Overview Illinois Accelerator Research Center (IARC) July 2010 R Kephart.

Slides:



Advertisements
Similar presentations
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Advertisements

First Unitarian Universalist Church of San Diego Campus Renovation Project Construction Budget Options January, 2011.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Louisiana Safe Routes To School Program
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Interactive Highway Safety Design Model (IHSDM)
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
December 2009 Movement & Activity Recommendations: 1.Promote & Increase Stair Usage 2.Promote Bicycle Commuting 3.Promote Walking Great Places to Work.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Safety Audit Components Safety assessment for risk Management.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Controls & Data Services
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Long Range Facility Planning assisted by Silver Falls School District.
GPP CDF Refurbishment ADA LEED Budget. DCEO Grant Proposal The DOE will also fund Fermilab to undertake a significant renovation and re-purposing of an.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Which city would you rather live in, bike in, work in, and vacation too? Which city would you rather drive through? Which is more important to you?
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
Fermilab Master Plan Overview Presentation Mission Support Organization Planning Winter Workshop Feb 20, 2013.
Capital Development Process Office of the Architect August 10, 2009 Project Manager / Construction Administration Manager Training.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Academic Research Enhancement Award (AREA) Program Erica Brown, PhD Director, NIH AREA Program National Institutes of Health 1.
Leveraging Resources Within the Institution and Region Sponsored by: National Council for Continuing Education & Training Presented by: Stephen B. Kinslow,
Timeline History NOV 2007 Community process began MAY 2009Draft Recreation and Open Space Element released JUL 2010 Funding for the environmental review.
5/16/11 IARC RDK All experimenters mtg1.  A new building will be constructed near CDF. The Office Technical & Education (OTE) building is part of the.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Interstate 95 Corridor Improvement Program June 20, 2012.
January 26, Key Themes from User Groups
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Center for Advanced Energy Studies Harold S. Blackman Interim Director, CAES July 18, 2007.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
IARC Requirements and Status Oct 5, 2009 R Kephart.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Customer Visit Center (CVC) Overview
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
PLANNING FOR A NOAA SCIENCE CENTER June 28, 2000.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
OTE Building PMG Report June 25, 2012 Rhonda Merchut 1.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
Council for Quality Growth North Fulton Advisory Meeting
Interdisciplinary teams Existing or new roadway
Draft Transportation Element September 6, 2017
Campus Construction Projects
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Meeting of the Hillsborough MPO Board December 5, 2017
Safety Audit Components
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Meadow Lake Boulevard Street Extension Project
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Presentation transcript:

Overview Illinois Accelerator Research Center (IARC) July 2010 R Kephart

IARC Primary Goals Basic goal is to make Fermilab and Northern Illinois a world class center for accelerator development and to initiate/promote/support related industry in Illinois. IARC is jointly supported by the State of Illinois (DCEO grant) and the U.S. DOE, office of HEP IARC will provide infrastructure, office space, and support facilities that will increase the probability that new accelerators like Project X and ILC are sited at Fermilab and allow industry to more easily work with us. IARC will support training of scientists and engineers in accelerator physics and related technology via work with local universities.

Possible Secondary Goals Office space for FNAL accelerator staff Home for Project X, or Illinois Accel institute? Infrastructure to support construction of Px, incl specialized infra for a CW linac Additional lab conference rooms Public Outreach: Green building; prominent; visually appealing Consolidate central FNAL campus

Education Engaging NIU and perhaps U of C, to create an accelerator education program in IARC Accelerators are becoming crucial to our economy but we are not training scientists, engineers, and technical workers –New FNAL-NIU joint appointment, total 3 accelerator physicists now on staff –Courses taught by FNAL staff –Builds on existing NIU RF power training courses (AD engineers) Considering hosting the Illinois Accelerator Institute a joint FNAL-ANL venture in IARC. (Rog Gerig is ANL contact)

History Submitted a proposal to Illinois Department of Commerce and Economic Opportunity (DCEO) in 2006 DCEO’s mission is to promote Industry and high tech Federal projects in Illinois. IARC attractive to them because leverages the Federal investments at FNAL and ANL Original emphasis was to attract ILC and FRIB to Illinois, also education, industry. Requested $ 35 M for new building. Proposal hung up for several years as Illinois failed to pass Capital Bill. Proposal modified to be more generic ( Project X, ILC, and industrial accelerators) $ 31 B Capital Bill passed in 2009 Contained $ 20 M for the IARC building as a grant from DCEO to be funded with sale of bonds

