Town of Westerly Pavement Improvement Plan 2009.  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.

Slides:



Advertisements
Similar presentations
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Advertisements

City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
Titusville to Edgewater Bike Loop PD&E Study
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
Public Works Greg Chock Operations Manager Harlan Hanson Road & Bridge Engineer
Genesee Road and more Genesee County Road Commission January 29, 2009.
Town of Southbury Department of Public Works 2014.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Future of Ringgold County Sealcoat Road System Open Forum Meetings 2011 Credit for assistance in this presentation to Brad Skinner, Page County Engineer,
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
Utility Extension Project
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Maryland Transportation Authority (MDTA)
Bridge Engineering Section Bridge Rehabilitation.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 1, 2013.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
June 2012 Washington State Transportation Improvement Board Small City Funding Programs.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
CITY OF FLAGSTAFF – PROP. 406 ROAD REPAIR AND STREET SAFETY 1.
Public Works. Strategic Plan Presentation Department Organization Strategic Goals relating to Public Works Department Issues.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1% Sales Tax Commission Board Meeting June 3, 2015.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
San Francisco Fire Department Facilities Update.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
RebuildIndy Indianapolis Department of Public Works March 2011.
Eastham Water System Board of Selectmen Meeting April 25, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
A Data-Driven Strategy to Improve the Quality
2016 Mill and Overlay Project
The Gainesville Area Chamber Infrastructure Investment Initiative
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Boulder Junction Town Road Improvement Project
Town of Clayton 2016 Pavement Condition Survey
Infrastructure Investment Needs
Street Improvement Plan
Kerr Tar Project Update – June 2016
Pavement Performance Measures In Georgia
District Construction Season
Construction Management & Engineering
Pavement Improvement Plan 2009
Commissioners Presentation
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Town of Westerly Pavement Improvement Plan 2009

 Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT projects.  Assess available funding.  Select repairs to fit budget framework.  Prepare bid documents and advertise.

Current Pavement Condition

Pavement Management Program  Initial inventory and condition survey prepared by Beta Group in  All roads are rated with 100 best.  Database maintained and kept up to date by Engineering Department.  Software automatically predicts pavement condition based on model of deterioration over time.

RSR (Road Surface Rating) Network RSR = 69

Network Backlog (2009) Repair Method Length (mi) Estimated Cost % Reclamation3.92$1,372, Mill & Overlay 9.52$2,415, Level & Overlay 55.24$6,321, Crack Seal 41.29$227, Defer31.67$ Total141.65$10,337,

Network Backlog By Repair

RIDOT Planned Projects

RIDOT Projects

 Route 91 1R, Contract 1 - High Street (Route 3) to Larry Hirsch Lane  Route 91 1R, Contract 2 – Larry Hirsch Lane to Church St. (Route 216)  Shore Rd. Resurfacing – Ocean View Hwy. to Post Rd.  Weekapaug Bridge  Elm St. & Beach St. (Main St. to Clark St.)  Railroad Ave., Dixon St., & West St.

Available Town Funds  General Fund FY $450,000  Water Fund FY $750,000 (Transmission Main Project)  General Fund FY2010- $200,000 Total $1,400,000

Proposed Town Projects

Town Projects Total = 7.75 Miles

Westerly 2009 Projects General Fund ($650,000 budget)  Crack Sealing – $50,000 (Various Roads)  Level & Overlay - $110,000 (Pound Rd., Hiscox Rd. & Wampanoag Ave.)  Mill & Overlay - $370,000 (Bellevue Ave., John St., Narragansett Ave., Raymond St., & Ward Ave.) Total - $530,000 est.

Westerly 2009 Projects Water Fund ($750,000 budget)  Mill & Overlay - $460,000 est. ( Terrapat Dr., Perkins Ave., Pond St., Pierce St., Industrial Dr., Narragansett Ave., & Summer St.)

2009 Road Improvements Predicted RSR = 71

RI – LEAP Funds (Local Equity Aid Program)  $358,000 (Federal) + $150,000 (State) = $508,000 Total  Cross St. Pavement & Sidewalks = $525,000 est. $525,000 est.

Additional Planned Projects  Old Hopkinton Road  Canal St./White Rock Road Rehabilitation  Bay Street Drainage/Pavement Restoration  Bradford Streetscape Project  Misquamicut Drainage Extension  Chip Sealing Program