5 August 2003 9:40 a.m.SIST Final Presentation1 The Development of a Pavement Management System at Fermilab Through the Implementation of Micro PAVER 5.1.

Slides:



Advertisements
Similar presentations
A Look to the Future By: Pat Hughes, Dave Holt, and Ron Bumann.
Advertisements

Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
TXDOT Asset Maintenance
A Data-Driven Method for Prioritizing Projects in Central Idaho Prepared for the 2012 ITE Western District Meeting Santa Barbara, California Prepared by.
“Practical Pavement Management with Micro PAVER”
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Complete & Connected: Tools for Planning a Balanced Transportation System Technical Workshop.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
FDOT Aviation Pavement Inspection Training Module 2 – Pavement Fundamentals – Overview Florida Department of Transportation Statewide Pavement Management.
Introduction Surface Engineering & Aggregates and Pavement Management 1.
Georgia Pavement Management System Development 1997 – 1998: l A quality-based on-site pavement condition evaluation system l A KBS for diagnosing the causes.
BRI Presentation 6 June This research study is undertaken by the Cooperative Research Centre for Construction Innovation (CRC CI). Research partners:
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Idaho Transportation Department Karen A. Strauss, P.E. Pavement Management Engineer.
Simple.. convenient.. inexpensive Prepared by Mohammed ALMannaa & Abdullah Asharef & Abdulrhman min Mahmoud.
Managing Non-Traditional Asset Classes Managing Non-Traditional Asset Classes SHA’s Perspective Maryland Department of Transportation State Highway Administration.
Federal Aviation Administration Presented to: 2011 Eastern Region Airports Conference By:Al Larkin, Project Manager for Non- Destructive Pavement Testing.
California Department of Transportation District 11 - Internship Angela Inciong- SDSU Civil Engineer Tamina Akram- SDSU Civil Engineer.
CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering
Harris County (Fig. 3) was chosen as the area of study for this project. The three phases described in the methodology above was used for this area. Six.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
PRIORITIZATION.
Mandy Chu Office Chief Highway System Information and Performance Division of Research, Innovation and System Information Introduction to HPMS Highway.
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
Federal Aviation Administration Presented to: Pennsylvania State University 2010 Airports Conference By:Al Larkin, Project Manager for Non- Destructive.
Naval Organization Chapter 6 BMR
Department of Public Works Bureau of Street Services Cynthia M. Ruiz President Department of Public Works.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
WVDOT GTI SECTION Status Update for Miss Utility.
Technical Recommendations for Highways No 12 TRH 12
1 Ministry of Transport, Public Works and Water Management.
M aintenance Efficiency & Cost Effectiveness Initiative Robert M. Peda, P.E. Director, Bureau of Maintenance & Operations, PennDOT MQA Peer Exchange October.
USTC&TBA La Jolla, CA December, 8, Track Construction & Reconstruction: Asphalt Overlay Issues vs. Removal & Replacement.
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
FHWA - O FFICE OF A SSET M ANAGEMENT October 14, 2009 Managing our Pavements FHWA Initiatives U.S. Department of Transportation Federal Highway Administration.
Presented to: 2012 FAA Airport Pavement Working Group Meeting By: Al Larkin, Qingge Jia, FAA Airport Technology R & D, and Jason Tarby, SRA Date: April.
Presented to: By: Date: Federal Aviation Administration Environmental Best Practices Air Quality Issues 2010 Hershey Conference Maria Stanco, AEA Environmental.
Maintenance & Rehabilitation Strategies Lecture 5.
1 Doc # USAMC LOGSA--Supporting Warfighters Globally U.S. Army MaterielCommand US AMC LOGSA Parts Management Plan Builder 29 April 2008.
DoD Region 4 Pollution Prevention Project Task 8: Database Development and EMS Integration Phil Barnes University of South Carolina.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
Report to the Legislature Required by Senate Bill 2202 (due January 1, 2002) Board Briefing June 13, 2001 Agenda Item 5 Attachment 1.
Effect of Load and Environmental Factors on the Performance of Airports Pavements in the Kingdom of Saudi Arabia Presented by: Hazim M Abdulwahid,MSC,MBA.
Re-Do It -- Faster, Cheaper, Greener Pavement Renewal Solutions.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Road Information System / Road Data Bank 10 April 2013 Lars Bergman M. Sc. In Civil Engineering Long Term Planning Swedish Transport Administration.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Finnish Road Enterprise HDM-4 TUTORIAL FOR THE 5 TH INTERNATIONAL CONFERENCE ON MANAGING PAVEMENTS Case Study: Network Level Strategy for Paved Roads in.
Russian Engineers Training March 2011
FUZZY APPROACH FOR ESTABLISHING THE PAVEMENT CONDITION QUALITY INDEX Gwo-Hshiung Tzeng Institute of Technology Management and Institute of Traffic and.
Road Pavements and New Approaches! IPWEA CONFRENCE David Moloney Director Infrastructure - Southern Grampians Shire.
Road Investment Decision Framework
Roadway Pavement Management Plan
AN-Najah National University AN-Najah National University
Service Life of Hot Mix Asphalt using PERMIT
PUBLIC WORKS DEPARTMENT
Parts Management Plan Builder 26 July 07
Presenters: Sumon Roy1 and Badrul Ahsan1
Pavement condition index calculation
Consequences of Delayed Maintenance of Pavement Networks
Challenges and Innovations in Municipal Asset Management Presented by: Bhupesh Sakalley, Project Manager Zimran Khokhar, Project Manager February 7th,
NRRA Pavement Workshop 2019
Presentation transcript:

