MineralScan Lite Installation Guidelines Digital Control Lab, LLC. 4647 NW 6 th Street, Suite F Gainesville, FL 32609 Main Unit power 90 – 240 VAC 50/60.

Slides:



Advertisements
Similar presentations
Electricity Merit Badge
Advertisements

Hardware Side of JT65-HF.
Basic Jens Neigaard.
NetSure™ RDB Series.
MineralScan MillSlicer Polar Plot Analysis – Shell Based Vibration Sensor Case 1. Empty Mill w/Excessive RPMs Case 2. Empty Mill w/Good RPMs Case 3. Full.

Installation ARIA IP - 60.
World AC/DC Power Supply Line Neutral Earth Line Neutral Ground USB 4-20mA interface RF Sen Open + - Fill Level DisplaymA Out Display + - (A)Acquired Signal(S)
Mains Supply Noadswood Science, 2012.
Pipeline Current Mapper PCM+
Troubleshooting Aircraft Charging Systems ( Alternators/Reciprocating Engines) by Herb Spenner.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
BSA Electricity Merit Badge Electricity Merit Badge AC Alternating Current.
“Power Supply” Controls Voltage Difference in Voltage is set Output Current is “as requested” by attached device.
AS-i, The Simplest Automation Networking Solution Dated: 10/30/2008.
CCTV SYSTEMS CAMERA POWER SUPPLIES.
3701 NW 40 th Terrace, #1, Gainesville, Florida USA MineralScan MillSlicer General Overview by Dr. Karl Gugel Director, Digital Control Lab & Lecturer/Researcher,
Electrical Wiring Three-Way Switches. Three-Way Switch.
Figure 1: The GT-1000 Solar PV Technology Panel
OBJECTIVES 1. Create correctly sized connectivity cabling.
INTRUSION ALARM TECHNOLOGY
Electrical Components.  This supplies all the power to the robot. It is a single 12 V battery. They are sealed to prevent battery acid from leaking.
Controller Wiring.
Electrical Fundamentals
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
This document includes confidential data that shall not be duplicated, used, distributed, or disclosed for any purpose unless authorized by Siemens. SIEMENS.
INTRUSION ALARM TECHNOLOGY
PROFIBUS wiring/installation can be done with:
Safety Al Penney VO1NO. Typical Home Electrical Service Meter Black Red White Fuses High Voltage 240 Volts 120 Volts 120 Volts Hot Neutral.
MineralScan Fill Level Signal Examples & Explanations - RNMC Introduction The MineralScan MillSlicer system normally consists of two fixed vibration sensors.
Copyright © 2009 Pearson Education, Inc. Back EMF, Counter Torque & Eddy Currents Example: Back EMF in a Motor. The armature windings of a dc motor have.
CHARGING SYSTEM Major Parts Battery                                               Alternator Regulator.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Wiring Schematics and Circuit Testing
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
SGI Confidential Power Bay. SGI Confidential Power Bay Front View AC OK LED DC OK LED Alarm LED Release Latch Power Bay 1 Power Bay 0 Power.
BOOT MODE 1 BOOT MODE 2 BIOS COMMUNICATION DEFAULT CONTROLLER INVERT RELAY OPERATION ENABLE COMM FAIL RELAY CONTROL RELAY OFF / ON COMM.
IPC Power Distribution Considerations A predominately important factor that should be considered in the design of a printed board is power distribution.
MillSlicer Polar Plot Examples & Explanations NW 6 th Street, Suite F Gainesville, Florida USA Introduction The shell.
Installation of heating cables, a light and an outlet with a thermostat and two pole circuit breaker.
ADT490 Panel Theory. 2 System Power Supply Grounding ‣ Circuit separates positive / negative from Ground ‣ Ground fault - resistance to ground ≤ 10 kΩ.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Automotive Engine Performance, 3/e By James D. Halderman Copyright © 2010, 2007, 2003 Pearson Education, Inc., Upper Saddle River, NJ All rights.
PR570 POWERITE II TRAINING Dedicated to Success in Electronic Servicing for 50 Years.
Advanced Engine Performance Diagnosis, Fourth Edition James D. Halderman Copyright ©2009 by Pearson Higher Education, Inc. Upper Saddle River, New Jersey.
Grounding.
Basic Equipment and Schematic Reading. Objectives Learn the basic equipment that will be used in the Lab. Learn some of the basic symbols used on electrical.
Connecting the cRIO to the 12 V power source and your computer
Diagnosis and Troubleshooting of Automotive Electrical, Electronic, and Computer Systems, 6/e - By James D. Halderman Copyright © 2012, 2010, 2005, 2001,
1 Transistor. 2 Transistors are used to turn components on and off They come in all different shapes and sizes.
Power Supply. 2 Power Supply w/Line Conditioner The power supply is the heart of the Millenium System. It can support between 15 DCD boards (power for.
Battery Charging System for Toy Truck
Dr. Cynthia Furse University of Utah
Elevator Control Unit.
Site Controller Unit and Trunk Interface Unit
Figure 17.1 (a) As an engine is accelerated under a load, the engine vacuum drops. (b) The relationship between absolute pressure, vacuum, and gauge pressure.
Dr. Cynthia Furse University of Utah
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
Understanding Olympian Generator Set Schematics
GROUND-FAULT GROUND-CHECK MONITOR
FEEDER PROTECTION UNIT
ECET 405 Innovative Education--snaptutorial.com
RV Solar Panel Installation
NI Data Acquisition (DAQ) Wiring and Connections
Module 1 – Power Supply AMC APS-PBC-60
Day 2 Training - Technical
Detailed information FOR INTERNAL USE ONLY! CUBE20.
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60 Hz (3) 4-20 mA cables (1000m/3000ft max) Ball Mill RF link (10 m) (2) sensors to main unit cable (10 m and 30m) transmitter, sensor, and battery inlet sensor outlet sensor Phone: +1 (352) Fax: +1 (813)

