LID and Stormwater Technical Resource Center Update County Road Administration Board November 3, 2010 1.

Slides:



Advertisements
Similar presentations
Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Advertisements

Clean Water Its Everybodys Business. From a distance we might get the impression that our planet has an unlimited supply of clean water available to use.
Green Building Ordinance Transportation and Environment Committee
Discussion Topics Brief history of structural stormwater management The Low Impact Development (LID) alternative to ponds, ponds, ponds… LID for Hydromodification.
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Low Impact Development They took all the trees and put them in a tree museum and they charged all the people a dollar and a half just to see 'em. Don't.
Spokane River Forum Conference March 26,  About 1/3 of City  130 outfalls.
UW LID Workshop Permeable Pavement Modeling June 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Simplified Sizing Tool for LID Practices in western Washington Alice Lancaster, PE Herrera Environmental Consultants.
Watershed Management & Low Impact Development for Litchfield Board of Realtors Green Committee DEP / Watershed, Lakes and NPS Programs MaryAnn Nusom Haverstock.
Using Rainwater to Grow Livable Communities Sustainable Stormwater Best Management Practices (BMPs)
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Department of Conservation and Recreation 1 Proposed Stormwater Management Requirements for Virginia Rappahannock River Basin Commission June 24, 2009.
Stormwater Management
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Planning Commission meeting 5/22/2012.  Project Schedule  Planning Commission’s Role  Review Chapters 1 – 3 of Draft SMP  Focus is on understanding.
Western Washington Hydrology Model Version 3
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Low Impact Development Guidebook Kent Gylfe
Sustainable Development: Practical Solutions to Real World Problems Fishkill, NY November 7, 2012 Low Impact Development and Rainwater Harvesting Solutions.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
How do Wetlands Factor into New Infiltration Policies?
Integrating LID Into the Development Planning Process.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Jason R. Vogel, Ph.D., P.E. Stormwater Specialist Biosystem and Agricultural Engineering Oklahoma State University.
Water Management and Conservation in the Landscape (outline) The Water Cycle Stormwater: runoff, conveyance and treatment with urban infrastructure, discharge.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Background and Overview Stormwater NPDES Compliance For New Developments.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Rainwater is Good: Designing Stormwater Management to Work for YOU A presentation by Jennifer Fais STC and the Upper Susquehanna Coalition April 8, 2004.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
PSGB Ecosystem Conference The Effectiveness of LIDs in Reducing Stormwater Runoff February 9, 2009 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Urban Water Research Todd Rasmussen Associate Professor of Hydrology The University of Georgia, Athens and Pending Director, Urban Water Research Institute.
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Clark County’s Municipal Stormwater Permit Stormwater Manual and Code Update National Pollutant Discharge Elimination System & State Waste Discharge General.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Stormwater Runoff: 101 Natural groundcover absorbs, slows and filters rainwater; pavement and rooftops do not. Heavier and faster runoff leads to heavier.
Stormwater and GIS Eastern Panhandle WV GIS User Group Meeting September 2, 2015 Jennifer Klages - Sebastian Donner -
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Draft Generic Environmental Impact Statement for Adoption of Stream Corridor Management Regulations for the Lake George Park.
Land Use. How We Use Land Urbanization of areas is becoming a problem. Thousands of acres of open space just in Pennsylvania have been lost to development.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
City of Dunnellon Comprehensive Plan Amendment  Future Land Use Element  Conservation Element  Concurrency Management System.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Module 5: Solutions – Sustainable Urban Communities MPP 655: Policy Making for Sustainable Urban Communities 1MPP Module 5.
Infill Master Plan October 23, 2007 Infill Master Plan October 23, 2007 Board of County Commissioners Discussion Item.
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
Liana Prudencio and Sarah E. Null
Stormwater Control Transfer Program Overview January 31, 2018
Alternative Compliance for New Developments
Presentation transcript:

LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,

LID Permitting History  Current Phase 1 Permit (Allow LID)  PCHB Decision (Mandate LID)  Advisory Committees (Technical Implementation)  Draft Outline for Permit 2

LID GOALS To prevent changes in the natural hydrology of streams, lakes, wetlands, and other natural aquatic systems from land development; and to reduce the hydrologic changes on aquatic systems caused by existing development.

LID DEFINITION Low-impact development is a stormwater and land use management strategy that that strives to mimic pre-disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on-site natural features, site planning, rainwater harvest, rainwater re-use, and distributed stormwater management practices that are integrated into a project design. LID strategies can be applied to new development, redevelopment, urban retrofits, and infrastructure improvements. LID strategies can have a site, subdivision, or basin scale focus.

