Data Center Site Infrastructure Tier Standard: Topology Dr. Natheer Khasawneh Sadeem Al-Saeedi (8276)

Slides:



Advertisements
Similar presentations
MAINTENANCE MANAGEMENT Module 9
Advertisements

Chapter 3: Planning a Network Upgrade
WHAT IS STEAM PRO? Thermoflow, Inc.
Halil SATIK Industrial Engineering Department, Dokuz Eylul University, Turkey.
Distributed Systems Major Design Issues Presented by: Christopher Hector CS8320 – Advanced Operating Systems Spring 2007 – Section 2.6 Presentation Dr.
The Data Centers, LLC Wolf Technology Center 1 Campus
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
Chapter 19: Network Management Business Data Communications, 5e.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Platinum Energy, Inc. Slide No. 1 PROJECT EVALUATION Joseph A. Orlando, Ph.D, PE Platinum Energy, Inc. Springfield, Virginia
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
PLANT DESIGN (I) Prof. Dr. Hasan farag.
© 2009 EMC Corporation. All rights reserved. Introduction to Business Continuity Module 3.1.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Reliability of Systems
1 Northwestern University Information Technology Data Center Elements Research and Administrative Computing Committee Presented October 8, 2007.
IFPAC-NeSSI Report.ppt; 29 January 2008; Slide 1Siemens Energy & Automation, Inc. Criteria for Design and Specification NeSSI Issues Presentation to IFPAC.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
™ כותרת Myths and Misconceptions in Datacenter Rating Shimon Katz, Data Center Project Manager ELECTRICITY 2013– Jerusalem, Israel.
Maintenance and Reliability
Basic Concepts of Computer Networks
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
THE ELECTRIC SUB STATION
The AHU From A Case Study Presented by David Sellers Portland Energy Conservation Inc. INLAND EMPIRE CHAPTER 1 - 2/27/2002.
Afternoon Agenda Deciding on your soldering equipment and important factors to consider on configuration for a robust process Reflow.
data center classifications or ratings
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
© 2008 Data Power Services, LLC By: Tom Taranto 2010 Energy Expo Hosted by National Grid NYSERDA Reducing Compressed Air Energy Cost Using a Systems Approach.
Chapter 2: Non functional Attributes.  It infrastructure provides services to applications  Many of these services can be defined as functions such.
ERT 322 SAFETY AND LOSS PREVENTION RISK ASSESSMENT
FY 2005/06 Accomplishment Eastern Maine Medical Center (EMMC) Receives “Critical Power Reliability” from CHP System CHP System Construction Project is.
Co-location Sites for Business Continuity and Disaster Recovery Peter Lesser (212) Peter Lesser (212) Kraft.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Overview of Data Center Energy Use Bill Tschudi, LBNL
Utility Engineers, PC.  Generation  Transmission  Distribution.
Introduction to switchgears
Unit-3 Reliability concepts Presented by N.Vigneshwari.
Component 8/Unit 9aHealth IT Workforce Curriculum Version 1.0 Fall Installation and Maintenance of Health IT Systems Unit 9a Creating Fault Tolerant.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Green Server Room Construction Primary concerns when building a server room is size and cooling. Size can be diminished with the use of virtual servers.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Chapter Seven Network Topology [tə'p ɒ ləd ʒɪ ]. In networking, the term “topology” refers to the layout of connected devices on a network. This article.
C21 World (UK) Consultancy Services for Telecom Industry DATA CENTERS
Equipment 1.Circuit Breaker. 3.Fuses. 4.Protecti- ve relay.2.Bus bar. TYPES OF SWITCH GEAR EQUIPMENT:-
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
1 FOM 2.2 Tier Certification Explained Keith Klesner Senior Vice President North America Uptime Institute.
Tier Certification Explained
Sub Station.
Lab A: Planning an Installation
Inventory Fundamentals
The Data Center Challenge
IOT Critical Impact on DC Design
HYDRONIC HVAC: The Most Comfortable and Efficient System
HYDRONIC HVAC: The Most Comfortable and Efficient System
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
ANSI/ASHRAE 90.4 Energy Standard for Data Centers
Operations Management
التحكم في استخدام المصادر
TPM Definitions Goals and Benefits Components GEOP 4316.
Operations Management
Unit I Module 3 - RCM Terminology and Concepts
DATA CENTERS C21 Engineering Consultancy Services for Telecom Industry
Operations Management
Definitions Cumulative time to failure (T): Mean life:
Inventory Fundamentals
Presentation transcript:

