Airfield Marking Handbook

Slides:



Advertisements
Similar presentations
SAFETY MANAGEMENT WORKSHOP
Advertisements

Retroreflectivity: Raising the Nighttime Brightness of Traffic Signs and Markings Office of Technology Applications Peter Hatzi.
Background Presenters Work done in preparation for WHS changes
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Hosted By: Atlanta, Ga. National Aerospace FOD Prevention, Inc. 25th National Aerospace FOD Prevention Conference 27 – 29 July 2004 Co-hosted By: Delta.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
CONDOMS A series of presentations developed by TGPSH/GTZ and PSI-TANZANIA.
Donna Speidel, President, Sightline Airport Marking Consultants Planning and Design for Airfield Markings March 3, th Annual Airports Conference.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Public Works Department Debarment Hearing Concrete Restoration Services Ltd. Bid Opportunity
Recent Lighting and Marking Design Challenges/Trends
Donna Speidel, President, Sightline Airport Marking Consultants Chuck Carneal, President, Safety Coatings, Inc. Ron Boeger, V.P. Sales, Potters Industries,
Spray Finishing Operations/Spray Booth March 9, 2009.
Contractor Management and ISO 14001:2004
ACCIDENT INVESTIGATION
Applying Coatings over Flash Rust in a Marine Environment
 Single Component Products TT-P-1952E - Waterborne traffic paint TT-P-1952E - Waterborne traffic paint A-A-2886A - Solvent traffic paint A-A-2886A - Solvent.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
The Airtex Educational Partnership (AEP) was started several years ago by Airtex Automotive Division as a way to merge corporate automotive expertise with.
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Copyright  Business & Legal Reports, Inc. Accident Investigation Blue Ridge Safety Association Safety Training Presentations.
Good Laboratory Practices (GLPs)
Presented by: Peter Emmons,
Hazard Identification
Introduction to Equipment
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Procedures FSKN.
FAR PART 45 – Government Property
FDA Regulatory review in Minutes: What Product Development Executives Need-to-Know. Specifically, frequent causes of recalls and related areas that investigators.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Federal Force Account Utilizing Sponsor Resources Georgia Airports Association – Spring Workshop March 13, 2014 Presented By Katie Eleam Aviation Project.
Accident Investigation. Accident Investigation Goals Preparing the investigation team Conducting the investigation Quiz.
Self Inspection Program
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Presented to: By: Date: Federal Aviation Administration Airworthiness Preventive Maintenance R1.
Presented by: Tony Serdenes, Greenman-Pedersen
5S Workplace Audit Category Item Level Sort Store Shine Standardize
Moving pilots, motorists and pedestrians in the right direction…safely. Airfield Pavement Markings P R E F O R M E D T H E R M O P L A S T I C.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Jeffrey L. Rapol Qiang Wang Jeffrey L. Rapol, Civil Engineer Federal Aviation Administration Airport Engineering Division, AAS Independence Ave,
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
Harold L. Von Quintus, P.E., ARA Jagannath Mallela, ARA
© Michael Crosby and Charles Sacker, 2001 Systematic Software Reviews Software reviews are a “quality improvement process for written material”.
Presented to: 2010 FAA Worldwide Technology Transfer Conference By: James Zargan and Al Larkin Date: April 2010 Federal Aviation Administration FAA Pavement.
Chapter 6 Requirements for a Maintenance Program.
BUILDING CONSTRUCTION ( ) GOVERNMENT ENGINEERING COLLEGE,DAHOD CIVIL ENGINEERING DEPARTMENT PRESENTED BY: PATEL TEJASH S. ( ) GUIDE BY:
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Good Laboratory Practice
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
Storage, Labeling, Controlled Medications Guidance Training CFR § (b)(2)(3)(d)(e) F431.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Coating Defects and Failures
Software Quality Control and Quality Assurance: Introduction
ISO/IEC
14 Refrigerant Recovery, Recycling, and Recharging.
NON DESTRUCTIVE TESTING
(Additional materials)
Flooding Walkdown Guidance
SAFE WORK INSTRUCTIONS
Chapter 12: Project Procurement Management
SAFE WORK INSTRUCTIONS
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
Directed Change Constructive Change
Presentation transcript:

Airfield Marking Handbook IPRF/FAA Project No. 01-G-002-05-1 Primary Investigator Donna Speidel, President – Sightline, LC

Sightline, LC (Airport Marking Consultants) is the author of the Airfield Marking Handbook. The project was administered by the Innovative Pavement Research Foundation under a Cooperative Research Agreement with the Federal Aviation Administration

NAVAIDS “broken”? Signs If a sign is unlit or broken, it gets replaced. Lights If a taxiway light is malfunctioning, it gets fixed. Markings But how do you know when the markings are “broken”?

