Accelerating solutions for highway safety, renewal, reliability, and capacity Pennsylvania Asphalt Pavement Association.

Slides:



Advertisements
Similar presentations
William Lohr, P.E Federal Highway Administration Minnesota Division Office.
Advertisements

Moving transportation into the future Strategic Highway Research Program.
Tennessee Department of Transportation ITS Mobility and Operations Summit Performance Measures November 18 – 19, 2009.
Louisiana Safe Routes To School Program
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
FHWA’s Sustainable Highways Initiative And Self-Evaluation Tool
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Monica A. Starnes, PhD Source: farm1.static.flickr.com Urban Infrastructure What’s its status? What’s involved in maintaining it?
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER NDE Research Ongoing Projects and Response Based Load Rating The Office of Research, Development, and Technology.
Traffic Incident Management (TIM) Mark Meints NDOR Emergency Program Specialist.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
SHRP2 Implementation | July 22, 2014 Implementation Update AASHTO RAC Meeting, July 22, 2014 Debra Elston, Director, Office of Corporate Research, Technology,
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
SHRP2 Implementation Update to the Standing Committee on Highways Pam Hutton, AASHTO May 29,
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
1 State of Good Repair Research Vincent Valdes Associate Administrator for Research, Demonstration, and Innovation July 9, 2009.
Accelerating solutions for highway safety, renewal, reliability, and capacity SHRP 2 Outreach and Implementation AASHTO Technology Implementation Group.
Releasing Your Inner Innovator Kathleen Penney CH2M HILL.
1 SHRP 2 Implementation Outcomes and Products July 28, 2010 Accelerating solutions for highway safety, renewal, reliability, and capacity.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Overview of the Work Zone Safety and Mobility Rule Module 1.
AASHTO Research Advisory Committee July 24, 2012 Accelerating solutions for highway safety, renewal, reliability, and capacity Innovation in Lean Times.
Implementation Overview Research Advisory Committee July 24, 2012.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
AASHTO TIG Ananth Prasad Chief Engineer, Florida DOT.
TRB SAFETY ACTIVITIES TRB SAFETY ACTIVITIES A BRIEF SUMMARY.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Weather Information for Surface Transportation: AASHTO Activities June 13, 2006 WIST Workshop Presented by Leland D. Smithson AASHTO SICOP Coordinator.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
Caltrans Research Highlights Presented by The California Department of Transportation Tab 63.
AASHTO Standing Committee on Research July 26, 2011 Accelerating solutions for highway safety, renewal, reliability, and capacity Update.
Accelerating solutions for highway safety, renewal, reliability, and capacity AASHTO Design Subcommittee Albuquerque, NM July 17, 2008.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Ann M. Brach AASHTO Research Advisory Committee Annual Meeting July 22, 2014 Accelerating solutions for highway safety, renewal, reliability, and capacity.
Re-Do It -- Faster, Cheaper, Greener Pavement Renewal Solutions.
Connecticut-Delaware-District of Columbia-Maine Maryland-Massachusetts-New Hampshire-Vermont New Jersey-New York-Pennsylvania-Rhode Island Region 1.
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
AASHTO Strategic Highway Safety Plan Development & Implementation Status 2004 Traffic Records Forum David M. Smith Senior Transportation Specialist, Office.
SHRP2 Capacity Implementation | February 2013 When Research Meets the Road Capacity Focus Area February 4, 2013.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
International Outreach Overview TRB Annual Meeting, 2007.
Office of Major Project Development (OMPD) Overview November 2015.
1 NTOC Talking Operations – Road Weather Management – September 30, 2008 PERFORMANCE MEASURES FOR ROAD WEATHER MANAGEMENT Roemer Alfelor FHWA Road Weather.
SHRP2 – Tools for the road ahead Implementation Overview
Improving Safety in the NASTO States by Using SHRP2 Solutions
New Jersey-New York-Pennsylvania-Rhode Island
Moving transportation into the future
Pam Hutton, PE AASHTO SHRP2 Implementation Manager Ken Jacoby, PE
Innovation in Lean Times
Overcoming Barriers to Implement Research Projects
Pavement Working Group
Accelerating solutions for highway safety and performance
FHWA TSMO / SHRP2 Research
Status Update AASHTO RAC
Presentation transcript:

