Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working with New Jersey Turnpike Authority Highway and Building Projects November 19, 2009
HIGHWAYS / BUILDINGS - DESIGN CONSTRUCTION AWARDS YEAR CONTRACT AWARDS 2008 $ 122 Million (Actual) 2009 $ 235 Million (Actual) 2010 $ 338 Million (Projected) 2011 $ 649 Million (Projected)
2009 – Contracts Awarded Highways / Buildings – Design Section NUMBER CONTRACTS CONTRACT DESCRIPTION PAVEMENT RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM IMPROVEMENTS ROADWAY IMPROVEMENTS ROADWAY RECONSTRUCTION INTERCHANGE IMPROVEMENTS CONSTRUCTION AWARDED $ 35M $ 15M $ 32M $ 22M $ 128M $ 3M TOTALS = $ 235M
2010 –Contracts to be Awarded Highways / Buildings – Design Section AWARD SCHEDULE 1 ST QTR 1 ST & 4 TH QTR 1 ST & 3 RD QTR 3 RD & 4 TH QTR 4 TH QTR 3 RD & 4 TH QTR NUMBER CONTRACTS CONTRACT DESCRIPTION PAVEMENT RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM IMPROVEMENTS ROADWAY IMPROVEMENTS ENVIRONMENTAL MITIGATION UTILITY RELOCATION ROADWAY RECONSTRUCTION INTERCHANGE IMPROVEMENTS CONSTRUCTION ESTIMATE $ 20M $ 29M $ 49M $ 23M $ 7M $ 30M $ 120M $ 60M TOTALS = $ 338M
2011 –Contracts to be Awarded Highways / Buildings – Design Section AWARD SCHEDULE 1 ST QTR 2 nd & 3 rd QTR 1 ST & 2 nd QTR 2 nd & 3 rd QTR NUMBER CONTRACTS CONTRACT DESCRIPTION PAVEMENT RESTORATION FACILITY IMPROVEMENTS SIGN SYSTEM IMPROVEMENTS ROADWAY IMPROVEMENTS ROADWAY RECONSTRUCTION INTERCHANGE IMPROVEMENTS CONSTRUCTION ESTIMATE $ 20M $ 62M $ 81M $ 21M $ 315M $ 150M TOTALS = $ 649M
Pavement Restoration $25M in Annual Resurfacing Contracts (3 – 5 Contracts Ranging from $5M - $8M) Turnpike Resurfacing Milepost 0 to 74 (South) Milepost 74 to 122 (North) GSP Pavement Restoration MP 0 to MP 75 (Southern) MP 75 to MP 146 (Central) MP 127 to MP 172 (Northern)
Facility Improvements Contracts to be Awarded in 2010 / 2011 P – NJSP Vehicle Maintenance Facility P B – PNC Bank Arts Center Amphitheater Improve. A500.TBD – Authority Maint. Bldg. Improve. (5 Contracts) T500.TBD – Turnpike Toll Bldg. Improve. (2 - 4 Contracts) P500.TBD – Parkway Toll Area Improve. (3 Contracts)
Sign System Improvements Contracts to be Awarded in 2010 / 2011 T – Turnpike Sign Panel Replacement – 0 to 48.7 A A – Install VMS on Turnpike and Parkway A – Advance Sign Structure Fab. (2 Contracts) A (BC&D) – Install VMS/VSLS on TPK (3 Contracts) A (E&F) – Install VMS on GSP (2 Contracts) A600.TBD – Guide Sign Improve on TPK & GSP (North) T600.TBD – Guide Sign Improve on TPK (South) P600.TBD – Guide Sign Improve on GSP (South)
Roadway Improvements Contracts to be Awarded in 2010 / 2011 P – Parkway Guide Rail Improvements – 0 to 126 P – Advance Clearing for GSP Widening – 48 to 63 P – GSP – Grading & Drainage Improve – P200.TBD – Install Raised Pavement Markers on GSP P – GSP Drainage Improvements – 0 to 140 T200.TBD – Turnpike Median Barrier Repairs – 0 to 122 T200.TBD – TPK Local Pier & Abutment Protection Impr. P200.TBD – GSP Local Pier & Abutment Protection Impr.
Environmental Mitigation Contracts to be Awarded in 2010 / 2011 P – Great Bay Boulevard Bulkhead Improvements T700.TBD – Piles Creek Wetland Mitigation
Utility Relocation Contracts to be Awarded in 2010 / 2011 P900.TBD – Relocation of Overhead Utilities – MP 63 to 80 P900.TBD – Force Main Relocation – MP 10 to 12 P900.TBD – Advance Utility Relocation – MP 48 to 63
Roadway Reconstruction Contracts to be Awarded in 2010 / 2011 P – Widen & Rehab Patcong Creek Bridge – MP 31 P200.TBD – Grade Separation Improve at Int. 9, 10 & 11 P – Widening of the GSP – MP 58 to 63 P – Widening of the GSP – MP 52.5 to 58 P – Widening of the GSP – MP 48 to 52.5 P200.TBD – GSP Shoulder Reconstruction – MP P200.TBD – GSP Shoulder Reconstruction – MP P200.TBD – GSP Shoulder Reconstruction – MP
Interchange Improvements Contracts to be Awarded in 2010 / 2011 P – Improvements to GSP Interchanges 141 & 150 T – Turnpike Interchange 10 Improvements P300.TBD – Operational & Access Improvements to Int. 145 T – Turnpike Interchange 9 Improvements P300.TBD – Improvements to GSP Int. 153 & 154/155P T300.TBD – Turnpike Int. 15W & Int. 16W Improvements P300.TBD – Improvements at GSP Interchange 157 T – Tremley Point Connector Road P300.TBD – GSP Interchange 88 Improvements T300.TBD – Turnpike Interchange 8A Improvements P300.TBD – GSP Interchange 91 Improvements