History Less than the $ 35 M request, unlikely to get more from the State  Had to make a viable plan with $ 20 M Oct 2009: Presentation to Dennis Kovar of IARC plan –Obtained commitment from DOE for major contribution to IARC ( $ 13 M in site development, conceptual design, FESS project oversight and $37 M commitment for refurbished CDF assembly building) Dec 2009: DCEO survey form submitted. –Included “Scope of Work”, conceptual design, cost estimate, Federal leverage, and funding profile. –David Parr, DCEO is the contact

History Feb 2010: –IARC Conceptual Building design options completed by A&E firm Ross Barney Associates (RBA) with DOE funds. –Functional Review of IARC building designs with FNAL Sr Staff. May 2010: Approval letter from DOE Site office to build IARC, discussions of WFO, etc. May-Jun 2010: Discussions with Andy Ross in Gov Quinn’s office and DCEO to get IARC funds released Jun 2010: –Director selects final IARC building design –Call from DCEO indicating IARC to be funded in 2010 –Flurry of activity to provided needed documents to DCEO and approve grant before July 1 end of State Fiscal year. July 2010: IARC DCEO grants approved! Final WFO document in progress

Two State Grants: $3M & $17M We have received checks for full amount

Building Design Building conceptual design well developed by outside A&E firm ( Ross Barney) and Engineering firm (ARUP) using DOE funds Slides from June Ross Barney presentation follow

IARC MISSION:  Make Northern Illinois a center for accelerator development  Provide office space and infrastructure to position Fermilab as a premier location for the siting of new accelerators and allow industry to work easily with Fermilab  Provide a location for industrial, university, and laboratory partners with access to vital resources, such as infrastructure and trained accelerator and technology experts, necessary to develop new accelerator components.  Offer spaces for the training of scientists and engineers in accelerator physics and related technology  Create space for exhibits that will highlight various aspects of accelerator science and its various connections and applications throughout the world.

GOALS AND OBJECTIVES  Meet the functional needs of the IARC mission  Generate a dramatic, high profile building  Produce a building that incorporates Fermi design philosophy  Strengthen ability to attract new physics projects  Maximize State funding with “bricks & mortars”  Create a symbiotic relationship to existing CDF building  CDF truck access must be maintained  High degree of flexibility for rotating tenants  State-of-the-art computing and video capabilities  Accommodate parking  Design to LEED Gold

Illinois Accelerator Research Center (IARC) Consists of three (3) planning elements:  Office, Education and Technical Building (OTE)  High Bay (existing CDF building)  Parking Future physical connection to CDF Connection to the Industrial area Repurposing of CDF User interior build out

LOCAL SITE

PROCESS Established goals and objectives Verified program requirements Analyzed existing building (CDF) High bay Office component Truck access Analyzed potential sites Utility infrastructure Relationship to existing facilities Circulation and traffic Parking requirements Developed two building alternatives Site plans Block diagrams and models Renderings Evaluated these designs vs Function Requirements and revised

SITE DEVELOPMENT Pavement/Hardscape Provide required parking Add median to “D” road for safety Maintain truck access to west side of CDF Maintain bicycle path Add pedestrian routes Utilities End-of-life Utility Replacement and Realignment Provide new utility services to OTE building Sustainable Strategies to be Considered Closed loop geothermal field Permeable pavements Photovoltaic modules to generate on-site energy Wind turbine to generate on-site energy Constructed wetland for wastewater treatment

OTE BUILDING OPTIONS Option A – Façade Scheme 45,200 gross square feet 3 stories 45 feet Connection to CDF First floor into at high bay at north end Second floor interior bridge through CDF at west end Cost: $12 M Option B – Tower Scheme 44,600 gross square feet 8 stories 128 feet to roof Connection to CDF Cost: $13 M Both designs meet the functional requirements of IARC Director Selected Option A after June 15 presentation

OPTION A – FAÇADE SCHEME

SITE PLAN

A B OPTION A – FAÇADE SCHEME GROUND FLOOR 14,600 GSF EL 0.0

SECOND FLOOR 15,300 GSF EL OPTION A – FAÇADE SCHEME

THIRD FLOOR 15,300 GSF EL ’

