BRT Vehicle Development: Where Do We Go from Here? Cliff Henke, Parsons Brinckerhoff TRB National BRT Conference, August 2012.

Slides:



Advertisements
Similar presentations
Development of Bus Rapid Transit (BRT) in Africa Experience from Lagos, Accra and Kampala.
Advertisements

Los Angeles Bus Rapid Transit Tour Lessons Learned.
Modern Bus Features: Trends and Future Prospects Cliff Henke Sr. Analyst, BRT and Small Starts PB TR&S, Inc. Modern Bus and new Technologies Seminar Sacramento,
Restoration of Historic Streetcar Services in Downtown Los Angeles APTA A quick overview August 2, 2011.
9/7/2012 MBS UU.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
PASSENGER TRANSPORTATION PROJECTS IN MEXICO ALICIA HERRERA Commercial Specialist for Passenger Transportation U.S. COMMERCIAL SERVICE MEXICO Mexico City/Mexico.
A Practical Approach to Bus Rapid Transit (or is it Road Rapid Transit…?) Cliff Henke NABI USA Sales and Marketing.
INNER CITY INVESTMENT SUMMIT TRANSPORT, INTEGRATED PUBLIC TRANSPORT NETWORK AND TRAFFIC MANAGEMENT Presenter: L N Mangcu SED: Transport and Roads Department.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Land Use Impacts of Bus Rapid Transit: The Boston Silver Line Victoria Perk, Senior Research Associate National Bus Rapid Transit Institute Center for.
Swift BUS RAPID TRANSIT (BRT) ITS Washington November 12, 2008.
BUS RAPID TRANSIT (AS PART OF ENHANCED SERVICE PROVISION) Workshop 2 1.
The Potential BRT in Asia
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
BRT Vehicle Development. New Flyer Overview  Winnipeg, Manitoba since 1930 Three US facilities  Industry-leading market share of 42%  Commercial relationships.
RapidRide Briefing Growing Transit Communities East Corridor Task Force January 31 th, 2012 Ron Posthuma, Assistant Director King County Dept. of Transportation.
Design Considerations for BRT Level Boarding Station Platforms
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
CIVITAS ELAN Open Academy Ljubljana 16 April 2010 Eric N. SchrefflerTom Rye, PhD Transport ConsultantNapier Edinburgh San Diego, California, USAUniversity.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Rapid Transit System Steering Committee Meeting December 4, 2012.
1 Research go bus Impact Study TRB National Transportation Planning Applications Conference Atlantic City, May 2015.
Founded 1989 “Hybrid” transportation provider 150+ Vehicles in Fleet 97% of Miles Driven are “GREEN” Largest Private “GREEN” Fleet in United States. About.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Overview of Vehicle Assist and Automation (VAA)Technologies and Applications Rob Gregg Director, Transit Management & Innovation NBRTI/CUTR/University.
Lead the Way APTA Transit Standards Development “BUS RAPID TRANSIT”
ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems? Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting.
Transportation Planning and Design in Practice
Transit – Our transit services will provide modern, innovative, and viable travel options. Because transit facilities and services are an essential element.
1 Program of Projects Study The Impacts of Regional Transit Investment Forum March 21, 2013 Move LA - "LA's Got Lines"
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
BRT Vehicles: Latest Technologies and Procurement Trends Cliff Henke Sr. Analyst, BRT and Small Starts Parsons Brinckerhoff Americas APTA/TRB BRT Conference,
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
11/08/01 1 SunLine’s Fuel Cell Bus Demonstration Program Presented to the California Transportation Commission June 03.
1/30/03 Page 1 Rescue Muni’s Recommendations for Geary Rapid Transit For PAR 1/30/2003.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
© 2007 Noblis, Inc. BUS RAPID TRANSIT AS A CATALYST FOR LAND USE CHANGE: THE ROUTE 1 CORRIDOR CASE STUDY 11th TRB National Transportation Planning Applications.
CEO, Greater Cleveland Regional Transit Authority
1 Development of a Regional BRT System Proposal Presented to the TPB Access for All Committee April 23, 2009 Michael Eichler and Monica Bansal Transportation.
Moving People The Electric Tbus Group. Better street environment needs - reduced congestion less pollution quicker journey times better service frequency.
New Starts/Small Starts and BRT: An Update APTA Bus Conference Seattle, WA May 5, 2009.
Field Operational Tests of Vehicle Assist and Automation Technologies California-Oregon VAA Team Ching-Yao Chan and Wei-Bin Zhang 5 th National BRT Conference.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Transit Signal Priority (TSP): Deployment Issues and R&D Needs as Identified by Practitioners Hallie Smith Brendon Hemily.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
TRB/APTA 2004 Bus Rapid Transit Conference The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation.
FlexBRT Project Briefing. Background Feasibility Study began in – $750,000 TEA-21 Grant to study an ITS Circulator in North Orange County/South.
Left Lane Mixed-Traffic BRT August 22, 2012 Stefano Viggiano and Jack Gonsalves.
30-Year National Transportation Policy Framework to the Future September 12,
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Transforming Transit in California October 22, 2015 CalACT Fall Conference and Bus Show Rohnert Park, CA Tony Brasil, Chief Heavy Duty Diesel Implementation.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
CEE 970 Colloquium Final Presentation Khalid Aljuhani Veronica Asare-Yeboah Ethan Frost Issam Kayssi Hannah Silber.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
AB 118 Air Quality Improvement Program (AQIP) Proposed 2011 Funding Plan Air Resources Board Meeting July 21, 2011 CALIFORNIA ENVIRONMENTAL PROTECTION.
Transit Technology Hampton Roads Transit. Hampton Roads Transit (HRT) provides public transportation for six cities in the South Hampton Roads region:
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
MODULE 3: PLANNING & DESIGN Lesson 2: Modal Characteristics and Impacts.
Gateway EMX Performance Review
Transantiago July 2005.
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Zero-emission Enabling-technology Transit Users Group
Mass Transit Usage According to IBISWorld, the public transportation industry increased 14.3%, from $63 billion during 2013 to $72 billion for 2017,
D Line Project Overview
Emerging Solutions for the Transit Market
Central Avenue Rapid Transit
Presentation transcript:

