Herriman City has experienced tremendous growth over the last several years Many new subdivisions and associated roads have been constructed in the City
The rapid growth and construction activity has exposed our roads to traffic and heavy loads, which in some cases accelerated the deterioration of our roads
Currently Herriman City has as an inventory of 17,821,898 SF of asphalt road. A well implemented preventive Road Maintenance plan is needed to take care of our roads and keep them operative and functional.
Preventive Maintenance not reactive maintenance Deterioration = Life Very Cost Effective Applicable for all pavements Right treatment, right pavement, right time Importance of life-cycle cost analysis
“Every $1 spent in keeping a good road good precludes spending $6-$14 to rebuild one that has deteriorated.” Now Later
Crack seal Patching Fog seal Chip seal Slurry surfacing Overlay Full Depth reclamation
Primary Road Maintenance Treatments: Crack seal/ Patching/Slurry seal Mill and Overlay Full depth reclamation (FDR) Dirt Road pavement
Road Maintenance Plan
Recommended 6 Year Slurry Seal Maintenance Plan
Recommended 6 Year Overlay Maintenance Plan
Recommended 6 Year Full Depth Reclamation
Recommended 6 Year Dirt Road Paving Plan
Road Maintenance Plan
Areas in red are to be sawcut and repaired
Note size of cracks Cracks sealed 2009 New cracks formed 2010
Cracks sealed 2009 New cracks formed 2010
Cracks sealed 2009 New cracks formed 2010
Cost of repairs this year in Copper Creek Cost of repairs in 2007: $25,000 Cost of repairs in same area 2010:$230,000 New roads need a timely schedule of regular maintenance 5-7 years after Initial Construction
Cracks sealed 2009New cracks formed 2010
Cracks sealed last year New cracks formed this year
Claim Staker Way and Midas Gold Road Cost of repairs in 2007: $15,000 Cost of repairs in same area 2010:$175,300 New roads need a timely schedule of regular maintenance 5-7 years after initial Construction
5 yrs 10 yrs 15 yrs 20 yrs 15 yrs 20 yrs 10 yrs
Annual Budget Requirements for Current Roadways (18.3 Million Square feet): Pavement Management Option ▪ $853,000 No Pavement Management Option ▪ $9.4 Million