What Now?  Phase I and WW Phase II Permits  Ecology has defined LID Principles LID Principles LID Techniques LID Techniques 5

Proposed Permit Approach  Permits would use the PCHB language and performance standard  Jurisdictions would have flexibility in the specifics of code revisions.  Deadlines for implementation would align with Growth Management Act (GMA) update deadlines 6

Three Pieces to LID in Permit  Basin Scale Approach  Site/Subdivision LID Development Principles LID Development Principles Performance Criteria Performance Criteria 7

Basin Scale  Actions that significantly increase the Urban Growth Area (UGA) or to significantly increase densities Conduct an analysis of impacts to water quality and hydrology Conduct an analysis of impacts to water quality and hydrology The analysis would be subject to a public review process The analysis would be subject to a public review process Requirement based on specific actions or triggers Requirement based on specific actions or triggers 8

Suggested Basin Scale Triggers  Significant Expansion of UGA Proposed as 80 acres or >5% of area of the existing UGA, whichever is smaller. Proposed as 80 acres or >5% of area of the existing UGA, whichever is smaller. The requirement would apply to cumulative increases in area. The requirement would apply to cumulative increases in area. 9

Suggested Basin Scale Triggers  Significant Increase in Density Proposed as any increase in density for an area of 80 acres or, for cities, >5% of the area of the incorporated city, whichever is smaller. Proposed as any increase in density for an area of 80 acres or, for cities, >5% of the area of the incorporated city, whichever is smaller. The requirement would apply to cumulative areas of increases in density. The requirement would apply to cumulative areas of increases in density. 10

Required Analysis  An assessment of the predicted water quality impacts  Pollution prevention measures and other mitigation alternatives.  The public interest benefits of the action, including social, environmental, and economic benefits.  Conduct the analysis and include it in the public process either as part of SEPA or under the public process for the GMA action.  The action could not allow a violation of water quality standards.  11

LID Development Principles  Refers to LID measures authorized through a variety of local development codes beyond the stormwater code. Examples include provisions for: clustering and impervious surface limits (zoning and subdivision code) clustering and impervious surface limits (zoning and subdivision code) narrower roads (road standards) narrower roads (road standards) native vegetation retention (clearing and grading and subdivision code) native vegetation retention (clearing and grading and subdivision code) reduced lot setbacks (zoning and utilities code) reduced lot setbacks (zoning and utilities code) 12

Performance Standards  Flow control is the primary standard for LID facilities Continue to meet existing standard (50% of the 2-year flow through 100% 50-year flow) Continue to meet existing standard (50% of the 2-year flow through 100% 50-year flow) Control from 8% of the 2-year flow through 50% of the 2-year flow Control from 8% of the 2-year flow through 50% of the 2-year flow  Different criteria for within UGA 13

Flow Duration Curve 14

Mandatory Techniques  On-site SW Management BMP’s of M.R. #5  Use site- appropriate development principles to retain native vegetation and minimize impervious surfaces to the extent feasible as required by local code. 15

Mandatory Techniques  Infiltration below pavement (permeable pavement or impermeable pavement with collection and redistribution below) for new or replaced impervious surfaces, e.g., public and private walks, driveways, patios, sports courts, roads, parking lots 16

Mandatory Techniques  Rain Gardens meeting a minimum size designation and through which all runoff and overflow from permeable pavement storage basins must pass. Rain gardens should comprise at least 7.5% of residential developments and 4% of commercial developments. 17

Mandatory Techniques  For commercial buildings (not single family residences), green roofs or an impervious roof with runoff routed below the permeable pavement parking lot (cost analysis to claim unreasonableness of green roof if latter option not used 18

Stormwater Technical Resource Center  HB 2222  RCW  Grants for TAPE and Tech Center  Advisory Committee 19

Stormwater Technical Resource Center  Web Page elopment-services/puyallups-stormwater- management-program/washington- stormwater-center/ elopment-services/puyallups-stormwater- management-program/washington- stormwater-center/ elopment-services/puyallups-stormwater- management-program/washington- stormwater-center/ 

TAPE Schedule  Existing technologies are being reviewed  Open application process within 1 month  Revise existing TAPE Manual by April 2011  Board of External Reviewers (BER) in place 21

QUESTIONS? 22

Comments and Questions Doug Howie (360) Wash. Dept. of Ecology P.O. Box Olympia, WA