Accelerating solutions for highway safety, renewal, reliability, and capacity Pennsylvania Asphalt Pavement Association

What Is SHRP 2? – $232 million, federally funded research program to address critical transportation challenges Making highways safer Fixing deteriorating infrastructure Reducing congestion – Managed by TRB of the National Academies – Collaborative effort of TRB, AASHTO, and FHWA – Research phase: ; Implementation: – Aims to advance innovative ways to plan, renew, operate, and improve safety on the Nation's highways

Four Focus Areas Safety : fielding the largest-ever naturalistic driving study to reduce crashes and save lives through understanding driver behavior Renewal : making rapid, innovative construction possible for “ordinary” projects Reliability : Providing management and technical tools to reduce congestion through operations Capacity : Systematizing collaborative decision making to achieve better, faster project decisions

Renewal: Strategic Rationale Facilities are aging, users depend on them: –Renew infrastructure quickly –Have minimal impact on users –Produce long-lasting facilities We know how to do this—on special projects What keeps us from doing it consistently across the system? –Lack of standard methods, specs –Lack of reliable performance/usage information –Human/institutional challenges SHRP 2 seeks to overcome these obstacles

Renewal Topics Bridges Project Management Utilities and Railroads Nondestructive Testing Pavements

These products help agencies to address the need to design and construct long-lasting, durable infrastructure that requires minimal traffic disruption. B RIDGES R04. I NNOVATIVE B RIDGE D ESIGNS FOR R APID R ENEWAL (2012) R19-A. B RIDGES FOR S ERVICE L IFE BEYOND 100 Y EARS : I NNOVATIVE S YSTEMS, S UBSYSTEMS, AND C OMPONENTS (2014) R19-B. B RIDGES FOR S ERVICE L IFE BEYOND 100 Y EARS : S ERVICE L IMIT S TATE D ESIGN (2015) R06-A: NDT TO IDENTIFY CONCRETE BRIDGE DECKS DETERIORATION (2013) R02: G EOTECHNICAL S OLUTIONS (2014)

These projects help address infrastructure projects from a holistic perspective that emphasizes delivery and performance of the highway facility. P ROJECT D ELIVERY R03. I DENTIFYING AND R EDUCING W ORKER, I NSPECTOR, AND M ANAGER F ATIGUE IN R APID R ENEWAL E NVIRONMENTS R07. P ERFORMANCE S PECIFICATIONS FOR R APID H IGHWAY R ENEWAL (2013) R09. R ISK M ANUAL FOR R APID R ENEWAL C ONTRACTS (2013) R10. P ROJECT M ANAGEMENT S TRATEGIES FOR C OMPLEX P ROJECTS (2013) R11. S TRATEGIC A PPROACHES AT THE C ORRIDOR AND N ETWORK L EVEL TO M INIMIZE D ISRUPTION (2015)

F ATIGUE R ISK M ANAGEMENT G UIDE (R03) Product: Rapid renewal workforce fatigue risk factor definitions, and fatigue risk management practices and techniques; A toolkit for managing workforce fatigue in the rapid renewal environment; Model training and outreach materials to assist in future implementatio n. Benefits: Tools to manage workforce fatigue and increase worker safety will help transportation agencies reduce the risks of accelerated schedules, longer day shifts, night and weekend work, and work conducted in protected zones adjacent to traffic that are often associated with rapid renewal projects. Status: Research Completed. Fatigue risk management plans and all supporting materials will be available fall 2013