Marking Standards Describes WHAT the markings are, FAA AC 150/5340-1J USAF ETL 04-2 USN UFGS 32 17 24.00 10 USACE TM 5-823-4 Describes WHAT the markings are, WHEN you’re supposed to use them and WHERE they belong.

Runway Incursions Markings Airport Marking Importance Guide Clarify Define Lack of clear, distinct markings Runway Incursions

Visibility of Markings Contrast of markings (black border) “The contrast of markings on light colored pavements can be increased by outlining them with a black border at least 6-inches in width.” AC 150/5340-1H, dated 8/31/99 (FAA) 6

Visibility of Markings Use of glass beads: “Markings that cannot be seen by pilots and others operating on marked surfaces are useless.” AC 150/5340-1H, dated 8/31/99 (FAA)

Visibility of Markings Markings should be as visible during darkness as they are in the daylight. 8

Visibility of Markings Quality Application All the efforts to increase visibility with black borders, glass beads and new designs are futile if markings are not applied well.

Objectives of the handbook What can be done to increase the life-cycle of airfield markings? 2. What constitutes a “quality” marking? 3. When is a marking functional and when is it “unsafe”? 4. What is a good application v. a poor one?

Roundtable Discussion 30 industry participants met in Kansas City on June 15, 2006: airport engineering consultants, FAA staff, airport management, maintenance personnel, striping contractors, material manufacturers, and military airport managers

Top FIVE Industry Issues Application Procedures Surface Preparation Pavement Marking Removal Material Selection Project Specifications

Handbook Organization Project Specifications Material Selection Surface Preparation Pavement Marking Removal Application Procedures 13

Project Specifications Address the standard specifications and guidance literature, emphasizing the need to customize specifications to fit the project. When is maintenance necessary? Develop measured and detailed techniques for quality assurance. Create a tool kit for inspection of marking application.

Marking Maintenance Who’s watching? Markings degrade slowly due to: traffic (worn marking) sunlight (UV deterioration) rain (paint absorbs water, expands and contracts) snowplows, sweepers contaminants (oils, rust deposits, algae, rubber) loss of retro-reflectivity

Marking Maintenance Prevent degradation due to: Poor Application Practices 16

Worn Markings - over 50% of paint is gone.

Faded Markings

Nighttime visibility is poor to bad:

Obscured Markings

Project Specifications Evaluate actual site conditions, specify remediation. Evaluate condition of pavement under markings. Evaluate surface preparation methods and quantities. Determine amount, type, and degree of marking removal. Select materials appropriate to the airport environment. Specify materials arrive in sealed containers. Verify material types and quantities.

Material Selection Observe the different marking materials already approved for use on airports, noting the advantages and disadvantages of each. Develop criteria for deciding the best materials suited for a project based on pavement surfaces, existing markings, airport weather conditions, and airport operations. Review current material testing procedures.

Material Selection coatings. Materials are selected based on the airport environment. Select materials suited for the pavement or existing coatings. Glass beads are selected appropriate to the type and thickness of coating specified as well as airport needs. Temporary marking materials are selected for “removability”. Materials are sampled directly from equipment guns.

Surface Preparation Create an effective definition of surface preparation. Develop ways of determining when surface preparation is necessary, if not always. What equipment is best suited to do the work?

Surface Preparation Definition: Surface preparation is the cleaning of anything that would prevent the bond of the new coating to either the pavement or existing coatings.

“Seventy-five percent of all material failures are attributable to deficient surface preparation and/or application. The unit cost of repair is normally two and one half times higher than the original material application unit cost and frequently results in lower quality due to adverse application conditions. This analysis does not include the potentially staggering cost of down-time and loss of facility production.” S. G. Pinney & Associates

Surface Preparation Loose and poorly bonded paint. Perform surface preparation before painting to remove: Loose and poorly bonded paint. Curing compound on new concrete. Algae. Rust discoloration. Oily substances including jet blast residue. Heavy rubber build up. Waterblasting is best method for surface preparation. Sweep, blow with air, or rinse with water after preparation. Specify surface preparation as a separate bid item.