5 August :40 a.m.SIST Final Presentation1 The Development of a Pavement Management System at Fermilab Through the Implementation of Micro PAVER 5.1 Lakelle Pritchett Southern University and A&M College Civil and Environmental Engineering Department FESS IMG Supervisor: Randy Ortgiesen

5 August :40 a.m.SIST Final Presentations2 Fess Mission Statement  To establish and maintain a dependable base from which physics and other Fermilab programs can be accomplished without interruption

5 August :40 a.m.SIST Final Presentations3 Objective  To create a Pavement Management System, consisting of empirically based pavement assessments and distress identifications, leading to a more objectified future plan for road maintenance and repair at Fermilab

5 August :40 a.m.SIST Final Presentations4 Specific Objective of a PMS  To determine the extent and severity of pavement deterioration  To determine the causes of deterioration  Find plausible rehabilitation alternatives and techniques  Estimate the life cycle cost for each rehabilitation alternative or technique

5 August :40 a.m.SIST Final Presentations5 Overview of Micro PAVER  Developed by the Army Corps of Engineers in Champaign, IL, to help the DOD  “Pavements should be managed, not simply maintained”  First version released in 1981  Development was supported by the US Air Force, US Army, US Navy, Federal Aviation Administration, and the Federal Highway Administration  Uses Pavement Condition Index (PCI)  Integrates with GIS

5 August :40 a.m.SIST Final Presentations6 Freeze Thaw Cycle  Pavement shrinks in cold climate  Cracks expand  Thawing ice adds to crack expansion  Rubber filling is used to help increase pavement life expectancy

5 August :40 a.m.SIST Final Presentations7 Data Collection  Inventory data collection -construction history -pavement composition -calculated area configurations Network, branch, section and sample unit divisions Distress Identification

5 August :40 a.m.SIST Final Presentations8 Sample Inventory Data

5 August :40 a.m.SIST Final Presentations9 Traffic Counting & Pavement Use  When compared with previous Fermilab traffic counts done by Chuck Federowicz, it was found that the weekly average inbound traffic count of Batavia Road has decreased by nine percent from 1995 to the present

5 August :40 a.m.SIST Final Presentations10 Sample Average Weekly Traffic Counts

5 August :40 a.m.SIST Final Presentations11 Data Analysis

5 August :40 a.m.SIST Final Presentations12 Data Analysis  Graphic representation of Pavement the PCI produced by Micro PAVER 5.1, Pavement Condition vs. Time  Maintaining a pavement above the critical PCI is more cost efficient than that below

5 August :40 a.m.SIST Final Presentations13 Conclusions  With the needed inventory data collected and distress identification completed, a Pavement Management System for Fermilab is soon to be developed with the allowance of additional time

5 August :40 a.m.SIST Final Presentations14 Recommendations  Contact persons affiliated with a newly implemented program before use  Establish and maintain a relationship with programmer and others experienced in working in the related field throughout research

5 August :40 a.m.SIST Final Presentations15 Acknowledgements  FESS  Fire Department  Roads and Grounds  Security  Carpenter’s Shop  Fermilab Taxi Company  DuPage County DOT