to be used End-products, quantities and product quality

Option 3 – Expand Site Assignment Exemptions PROS Fits into current regulatory scheme and builds on existing exemptions Clarifies process and criteria to be used for review CONS Does this option expand exemptions too much? Difficulty in developing review criteria given interrelationship of various criteria As size goes up, concerns (impacts) potentially go up As technology improves (i.e. in-vessel systems), concerns go down

Option 3A – Enhanced Criteria Assumption – Start with changes from Option 3 Add an exemption category for “conversion” technologies that are neither recycling nor composting Enzymatic/chemical Pyrolysis Other conversion technology Based on concept of handling only presorted materials and perhaps other criteria like non-compostable or non-recyclable Clarify the test for determining if materials are adequately pre- sorted If materials fail the test then they are MSW and facility requires site assignment Enhance public notice process

Option 3A – Enhanced Permitting Criteria PROS Provides category for reviewing/permitting future /unforeseen technologies CONS Does this option expand exemptions too much?

Other Options, Technologies or Activities? Consider picking and choosing Combine best of each option into new option What are we missing? Are there other options we should consider?