These projects address means to more effectively reduce delays due conflicts with with utilities and railroads. U TILITIES AND R AILROADS R01A. T ECHNOLOGIES TO S UPPORT S TORAGE, R ETRIEVAL, AND U SE OF 3D U TILITY L OCATION D ATA (2014) R01B&C. U TILITY L OCATING T ECHNOLOGIES R15. I DENTIFICATION OF U TILITY C ONFLICTS AND S OLUTIONS (2013) R16. S TRATEGIES FOR I MPROVING THE P ROJECT A GREEMENT P ROCESS B ETWEEN P UBLIC A GENCIES AND R AILROADS (2013)

These projects advance technologies that simplify, accelerate, and improve inspection of existing facilities and new construction to support rapid renewal projects. N ON -D ESTRUCTIVE T ESTING R06-A: NDT TO IDENTIFY CONCRETE BRIDGE DECKS DETERIORATION (2013) R06-B: E VALUATING A PPLICATIONS OF F IELD S PECTROSCOPY D EVICES TO F INGERPRINT C OMMONLY U SED C ONSTRUCTION M ATERIALS (2015) R06-C: U SING I NFRARED AND H IGH S PEED G ROUND P ENETRATING R ADAR FOR U NIFORMITY MEASUREMENT ON N EW HMA L AYERS (2014) R06-D: NDT TO IDENTIFY D ELIMITATIONS BETWEEN HMA L AYERS (2015) R06-E: R EAL -T IME SMOOTHNESS MEASUREMENTS OF PCC P AVEMENTS D URING C ONSTRUCTIONS (2015) R06-F: D EVELOPMENT OF C ONTINUOUS D EFLECTION S ENSORS R06-G: NDT FOR T UNNELS (2014)

R APID T ECHNOLOGY FOR Q UALITY C ONTROL D ATA ON A SPHALT P AVEMENTS (R06-C) Product: Model Specifications for Using Rapid Infrared and Radar Technologies for Quality Control of Asphalt Pavements During Construction. Recommendations for equipment and testing protocols and a basic training video that introduces how to use the technologies and interpret the data. Benefits: Accelerates project delivery by increasing the speed of inspection and quality assurance testing on asphalt pavements during construction. Detecting defect areas during construction allows the paving crew to adjust in real time, which avoids costly corrections and more reliably produces long-lasting pavements. Status: Research Complete. The final report, training material, video, and specifications for testing procedures are available. The model specifications are being piloted by two Transportation agencies. Revised model specifications available late 2013.

R APID T ECHNOLOGY FOR Q UALITY C ONTROL D ATA ON A SPHALT P AVEMENTS (R06-C) Continuous feedback during construction allows for process control Cold zones typically become low density 11.5% Voids 5.8% Voids 12.2% Voids 6.8% Voids Real-time thermal profiling with commercialized Pave-IR system. Core results with thermal profile

ADVANCED METHODS TO IDENTIFY PAVEMENT DELAMINATION (R06-D) Product: Guidelines for using two new technologies to detect subsurface delamination in asphalt pavement. Both ground- penetrating radar and impact echo and seismic analysis of surface waves accelerate data acquisition. Benefits: Accelerates assessment of pavement distress used for the selection of rehabilitation strategies. These NDT techniques improve the ability to detect a key cause of pavement failure faster, with less manual analysis, and less risk to drivers and technicians. Status: Research Complete. The final report and guidelines are available. Two prototypes are in development and pilot-test sites will be identified. Guidelines for using the technologies are being refined. The refined materials will be available late 2013.

ADVANCED METHODS TO IDENTIFY PAVEMENT DELAMINATION (R06-D) Research Final Report (5 volumes) Upgrades in currently commercially-available and prototype NDT equipment/software Generic testing procedures

These products provide the basis for broader use of pavement types and techniques that reduce traffic disruption, speed completion of renewal projects, and produce long lasting roadways. P AVEMENTS R05: M ODULAR P AVEMENT S OLUTIONS (2014) R21: C OMPOSITE P AVEMENT S YSTEMS (2014) R23: U SING THE E XISTING P AVEMENT AND A CHIEVING L ONG L IFE (2013) R26: P RESERVATION A PPROACHES FOR HIGH T RAFFIC V OLUME R OADWAYS (2013)

