AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.

Slides:



Advertisements
Similar presentations
Performance Contracting 2008 WASHTO – CMS Meeting April 8, 2008.
Advertisements

Moving transportation into the future Strategic Highway Research Program.
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Course: e-Governance Project Lifecycle Day 1
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
FHWA’s Sustainable Highways Initiative And Self-Evaluation Tool
SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Pavement Research
A Urban Highway Infrastructure: Design For Long, Long Life Michael I. Darter, Ph.D, PE Principle Engineer, ARA, Inc. Director, Pavement Research Institute,
NCHRP 07-21: Asset Management Guidance for Traffic Control Devices, Barriers, and Lighting 2014 ATSIP Annual Meeting Presented by Nancy Lefler Vanasse.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Monica A. Starnes, PhD Source: farm1.static.flickr.com Urban Infrastructure What’s its status? What’s involved in maintaining it?
Safe roads, Reliable journeys, Informed travellers New Technologies for Highway Structures “Vision” Awtar Jandu Structures Design and Management.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
SHRP2 Implementation | July 22, 2014 Implementation Update AASHTO RAC Meeting, July 22, 2014 Debra Elston, Director, Office of Corporate Research, Technology,
AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.
SHRP2 Implementation Update to the Standing Committee on Highways Pam Hutton, AASHTO May 29,
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Progress Report Reliability Focus Area Subcommittee on Systems Operation and Management June 2009.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
CODES, STANDARDS AND GUIDELINES
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Accelerating solutions for highway safety, renewal, reliability, and capacity SHRP 2 Outreach and Implementation AASHTO Technology Implementation Group.
Releasing Your Inner Innovator Kathleen Penney CH2M HILL.
1 SHRP 2 Implementation Outcomes and Products July 28, 2010 Accelerating solutions for highway safety, renewal, reliability, and capacity.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
INVEST (Infrastructure Voluntary Evaluation Sustainability Tool) FHWA’s Sustainable Highways Initiative And Self-Evaluation Tool Constance Hill Galloway.
Implementation Overview Research Advisory Committee July 24, 2012.
Asset Management Strategies: Moving from costs to outcomes Tyrone Toole, ARRB Group Ltd South East Australian Transport Strategy Inc, Ordinary General.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
FHWA Update Butch Wlaschin, P.E. Director, Office of Asset Management AASHTO Highway Subcommittee on Construction 2010 Annual Meeting Burlington, Vermont.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
NCHRP Study (30) Performance Measures for Context Sensitive Solutions – A Guidebook for State DOTs As presented by Sally Oldham at the 2005 Midwest.
Efficiency through technology and collaboration SHRP2 and Every Day Counts Products September 9, 2015 David Otte - KYTC Jason J. Siwula, PE – KYTC.
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
FHWA Update AASHTO Subcommittee on Design July 26, 2010 Columbia, South Carolina Jon Obenberger, Ph.D., P.E. Preconstruction Team Leader Infrastructure.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
TRB SAFETY ACTIVITIES TRB SAFETY ACTIVITIES A BRIEF SUMMARY.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Subcommittee on Maintenance Activity Report October 15, 2013 Carlos Braceras Chair, Subcommittee on Maintenance.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
National Cooperative Highway Research Program (NCHRP)
Transportation Research Board Report Ray Derr.
AASHTO Standing Committee on Research July 26, 2011 Accelerating solutions for highway safety, renewal, reliability, and capacity Update.
Accelerating solutions for highway safety, renewal, reliability, and capacity AASHTO Design Subcommittee Albuquerque, NM July 17, 2008.
FHWA’s Research and Development Programs John McCracken, Chief Science Officer and Research Program Manager, Infrastructure R&D U.S. Federal Highway Administration.
Re-Do It -- Faster, Cheaper, Greener Pavement Renewal Solutions.
Connecticut-Delaware-District of Columbia-Maine Maryland-Massachusetts-New Hampshire-Vermont New Jersey-New York-Pennsylvania-Rhode Island Region 1.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
1 Grant Anticipation Revenue Vehicles (GARVEE) Bond Presented to the California Transportation Commission July 25, 2007.
SHRP2 Capacity Implementation | February 2013 When Research Meets the Road Capacity Focus Area February 4, 2013.
International Outreach Overview TRB Annual Meeting, 2007.
Overview of SCOH Strategic Plan AASHTO Subcommittee on Design 2010 Annual Meeting Rick Land, Vice Chair AASHTO Highway Subcommittee on Design and Chief.
Road Investment Decision Framework
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
NCHRP Research on Transportation Asset Management
Moving transportation into the future
Pam Hutton, PE AASHTO SHRP2 Implementation Manager Ken Jacoby, PE
Status Update AASHTO RAC
Presentation transcript:

AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview

What Questions will be addressed? What is Highway Renewal? Why is it important? What is the SHRP 2 Renewal Program? How can I use the SHRP 2 Products?

What are we facing Heavy Traffic Volumes Concern to maximize the movement of traffic Restrictions on the time and length of traffic lane closures Need to maximize service life of facilities Need to minimize impacts to the community

What is Highway Renewal? The reconstruction or substantial rehabilitation of deteriorating highway infrastructure to new standards of service, while the infrastructure continues to serve the traveling public. Rapid Renewal implies accelerated construction but also includes project delivery, design, and operational & maintenance features that minimize the total project length and produces long lasting facilities

R09. Risk Manual R06. High-Speed NDT* R04. Innovative Bridge Designs R01. Locating Utilities* R02. Geotech Solutions R05. Modular Pavement R07. Performance Specs R16. Railroad-DOT Mitigation Strategies R16. Railroad-DOT Mitigation Strategies R15. Integrating Utility and Transportation Agency Priorities* R23. Using Existing In-place Pavement & Achieving long Life R23. Using Existing In-place Pavement & Achieving long Life R21. Composite Systems Systems R26. Preservation Approaches Approaches R19. Bridges for Service Life of 100 Years* R19. Bridges for Service Life of 100 Years* Rapid Approaches Long-Lived Facilities Minimize Disruption 28 Research Projects - $32 Million R11. Strategic Approaches at Corridor/Network Level R10. Project Management for Large Projects R03. Worker Fatigue Technology Related Project Delivery Related Indicates Multiple Projects *

Prime contractor: Battelle Institute Project Completion: March 31, 2012 R03. Identifying and Reducing Worker, Inspector, and Manager Fatigue in Rapid Renewal Environments Anticipated Outcomes Techniques to reduce worker fatigueTechniques to reduce worker fatigue Strategies to incorporate fatigue reducing practices into rapid renewal projectsStrategies to incorporate fatigue reducing practices into rapid renewal projects Strategies to educate the transportation community and leaders on the importance of mitigating fatigue.Strategies to educate the transportation community and leaders on the importance of mitigating fatigue Phase 1 Phase

R07. Performance Specifications for Rapid Highway Renewal –Guidelines for ranking performance parameters (e.g., time, quality, cost, risk, complexity) based on project type –Specifications for different highway renewal scenarios and guidelines for their implementation –Electronic version of Specifications available for use by practitioners Anticipated Outcomes Phase 2 Phase 3 Phase 4 Phase Prime contractor: Trauner Consulting Services, Inc Project Completion: February 2012

Prime contractor: Golder Associates Inc Project Completion: Fall 2010 R09. Guide for the Process of Managing Risk on Rapid Renewal Contracts Guide for conducting risk management on rapid renewal contractsGuide for conducting risk management on rapid renewal contracts Materials to aid SHAs with the implementation of the Guide, including two test workshopsMaterials to aid SHAs with the implementation of the Guide, including two test workshops Anticipated Outcomes Phase 1

Project R09   Completed Assessment of Guide to Risk Assessment and Allocation for Highway Construction Management for applicability to Rapid Renewal Contracts. Development of components of the risk report that need to be further developed for Rapid Renewal application.   Guide, Training Materials and Workshops Workshop with NCDOT in October nd Workshop May 2010 in Redmond Washington R09. Guide for the Process of Managing Risk on Rapid Renewal Contracts Phase 1