BRT Vehicle Development: Where Do We Go from Here? Cliff Henke, Parsons Brinckerhoff TRB National BRT Conference, August 2012

Agenda BRT Working Group Goals and Results Current BRT Vehicles and Trends Current and Future Research Needs Discussion

Explosive Growth In BRT

Vehicles Only One System Component Vehicles Unique vehicle design Capacity Quiet, Clean, Modern Running Ways Transitways Service Plan Wider stop spacing High-frequency service Simple and direct routing Stations & Stops Level boarding ITS & Fare Payment Transit signal priority Off-board fare collection Real-time passenger information

Bogotá, Columbia

Quito, Ecuador

Cambridgeshire, England

Leeds, England

Las Vegas

Station Access

BRT “Lite”: Swift, Everett WA

RapidRide, Seattle

BRT Spectrum BRT – “Lite” Eugene EmXOrange Line - LA “Hybrid” BRT Swift BRT - Everett Full BRT $1–3 million per mile $10–27 million per mile$3–10 million per mile Vehicles are greater share of project cost when cost is lower

The European bus design challenge

Las Vegas Has Led Challenge to U.S. Builders Driven by image and BRT needs

Seeding the BRT Concept Weststart/Calstart Advanced transportation technologies consortium Dedicated to technology development, analysis and implementation Sponsored the first international design competition for BRT vehicles Attracted academic and private entries from around the world Designated "program manager" to the FTA for its BRT Vehicle Action Plan ( )

Developed vehicle portion of the FTA's "Characteristics of Bus Rapid Transit" (CBRT) document BRT Vehicles Working Group Connected U.S. vehicle manufacturers, transit agencies, component suppliers and regulators Goal to speed up commercialization of BRT vehicle technology Developed/disseminated clean transportation technologies information for BRT industry conferences Launched/facilitated "Hybrid Bus Working Group" to help lower the cost and speed deployment Most popular propulsion option for BRT vehicles Seeding the BRT Concept Weststart/Calstart