Surface Preparation Adequate surface preparation will: Prolong the life of the markings. Save valuable airport funds. Prevent paint build-up/pavement damage. Reduce FOD.

Pavement Marking Removal Define paint removal. Define different types of removal encountered. Define the degrees of removal required. Describe type(s) of equipment and effectiveness on varying pavement conditions, thickness of and types of existing coatings. Define pavement damage.

Pavement Marking Removal Definition: Pavement marking removal is the mechanical eradication of markings from the pavement to a specified degree. There are several reasons airports remove markings, and each situation requires different degrees (or percentages) of eradication.

Pavement Marking Removal Degree of removal is defined in specifications. Markings are removed, not “blacked” out or obscured. Equipment is specified based on conditions. Test strips indicate capability of equipment and operator. Shotblasting is effective on non-grooved surfaces. Waterblasting is effective on most surfaces. The scar is thoroughly cleaned before applying markings. Waste water and debris are contained, characterized, and properly disposed of.

Pavement Marking Removal All marking removal methods will leave a scar. Handbook definition: Scarring is removal of the texture with some exposed aggregate.

Pavement Marking Removal PRE-EXISTING DAMAGE

Pavement Marking Removal Pavement damage can be subjective. Handbook definition: Damage occurs when more than 25 percent of the depth of the nominal-size aggregate diameter is uniformly exposed across the pavement, and some of the aggregates are loose.

Application Procedures Evaluate equipment commonly used. How is equipment calibration performed to ensure correct material coverage? Evaluate different airport conditions (i.e., traffic, weather, etc.) and their effect on markings. Consider types of pavement surfaces. Evaluate installation of both temporary and permanent markings. 6. Observe clean up/housekeeping procedures.

Application Procedures Adequate surface preparation is performed. Layout establishes guidelines for applicators. Pointer systems are used for accurate placement of markings. Markings are applied from 6 to 36 inches in a uniform film thickness in a single pass. Two or more colors are applied simultaneously. Glass beads are dispensed automatically with the coating. Pressurized bead systems provide best distribution. Hand machines are equipped with automatic bead dispensers.

Application Procedures Windscreens are used to prevent material displacement. A primer coat is applied to uncoated asphalt. Calibration of material guns is performed. Close attention is paid to application rates. Uniform, specified film thickness across marking. Test lines are applied in appropriate areas or on tar paper. Documentation of marking operations is maintained to record location, quantity, weather conditions, etc. Equipment is well maintained.

Tools to Evaluate Markings (Tool Kit) Wet Film Gauge Bead Gun Calibration Bucket Magnifying Lens Color Chips and/or Colorimeter LTL Reflectometer Flashlight Duct tape Metal coupons

Summary It’s a marking system: Surface Preparation (waterblasting) Careful Inspection Quality Binders Quality Glass Beads Quality Application

Visual Inspection (daytime)

But a nighttime visual inspection reveals uneven reflectivity

Acknowledgments: Research Team Members: Charles D. Carneal, President, Safety Coatings, Inc. H. Gene Hawkins, Ph.D., Hawkins Engineering Stephen M. Quilty, A.A.E., Bowling Green State Univ. Cynthia Randazzo, Scientist, Rohm and Haas Company Donald Schall, Distinguished Scientist, Rohm and Haas Co. Michael W. Speidel, Marketing Manager, Sightline, LC Fred C. Peil, V.P., FOL Tape, LLC

Acknowledgments: FAA Cooperative Agreement Manager: Dr. Satish Agrawal IPRF Cooperative Agreement Program Manager: Jim Lafrenz 45

Acknowledgments: IPRF Technical Panel Members: Michael Ates, AFCESA (Air Force Civil Engineering Support Agency) Gilbert Rushton, MDSHA (Maryland State Highway Administration) Jeffrey Rapol, FAA (Federal Aviation Administration) Holly Cyrus, FAA (Federal Aviation Administration) Ron Boeger, Flex-O-Lite, Affiliate of PQ Corporation Mark Jansen, P.E., The LPA Group, Inc. 46

Acknowledgments: The staff of the many airports visited. The participants of the Roundtable Discussion. The staff of the airport marking contractors. The industry experts, including material and equipment manufacturers. 47