NAVAL REACTORS PROGRAM TMDE Status

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

COMPANY MAINTENANCE MANUAL
RECORD KEEPING Cooperative Development of Operational
Radiopharmaceutical Production
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
Waitlist Cleanup Update Fiscal Committee May 5, 2014.
EQUIPMENT VALIDATION.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
National Bridge Inspection Standards (NBIS)
Waitlist Process Review Board Meeting April 8, 2014.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Systems Engineering Management
Quality Assurance/Quality Control Policy
Examine Quality Assurance/Quality Control Documentation
Engineering Documentation
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Instructions and forms
Process Engineer’s Role in Project Management Dr Abdullah Malik.
NSWC Corona Detachment Seal Beach Making Sea Power a Reality INFRARED THERMOMETER STANDARDIZATION Greg Hogan 7 May 2009.
Writing Reader-Oriented Informal Reports CHAPTER 13.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
S/W Project Management
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Module 7: Construction Phase
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
DI&C Project & Lead-Plant Experiences Gordon Clefton March 11, 2009.
VALIDATION METHODOLOGY
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
CBER 1 Establishment Submissions Rosia E. Nesbitt, BS, SBB(ASCP), CQA(ASQ) Consumer Safety Officer CBER, OBRR, DBA September 15, 2009.
From Research Prototype to Production
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) x May 2009.
1 THE NAVSEA TMDE PROGRAM CDMD-OA EFFORT Donna Morse NSWC IHD Det Earle 04 November 2003.
Assignment 8 information
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
This file contains the PowerPoint presentation for the significant changes to the JFMM applicable to all Volumes with the exception of the Nuclear Addendum.
Project Life Cycle.
Presented by: Don Lehner NAVSEA TMDE Program Fleet Review May 2009 CNSL Consolidated TMDE Readiness Assessment (CTRA)
Formats ACT 380.
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Obsolescence Impact on Configuration Management
Lecture 6: Writing the Project Documentation Part IV.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Wastewater Treatment Consulting Engineering: P&IDs, Startups & Other Considerations William Marten, P.E., BCEE December 6, 2010 UW-Madison CEE 426 ®
© Michael Crosby and Charles Sacker, 2001 Systematic Software Reviews Software reviews are a “quality improvement process for written material”.
Regulatory Issues in Laboratory Management
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
State of Georgia Release Management Training
Introduction to Codes, Standards, and Regulations Chattanooga State CC.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Standard Design Process Overview
World Health Organization
Software and Systems Integration
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
Systems Implementation,
Instrument Maintenance
CLINICAL INFORMATION SYSTEM
Quality Assurance Documentation
Final Design Authorization
DOE Review of the LCLS Project October 2006
Software Reviews.
Presentation transcript:

NAVAL REACTORS PROGRAM TMDE Status Gregory L. Nelson NAVSEA 08 (202) 781-6177 Gregory.l.nelson1@navy.mil

NAVSEA 08K Responsible for the development, manufacture, installation, testing, operation, and maintenance of: Reactor Plant I&C equipment and systems used to monitor and control the reactor plant. Steam and Electric Plant I&C equipment and systems used to monitor and control the main engines and electric plant.

What are we trying to fix? Background What are we trying to fix? Maintenance personnel have difficulties in identifying meter equivalencies Increasing number of GPETE models called out by 08 procedures are obsolete Test equipment called out in technical manuals may not have the procedures required for calibration Equipment technical manuals lacking test equipment definitions

Fix: Use the NAVSEA 04 process Use SCAT codes to call out TMDE, no need for worker to determine equivalency, just pick any current meter from the SCAT code. NAVSEA 08 will no longer need to track GPETE obsolescence, NAVSEA 04 actively does this in TMDE index. Formal Communications: All of our measurement requirements are now know by NAVSEA 04, including when SPETE is required. This should eliminate surprises at the Cal Lab. CMRS data sheets: All measurement requirements are now documented for future use.

Big Picture Plan Step 1 – Formulate plan and get NRHQ approval Step 2 – Review and update source requirements as required. Step 3 –Determine measure requirements, assign SCAT codes, and incorporate them into component technical manuals (CTM).

Conversion Status –Step 1 Get NRHQ approval for change. The long term plan to convert the NAVSEA 08 process for determining meter equivalency to the NAVSEA 04 process was approved by NAVSEA letter Ser 08K/05-04118, dated 21 December 2005.

Conversion Status – Step 2 Update all source requirement documents The following source document revisions were authorized by NAVSEA 08 on 13 December 2006. TM-1- Preparation of Technical Manuals for Special Purpose Mechanical and Electrical Equipment Provides guidance on how to incorporate SCAT codes into manuals. MIL-DTL-23200- Detail Specification, General Specification for Control and Instrumentation Equipment Removed Portable Test Equipment List 1A E-569368-DID-I- Data Item Description for Equipment Hardware Design Documentation Requires vendor to provide measurement requirements. If required, BPMI completes the CMRS data sheet.

Conversion Status – Step 2 New BPMI Operating Instruction (OI) – EN112 Test, Measurement & Diagnostic Equipment Provides relevant TMDE definitions Identifies how to complete a CMRS form Details the interface with NAVSEA 08 and NAVSEA 04 NAVSEA 0989-031-4000 –Reactor Plant Instrumentation & Control Equipment Maintenance Manual Section G/I 8 - Selection of Equivalent Electrical Meters, Recorders and Oscilloscopes updated to recognize use of SCAT codes.

Conversion Status – Step 3 Schedule Schedules are based by ship class and equipment suit installed (i.e. S8G Type 2, 688 Type 1 ) Based on remaining service life, not all class manuals will be converted. (i.e. CVN65, NR-1, Analog equipment being replaced by Microprocessor equipment)

Conversion Status – Step 3 Conversion Outline: Applicable system engineers completed part 1 of CMRS data sheets based on Component Technical Manual procedures. To aid NAVSEA 04, current model used was also listed. It was stressed NOT to base measurement requirements solely on existing model being used. Completed sheets are provided to NAVSEA 04 by BPMI. BPMI co-ordinates any questions from NAVSEA 04 to the applicable system engineer.

Conversion Status – Step 3 Conversion Outline: Once completed, NAVSEA 04 provided completed CMRS data sheets (SCAT code assignment) to BPMI. SPETE (which may not have been previously identified to NAVSEA 04) is also being assigned a SCAT code to ensure proper support is identified. BPMI updates the component technical manual to use SCAT codes during next routine manual revision. Any measurement that does not meet a 4:1 Test Accuracy Ratio requires NAVSEA 08 approval prior to use.

Conversion Status – Step 3 First conversion (S8G - Type 2) process is in the final stages of CTM revisions. Remaining project schedules are being evaluated. Next project being worked is 688- Type 2.

Future Projects Contracts will be written to require the vendor to provide measurement requirements. BPMI will use this data to complete the CMRS data sheet. CVN78 contracts have been written using the new process. Type 2 equipment contracts for Virginia and Seawolf classes have also been written using the new process.

Summary Significant progress has been made to date for this effort. All parties have been participating in bi-weekly telecons to review status and address any issues. Having completed the first project, all parties are currently looking at lessons learned, and updating processes to make improvements.

Questions?