Data Center Site Infrastructure Tier Standard: Topology Dr. Natheer Khasawneh Sadeem Al-Saeedi (8276)

This Section will cover the Following  Commentary for Application of the Tier Standard – Topology  Outcome-Based Tier Standard  Impact of Ambient Design Conditions  Tier Functionality Progression  Fractional or Incremental Tier Classification

Outcome-Based Tier Standard  The definitions used are necessary and intentionally very broad to allow innovation and client manufacture in achieving the desired level of site infrastructure performance or uptime.  The operational outcomes that define the four Tiers are very straightforward. Many designs that pass a checklist approach will fail an operational performance requirements approach.

Tier I  Tier I sites experience 2 separate 12-hour, site-wide shutdowns per year for maintenance or repair work. In addition, Tier I sites experience 1.2 equipment or distribution failures on average each year.  The annual impact of maintenance and unplanned outages is 28.8 hours per year, or percent availability.

Tier II  Tier II sites (On Average) schedule 3 maintenance over a 2-year period and have 1 unplanned outage each year. The redundant components of Tier II topology provide some maintenance opportunity leading to just 1 site-wide shutdown each year.  The annual impact of maintenance and unplanned outages is 22 hours per year, or percent availability.

Tier III  Tier III topology is Concurrently Maintainable, so annual maintenance shutdowns are not required, but needs aggressive maintenance program improving overall equipment performance.  Unplanned failures are up to 4-hours event every 2.5 years, or 1.6 hours on an annual basis. Tier III sites demonstrate percent availability

Tier IV  Tier IV provides robust, Fault Tolerant site infrastructure  Unplanned failures are up to 4-hours event in a 5- year operating period, or 0.8 hours on an annual basis.  Tier IV sites consistently demonstrate percent availability.  Availability calculations do not determine the Tier Classification. e.g. A site with a measured infrastructure availability of percent

Impact of Ambient Design Conditions  The effective capacity of most cooling and power generating equipment is impacted by the actual ambient conditions in which it operates. These components typically require more energy to operate and provide less useable capacity so the ambient air temperatures rise.  Most conventional facilities selects design values applicable to most but not all anticipated hours of operation of that facility. This is not appropriate for data centers that are expected to operate on a 24 X Forever basis.

Impact of Ambient Design Conditions Cont..  Another concern arises when selecting heat rejection systems. Many manufactures provide product based on 95°F (35 C) ambient outside conditions. These components will be at best when operating in up to 95°F (35 C) outside air.  These component capacities must be adjusted downward to provide the required capacity when temperatures exceed 95°F.

Tier Functionality Progression  Tier I and Tier II solutions are typically solutions to short- term requirements, they are usually tactical solutions, driven by first-cost and time-to-market more than life- cycle cost and uptime (or availability) requirements.  Long-term viability found more often in Tier III and Tier IV site infrastructure.  Strategic site infrastructure solutions enable the owner to make strategic business decisions concerning growth and technology, unconstrained by current site infrastructure topology.

Tier I FP  Tier I solutions acknowledge the owner’s desire for dedicated site infrastructure to support IT systems.  Tier I infrastructure provides an improved environment over an ordinary office setting and includes: a dedicated space for IT systems; a UPS to filter power spikes, sags, and momentary outages; dedicated cooling equipment not shut down at the end of normal office hours; and an engine generator to protect IT functions from extended power outages.