R05: M ODULAR P AVEMENT S OLUTIONS Guidelines and tools for the selection, design, construction, installation, and maintenance of precast concrete pavement systems, and tools for cost/ benefit assessment in situations where the technology may apply. Tools include model specifications based on AASHTO’s TIG precast concrete pavement spec. Status: Research Completed. The guidelines and model specifications are currently available. R21: C OMPOSITE P AVEMENT S YSTEMS Guidelines and tools for the design, construction of “new” composite pavement systems: HMA/PCC and the 2-layer wet-on-wet PCC Composite Pavement. Practical recommendations for construction specifications and techniques, life-cycle costing, material selection and quality management are provided with this product. P AVEMENTS Status: Research Completed. The guidelines and model specifications are currently available. Some of the Models have already been incorporated into the current version Pavement ME Design

P RECAST C ONCRETE P AVEMENTS (R05) Benefits: Accelerates project delivery and improves design and construction efficiency of modular pavement systems; minimizes the impact on traffic by reducing lane close durations. Provides another option for low clearance underpasses and has been proven to be a good alternative to high early strength concrete pavement patch repairs.

C OMPOSITE P AVEMENT S YSTEMS (R21) Benefits: Encourages long-lasting, easily renewed, and sustainable pavements. Ability to use high volumes of recycled materials and locally available aggregates in the bottom layer of PCC pavement. Can be a cost effective alternative in areas with long aggregate haul times. Products: Guidelines and tools for the design, construction of “new” composite pavement systems: HMA/PCC and the 2-layer wet-on-wet PCC Composite Pavement. Practical recommendations for construction specifications and techniques, life-cycle costing, material selection and quality management are provided with this product.

R ENEWAL S TRATEGIES FOR D ESIGN AND C ONSTRUCTION OF L ONG L IFE P AVEMENTS (R23) B ENEFIT /V ALUE : Streamlines the design and construction procedures for renewal projects using that use part of the existing pavement structural in the new design.

Products Decision Matrix (with design tables-long life) Pavement Assessment Manual Best Practices (for long life performance) –Rigid –Flexible Guide Specifications Traffic Considerations Life Cycle Cost Analysis Emerging Technologies Interactive Program (platform for Knowledge base) R ENEWAL S TRATEGIES FOR D ESIGN AND C ONSTRUCTION OF L ONG L IFE P AVEMENTS (R23)

Interactive web-based resource contains all product information: R ENEWAL S TRATEGIES FOR D ESIGN AND C ONSTRUCTION OF L ONG L IFE P AVEMENTS (R23)

SHRP2’s solution (R26) provides: Step-by-step process to identify the best repair techniques based on specific pavement needs and conditions Method for weighing various technical inputs and selecting the most appropriate treatments Decision matrices Summaries of treatment options and examples 22 P RESERVATION A PPROACHES FOR H IGH T RAFFIC V OLUME R OADWAYS (R26)

Research to Implementation 23 Research responds to known transportation challenges A research product emerges and is refined through pilots and other activities Potential implementation explored through knowledge transfer Partner agencies select, prioritize, and prepare product for implementation Product is marketed to users and integrated into standard practice Research DevelopmentImplementation

1.Implementation is the routine use of a SHRP2 product 2.Carried out by State DOTs and other implementing agencies 3.Managed by FHWA and AASHTO in cooperation with TRB 4.FHWA has developed an Implementation Assistance Program 24

Current Status The research phase is wrapping up with many research reports and products available for use TRB still has development activities underway, including pilot testing, for a number of products A total of 65 products are being produced FHWA and AASHTO are making products available for implementation over a four-year period Financial and technical assistance are being provided by FHWA and AASHTO to facilitate implementation

SHRP2 on the Web –SHRP2 product fact sheets and collateral –Focus on AASHTO members TRB Comprehensive info about research phase FHWA –Information clearinghouse for SHRP2 implementation phase –Links to other SHRP2 websites 26