East Bay Bus Rapid Transit Project Description August 11, 2011.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Los Angeles Bus Rapid Transit Tour Lessons Learned.
Division Avenue Bus Rapid Transit Project August 2012.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Dudley Square Complete Streets Design Project Public Meeting #1 October 22, :00pm – 8:00pm Boys & Girls Club of Boston Yawkey Club of Roxbury.
9/7/2012 MBS UU.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.
Lecture 6 Bus Rapid Transit, design elements and operational issues Dr. Muhammad Adnan.
Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Euclid Corridor Design TRB BRT Workshop July 21, 2008.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
2 $ Million investment in three transportation projects prioritizing the movement of people to and through the Loop Washington/Wabash CTA Station.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Euclid Corridor Transportation Project BRT Workshop July 22, 2008 HealthLine Operations.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Bus Stop Design Guidelines - In Support of Effective Service Planning
Use of a Charrette in BRT Station Area Planning Thomas W. Williams, PE AECOM / Sr. Project Manager Grand Rapids, Michigan QUALITY TRANSIT ― NOW.
Design Considerations for BRT Level Boarding Station Platforms
Freedom to work Freedom to text Freedom to read.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
1 Corridor Cities Transitway Presented to: Amberfield HOA January 15, 2015.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems? Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting.
Interchange Design Wes Mayberry Transportation Engineering Intern
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
1 Governance Council Meeting Fiscal Year 2004 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY GATEWAY CITIES SERVICE SECTOR December 18, 2003.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Brio Rapid Transit System Update on Stations and Timetables July 10, 2012.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
2012 CITY OF MIDDLETON SATISFACTION SURVEY WORKING DRAFT - PROPOSAL.
The Transit “T” Craig Lamothe UPA Transit Project Manager City of Minneapolis City of Lakes Innovative Choices for Congestion Relief.
Evaluating Remotely Sensed Images For Use In Inventorying Roadway Infrastructure Features N C R S T INFRASTRUCTURE.
APPENDIX-A NORTH DAKOTA STATEWIDE SERVICE PACKAGES and INFORMATION FLOWS.
May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
Project Overview RTC Sahara Express Bus Rapid Transit (BRT) Project 12-mile BRT corridor Hualapai Way to Boulder Highway Side-running dedicated transit.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
Left Lane Mixed-Traffic BRT August 22, 2012 Stefano Viggiano and Jack Gonsalves.
Expressway Driving Entering, lane changing, and exiting.
DICK RUDDELL EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Complete Streets Training
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Greater Cleveland Regional Transit Authority Cleveland HealthLine Bus Rapid Transit Kenneth G. Sislak, Associate Vice President; Manager of Transit/Rail.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
WORKPLACE SAFETY PROGRAM AGENDA SECURITY PROTOCOLS AND EVACUATIONS WORKPLACE SAFETY AUDITS MAINTENANCE INJURY EXPERIENCE MANDATORY PROTECTIVE EQUIPMENT.
Colfax Corridor Connections (Denver) & 15/15L Transit Priority Study (RTD) RTD Board - Planning & Development Committee August 6, 2013.
Hesperian Boulevard Corridor Improvement Project San Lorenzo
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Construction Management & Inspection
TRAFFIC LAWS RR – CH 4.
D Line TAC Meeting #1: Rapid Bus Improvements on 7th & 8th Streets Downtown Business Block Club July 26, 2017 Katie Roth, Bus Rapid Transit.
Bus Rapid Transit Study
City of Alexandria Virginia Transportation and Environmental Services
Presentation transcript:

East Bay Bus Rapid Transit Project Description August 11, 2011

Agenda RFP Requirements and Schedule—Sharon Dennis DBE/SLBE Information—Lynda McBroom and Pat Davis BRT Project Description and Schedule—Jim Cunradi Q & A—All Next Steps—Sharon Dennis and Tina Spencer

Roadway & Pavement 13 lane miles median bus lanes (11-12 feet wide) 38 lane miles mixed flow, turn lanes and curbside parking lanes Mostly ACC “Cold Recycle in Place” for bus lanes and traffic lanes. Some areas may require pavement overlay or other rehabilitation of the pavement PCC in station areas (adjacent to boarding platforms and acceleration and deceleration zones) Landscaping Off street parking lots

Systems Including ITS Barrier Free Fare Collection Fare vending machines Fare validation machines Security CCTVs Emergency Phones Traffic Signals & Transit Priority New traffic signals New pedestrian signals Modified traffic signals Special BRT signals Transit signal priority Signal timing & coordination Electronic passenger information signs Communications trunk network

BRT Stations 47 stations BRT stations 27 Center median stations 20 Curbside stations Station Features Custom Designed Shelters (subject to design review) Amenities (benches, trash cans, etc) Station Lighting (includes station & adjacent street and pedestrian lighting) Pedestrian protection & Safety features Cont.

BRT Stations Cont. Passenger boarding platforms Width varies depending on location and design In order of usage – 12-foot single bi-directional shared median platform 8-foot curbside platform 9-foot split median platform Most platforms are 60-feet long excluding access ramps and traffic transitions 3 stations in downtown Oakland have 6 platforms which would be 120-feet long on streets with multiple bus routes Level passenger boarding Platform is inches above street level Integration of vehicle & station design (0.375” vertical + 2” horizontal gaps)

BRT Project Schedule Project Phase Environmental Record of Decision Prelim Engineering Final Design R/W Acquisition PCGA w/ FTA Utility Relocations BRT Construction Rev. Operations Aug ‘12 Apr ‘16 Sept ‘13