MineralScan Lite– System Components The Main Unit should be installed near the mill, so the supplied 10 and 30 meter (30 and 90 ft.) cables coils will reach both the Inlet/Outlet bearing sensors from the Main Base Unit. Fixed Inlet/Outlet Bearings Vibration Sensors Mill Shell Wireless Sensor Main Unit

Fixed sensors are shipped with a short 30 cm (~1 ft.) cable and a IP67 waterproof connector at the end. DCL supplies 10 meter and 30 meter (30 ft. and 90 ft.) shielded cable coils that each have a connector at one end of the cable and are open in the other end. These cables are passed (run) through conduit pipes from the sensors to the Main Unit. MineralScan Lite– Fixed Sensors Connection

MineralScan Lite– Typical Fixed Sensors Installation Fixed Sensors are magnetically attached to both the inlet and outlet bearings covers. Run the supplied cables in conduits to the Main Unit, pull the cables inside of the Main Unit, leave the terminals open, DCL will make the connections during commissioning time.

MineralScan Lite Main Unit MineralScan Lite– Main Unit Cables VAC 50/60 Hz power connection 3 x 4-20 mA Connections to PLC or DCS 3x14 AWG power cable supplied & installed by the customer 3 cables 2x18 AWG shielded cable supplied & installed by the customer Inlet bearing fixed sensor cable, supplied by DCL, installed by the customer Inlet Sensor Outlet Sensor Outlet bearing fixed sensor cable, supplied by DCL, installed by the customer

Receiver Board Main Power Circuit Breaker 4-20mA Interfaces (pre-wired by DCL) MineralScan Lite – Main Unit Components Mine Installed Connections Shown in Red AC Power Connection 4-20 mA Connections

DCL installed at commission time: 2: Sensor 1 Earth Ground 3: Sensor 1 Vibration signal 4: Sensor 1 DC+ 5: Sensor 1 DC- 6: Sensor 2 Earth Ground 7: Sensor 2 Vibration signal 8: Sensor 2 DC+ 9: Sensor 2 DC- Mine installed before commissioning time: 10: 4-20mA+ (Sensor 1 Level) 11: 4-20mA - (Sensor 1 Level) 12: 4-20mA+ (Sensor 2 Level) 13: 4-20mA - (Sensor 2 Level) 14: 4-20mA+ (Wireless Sensor Level) 15: 4-20mA - (Wireless Sensor Level) 1. Terminals 2-9 (blue) are the vibration sensor connections and are installed at commission time by Digital Control Lab personnel. 2.AC Power & 4-20mA Outputs (terminals in red) should be run and installed ahead of the commissioning date by mine personnel. Note: All 4-20mA signals requires +24VDC external loop power at PLC. MineralScan Lite– Main Unit Wiring Definitions Mine Installed Connections in Red AC Power Circuit Breaker 4-20mA Connections Sensor Connections