OPTION A – FAÇADE SCHEME SECTION A SECTION B

OPTION A – FAÇADE SCHEME SECTION B - ENLARGED

OPTION A – FAÇADE SCHEME view from northwest

OPTION A – FAÇADE SCHEME view from northeast

OPTION A – FAÇADE SCHEME view from southwest

FAÇADE Features Linear, kinetic, bold, energetic Horizontal Open plan, small or large units Iconic lunchroom & conference rooms Communicating stairs Adjacent, classrooms and light tech spaces on ground floor “Catwalk” connection to CDF offices with view into high bay Hidden utility yard Must move D Road Relates well to all parking options Relates well to industrial complex Adjacent parking – 64 spaces

Parking Scheme chosen 153 additional new spaces Informal parking “grove”

TRAFFIC CALMING TECHNIQUES NARROWING the real or apparent width of the street Building placement Street lighting and trees Raised curbs Spot narrowing of pavement Medians and crossing islands DEFLECTING the vehicle path Traffic circles Short medians and crossing islands Stop control ALTERING the vertical profile of the vehicle path Flat top speed humps Raised crosswalks Textured or change in pavement

TRAFFIC SLOWING – NARROW LANES

TRAFFIC SLOWING – RAISED CROSSWALK

TRAFFIC SLOWING – SPLIT ROAD WITH MEDIAN

CONNECTION TO WILSON HALL Use the existing geometry Strengthen the “arc” Extend the bike path Option 1 – Plant shade trees at regular intervals – Create formal “boulevard” Option 2 –Install solar panels as shade canopy –Synergistic application of alternate energy technology Option 3 –Create a linear sculpture garden –Continues tradition of connecting “science, technology and art” Option 4 –Combine Options 1 and 3 –Combine Options 2 and 3

CONNECTING THE OTE TO WILSON HALL

OPTION 1 – FORMAL BOULEVARD

OPTION 2 – SOLAR CANOPY

OPTION 3 – SCULPTURE GARDEN

Issues for further discussion Funding FESS and GPP site prep project –Integration with Industrial Area Upgrades Plan –Need GPP (or IGPP?) directive in place ASAP Resolving A&E issues –Continue somehow with RBA? ( Procurement issues) –Bringing new A&E up to speed quickly to meet state schedule Impacts of IARC construction on others –On traffic (ie road modifications and utility realignment) –On accelerator operations –On CDF operations –Need to fully explore these, but we think we can arrange these to be minimal. Decommissioning plan for CDF vs IARC plan ARRA II funds ? Schedule

Site Prep GPP Project IARC to be integrated into Industrial Area Upgrades Program: Industrial Area Site Upgrades (IASU) Office, Technical & Educational (OTE) Building OTE Outfitting CDF Building Repurposing & Remodeling Industrial Facilities Consolidation Need to have IASU GPP directive in place so that work is not held up by likely FY11 CR

DOE Funding Profile

Funding FESS for IARC Mgmt

ARRA II Potential Projects “What do we assume about this?” CDF Repurposing & Remodeling: TEC $5M The 30 year-old CDF building will require upgrading and modernization involving necessary improvements for accessibility, life safety, and sustainability. In addition to basic building systems modernization including offices, restrooms, lunch room, and elevator system, construction of a connecting link to the OTE Building will be provided to allow for the CDF office spaces and heavy assembly areas to be fully integrated with the OTE Building. Industrial Area Site Improvements: TEC $5.5M It is anticipated that the Industrial Area will be undergoing several significant improvements. Maintaining a dependable base from which science programs can be accomplished is dependent upon maintainable and flexible utility systems. End-of-life utilities must be upgraded, replaced and re-aligned. The existing Industrial area will become a fully integrated campus necessitating the need for safety improvements to vehicular and pedestrian travel routes. With the addition of training and conference centers in the area existing parking is becoming over-burdened. A new parking lot is required. Restore Scope to IARC: Furnishings (or OTE Building Furnishings) TEC: $9.5M The new OTE Building will be designed to be a highly flexible building including a modular demountable partition system. New demountable partitions with compatible furnishings and fixtures will be installed. In addition, open office cubicles, conference room furnishings including state of the art integrated technology capabilities, telecommunication/data systems, cafeteria fit- up, exhibit area display areas, and general office equipment will be required.

Updated Schedule To Meet 2-year State Requirement

Summary IARC building is now funded Conceptual IARC building design and parking scheme have been selected by the Director Planning for site prep is advanced Have 2 yrs to build this building Need more detailed plan of CDF refurbishment Now that IARC is real, we need to work on planning the detailed “program”, initial occupants, etc for this building