Tier II FP  Tier II solutions include redundant critical power and cooling capacity components to increase the margin of safety incase of infrastructure equipment failures.  The redundant components are typically extra UPS modules, chillers, heat rejection equipment, pumps, cooling units, and engine generators. A malfunction or normal maintenance will result in loss of a capacity component.

Tier III FP  Tier III site infrastructure has Concurrent Maintenance.  Concurrent Maintenance means that each and every capacity or distribution component can be maintained on a planned basis without impact to the IT environment.  Maintenance allows the equipment and distribution paths to be returned to like new condition on a frequent and regular basis, Thus, the system will reliably and predictably perform as originally intended.

Tier III FP Cont…  Moreover, each and every system or component that supports IT operations must be able to be taken offline for scheduled maintenance without impact to the IT environment.  This concept extends to important subsystems such as control systems for the mechanical plant, start systems for engine generators, EPO (Emergency Power Off System) controls, power sources for cooling equipment and pumps, isolation valves, and others.

Tier IV  Tier IV site infrastructure builds on Tier III, adding the concept of Fault Tolerance to the site infrastructure topology.  Fault Tolerance extends to each and every system or component that supports IT operations. Tier IV considers that any one of these systems or components may fail or experience an unscheduled outage at any time.

Tier IV Cont…  However, the site must be designed and operated to tolerate the cumulative impact of every site infrastructure component, system, and distribution path disrupted by the failure. E.g. the failure of a single switchboard will affect every subpanel and equipment component deriving power from the switchboard. A Tier IV facility will tolerate these cumulative impacts without affecting the operation of the computer room.

Fractional or Incremental Tier Classification  The four Tier Classifications address topology, or configuration of a site rather than a list of components to achieve a desired operational outcome.  For example, the same number of chillers and UPS modules can be arranged on single power and cooling distribution paths resulting in a Tier II solution (Redundant Components), or on two distribution paths that may result in a Tier III solution (Concurrently Maintainable).

Fractional or Incremental Tier Classification Cont…  Selecting the appropriate topology solution based on the IT availability requirements, and the substantial financial consequences for downtime, provides the best foundation for investment in data center facilities.  Fractional or incremental descriptions for site infrastructure are not appropriate and are misleading. (Tier III +, Enhanced Tier III, or Tier IV-lite)  Including a criteria or an attribute of a higher Tier Classification in the design does not increase the overall Tier Classification

Fractional or Incremental Tier Classification Cont…  1) A site that has an extra (redundant) UPS module but needs all the installed cooling units running to keep the computer room temperature within limits does not meet the redundancy requirements for Tier II.  2) A switchboard that cannot be shut down without affecting more than the redundant number of secondary chilled water pumps (reducing the available capacity to less than N) is not Concurrently Maintainable and will not be Certified as Tier III.  3) Including a UPS system patterned after a Tier IV system within a site having a Tier II power distribution backbone yields a Tier II Certification.

Non-Compliance Trends  The most significant deviations from the Tier Standard found in most sites can be summarized as inconsistent solutions.  A site will have a robust, Fault Tolerant electrical system patterned after a Tier IV solution, but utilize a Tier II mechanical system that cannot be maintained without interrupting computer room operations. This results in an overall Tier II site rating.  The mechanical system fails Concurrent Maintenance because of inadequate coordination between the number and location of isolation valves in the chilled water distribution path.

Non-Compliance Trends Cont..  If more than the redundant number of chillers, towers, or pumps are de-energized for electrical maintenance, computer- room cooling is impacted.  Electrical systems often fail to achieve Tier III or Tier IV criteria due to design choices made in the UPS and the critical power distribution path.  Topologies that include static transfer switches in the critical power path for single-corded IT devices will likely fail both the Fault Tolerance criteria and the Concurrent Maintenance criteria.  Consistent application of standards is necessary to have an integrated solution for a specific data center.

Non-Compliance Trends Cont..  An investment in one segment must be met with a similar investment in each of the other segments if any of the elements in the combined solution are to have the desired effect on IT availability. A well-executed data center master plan or strategy should consistently resolve the entire spectrum of IT and facility requirements.