1 CCSDS Security Working Group Fall 2008 Meeting 15-16 October 2008 Berlin Germany.

Slides:



Advertisements
Similar presentations
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Advertisements

7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
1 Security Policy Framework & CCSDS Common Criteria Use CCSDS Security WG Fall 2005 Atlanta, GA USA Howard Weiss NASA/JPL/SPARTA
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
SIS_DTN 1 SIS-DTN Status: LTP, BP, SSI Arch October 2013 San Antonio Fall 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Fall 2005 Meeting Atlanta GA September 16, 2004 Howard Weiss NASA/JPL/SPARTA.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October, 2009 ESTEC, The Netherlands Takahiro Yamada, JAXA/ISAS.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
1 Authentication Algorithm Document Discussions CCSDS Security Working Group Fall 2007 Meeting 3-5 October 2007 ESA/ESOC, Darmstadt Germany (Hotel am Bruchsee,
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
1 SecWG New Business Discussions CCSDS CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA November 2004.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2012 Clevaland, Ohio, U.S.A. Takahiro Yamada, JAXA/ISAS.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS march 2008 meeting – Crystal City 1 TC/TM space links security SEA / SLS cross area meeting.
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
1 Information Security Planning Guide CCSDS Security WG Spring 2005 Athens, GR Howard Weiss NASA/JPL/SPARTA April 2005.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 Document Status CCSDS Security Working Group March 2008.
1 CCSDS Security Working Group January 25 Telecon.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
11 Identity Management Spacecraft ID Security CCSDS Security WG Fall 2005 Atlanta, GA USA Howard Weiss NASA/JPL/SPARTA September.
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Security WG: Report of the Spring 2006 Meeting Rome, Italy June 16, 2006 Howard Weiss NASA/JPL/SPARTA
Security WG: Status Briefing Cleveland, Ohio USA 15 October, 2012 Howard Weiss NASA/JPL/SPARTA skype: hsweiss.
The CCSDS Security WG is chartered to:
Security WG: Status Briefing
Security WG: Report of the Fall 2005 Meeting
CCSDS Systems Engineering Area: Security Working Group
Security WG: Report of the Spring 2016 Meeting
Space Communication Cross Support Architecture WG
Security WG: Report of the Fall 2013 Meeting
Presentation transcript:

1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany

2 AGENDA 13 October 2008 – 08:00 – 09:00: CCSDS Plenary – 09:00 – 12:00: Systems Engineering Area (SEA) Plenary 14 October 2008 (09:00 – 12:00) – Space Data Link Layer Security BOF 15 October 2008 (09:00 – 17:00) – Welcome, opening remarks, logistics, agenda bashing, introduction for new attendees + Review of document progress and results of Spring 2008 meeting – Document Status (encryption, authentication, key management, mission planners) – “Big Picture” discussions (Black) – : Lunch – Security Architecture Document Discussions (Black) – Mission Planner’s Guide (Biggerstaff) 16 October 2008 (09:00 – 17:00) – Key Management (Fischer) – Application Layer Security (Pajevski/Weiss) – : Lunch – Other discussions (from last meeting): » “Color” of books (magenta vs. blue) » Encryption & authentication application-specific parameters » Common Criteria for mission security profiles (knit docs together) » Agency security implementations (approach, requirements, security services) – Meeting with DTN BOF (tentative) 17 October 2008 – : SEA Wrap-up Plenary

3 Status Washington (March 2008) Progress: » Discussed SecWG Security Architecture comments. Most resolved. Discussed possibility of adding link layer security. BSNC will revise for next meeting. » Discussed authentication document and added GMAC (should) and CMAC (may). » Met with SM&C – gave thumbs up to their security architecture. » Discussed CFDP and application layer security in general. » Reviewed Key Management Green and Magenta docs » Reviewed Mission Planners Security Guide draft » Reviewed the status of SCPS-SP (and its flaw) – decided not to repair and resurrect it. » Discussed and tabled the use of the Common Criteria for mission security profiles » Held joint mtg w/SLS to being a Space Link Layer Security BOF Current Progress: » Held interim telecon June 4, 2008 » Security sections written for both Encryption and Authentication docs. Reversed RSA DSA for dig signature. Both docs forwarded to Secretariat for editing Encryption doc out for “pre-review” review » Revised version of Security Architecture distributed for WG comments