Prime contractor: Iowa State University Project Completion: February 2012 R10. Project Management Strategies for Complex Projects Anticipated Outcomes Tools that transportation agencies can be use to develop innovative and effective project management strategies to accelerate sound decision-making during rapid renewal projects. A guidebook for innovative project managementA guidebook for innovative project management Example Case studies of project management strategies for complex projectsExample Case studies of project management strategies for complex projects Workshop and training packages to support adoption of these management strategies by all stakeholdersWorkshop and training packages to support adoption of these management strategies by all stakeholders Phase 1 Phase 2 Phase

Current Project Management Model Quality CostSchedule Traditional “Iron Triangle” of Project Management

Proposed Project Management Framework Quality (Technical) Context Schedule Cost Financing

SHRP 2 Products – How do they fit R06D

SHRP2 Renewal Solutions

SHRP 2 Renewal The Life Cycle Approach Procurement Design Planning Operations & Maint Construction

Planning Design SHRP 2 Renewal The Life Cycle Approach DOT/Railroad Successful Practices and Model Agreements DOT/Utility Successful Practices Guidelines and tools for: Project ManagementProject Management Risk ManagementRisk Management Corridor and Network Level planning for Renewal ProjectsCorridor and Network Level planning for Renewal Projects DOT Utility Successful Practices Tools and Guidelines for Utility Location and Relocation NDT tools for gathering data for input into Design Design Guidelines and tools for: Long Life PavementsLong Life Pavements Geotechnical SolutionsGeotechnical Solutions Long life BridgesLong life Bridges

SHRP 2 Renewal The Life Cycle Approach DOT Railroad Model Agreements DOT Utility Best Practices Guidelines and tools for: Performance Specifications Project Management Risk Management and Transfer Worker and Manager Fatigue Management Construction Guidelines and tools for: Long Life Pavements Modular Pavements Composite Pavements Using Existing Pavement in place Geotechnical Solutions Long life Bridges Worker Fatigue NDT tools for Construction QA/QC Procurement Construction

SHRP 2 Renewal The Life Cycle Approach NDT tools to assess the ongoing condition of roadways, bridges, and Tunnels Guidelines and tools for: Preservation approaches for High Traffic Volume Roadways Maintenance and preservation of 100 year bridges Operations & Maint.

Construction Quality Assurance Tools Operations & Maint. Construction Nondestructive Testing Tools Evaluation of Field Spectroscopy Devices Real-Time Smoothness Measurements of PCC Pavements Infrared and GPR for Uniformity Measurement of New HMA Layers

What SHRP 2 is doing … Condition Assessment Nondestructive Testing Tools Planning Design Operations & Maint. NDT to Identify Delaminations between HMA Layers NDT to Identity Bridge Deck Deterioration NDT for Tunnel Linings

Long Life Pavements Design guidelines Focusing on tools for the design, construction, and preservation of long life pavements. Construction guidelines New composite pavement systems Using the existing pavement structure in place for use during new pavement construction Modular Pavement Systems Soil Stabilization Guidelines for assesses real-time PCC Pavement Smoothness During Construction Guidelines for pavement presentation on High Traffic Volume Roadways NDT tools for condition assessment Planning DesignConstructionProc.Operations and Maint.

Service Limit State Design Focus on developing new design codes that incorporate a rational approach based on SLS for durability and performance of bridges performance measures that utilize full probability-based service life design criteria Long Life Bridges Recommendations for LRFD Design and LOAD RATING Specs SLS approach, method for re-calibration, toolbox database, examples Implementation plan Planning DesignConstructionProc.Operations and Maint.

Recommendations for LRFD Design Specs Analysis methods Details Innovative systems Focus on Improving existing and prove promising concepts for systems, subsystems, and components that historically limit the service life of bridges Long Life Bridges Recommendations for LRFD CONSTRUCTION Specs Stand-alone guide devoted to Design for Life. PlanningDesign Operations & Maint Const.Proc.

Thank you for listening James Bryant