Seeding the BRT Concept Industry BRT Vehicle Working Group Launched in September 2004 by FTA officials, grantees & manufacturers Focused initially on BRT Vehicle design & availability issues Created BRT Vehicle Action Plan outlining 16 strategies for development and commercialization Group reviewed work in progress and declared victory for several strategies at July 2006 meeting Recommended that a new BRT visionary group was necessary to handle next stage of the BRT industry

Common BRTV Myths Vehicles – “smoke-belching toaster on wheels” Sleek, inviting, “Jetsons” Vehicles too expensive BRT $900K; Streetcar $2.8M; LRV $3.8M Must choose LRT or BRT Convertibility/shared use in Seattle, in development in Ottawa, York Not zero emissions like LRT Hybrid electric, or 100-percent electric “e-BRT” ultrafast recharge at stations with super-capacitor If this is so important why not the trolleybus option…? Only applicable for medium-sized cities Spokane, Eugene …… Los Angeles, Chicago Boston….

U.S. Manufacturers Have Responded Driven by environmental and BRT needs

Unique Vehicle 63-foot articulated bus Hybrid-electric propulsion Doors on left and right sides Low floor Bikes on board Easier access for people in wheelchairs

North American Vehicles Now with Doors on Both Sides NABI 60-BRT hybrid demo New Flyer 60DELFBRT hybrid for Cleveland Health Line

Passenger Information At Stations LA: Metro Rapid Bus On Board Paris: Val de Marne Busway

Other Info Technologies Also Have Income Streams On-Board Wi-Fi (L.A., Miami, various European cities) On-Board and Station Advertising with Next-Bus Info “Transit TV”

Hybrid will surpass CNG for most BRT Propulsion 28% of total will be hybrids One-third to be CNG (traditional drivetrain)

Docking/Narrow Lane Guidance Systems Rail/GrooveKassel CurbGuide Wheel Mechanical

Docking/Narrow Lane Guidance Systems FROGPATH MagneticOptical Siemens

California and Oregon Demonstrations USDOT Vehicle Assist & Automation Local Partners: Caltrans, PATH, AC Transit, Lane Transit District (LTD) Applications: Lateral guidance on a three-mile section of HOV lane and through a toll booth on SR 92 – AC Transit Lateral guidance and precision docking on Franklin EmX BRT route – LTD Technologies (individually and in combination): –Magnetic Marker Sensing –Differential Global Positing System (DGPS) / Inertial Navigation System (INS) Revenue Service Operations: Spring 2012 (Scheduled)

Level Boarding

BRT Vehicle Demand Growth 20% to be footers 450 per year, 66% for new services Source: FTA 2004 Vehicle Demand Survey of 48 cities’ expected BRT bus deliveries over the next 10 years (CALSTART, 2004) ft. buses ft. buses Articulated buses Projected U.S. Market for BRT Vehicles

Pace of Technology’s Change The 1990s: Multiple floor heights, lengths Several fuels (and aftertreatments) Multiple structures Advanced electronics (multiplexing, AVL, voice annunciators, AVM, etc.) The 2000s: Growing use of hybrids Real-time video surveillance Data logging and advanced diagnostics Wi-Fi BRT features I/O Controls’ multiplexing system

Result: A “Build to Order” Market Each order custom Pilot bus Wiring scheme different Major components different (even allowed by SBPGs) Time to market now 18 months—or less Big reason why OEMs are financially fragile  “And now you want what?”

Important Vehicle Research Issues Resurrect Working Group? Buy America enforcement Altoona testing: new tests, waivers etc. Local Preferences (e.g., State Dealer Reqs.) Vehicle weight: axle loading, cost Standards incentives/mandates Styling? Ride Quality? Advance Propulsion? Guidance?

Conclusions Remember: BRT Is A System of Elements Most Important Vehicle-Related System Performance Impacts: Capacity Doors/Seat Layout Route Speed (Vehicle and TSP) Route Structure/Convenience Fleet Size = Frequency Vehicle Reliability Largest System Design Impacts Branding-Related Livery and Interiors Vehicle and Station Styling Information/Ease of Use What areas need further federal investment or policy changes?

Thanks