Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.

Slides:



Advertisements
Similar presentations
A Look to the Future By: Pat Hughes, Dave Holt, and Ron Bumann.
Advertisements

AD/AB - LCCA 2 nd Session Wednesday, January 29th.
Homework 3 Solution Lecture Packet 16 © John W. Brackett.
MANAGING TECHNIQUES, MATERIALS, AND FUNDING TO PROVIDE EFFICEIENT SURFACE TRANSPORTATION PRESERVING THE NATIONS ROADWAYS Kate Gasparro Clemson University.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
Life-Cycle Cost Analysis
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
CALTRANS EXPERIENCE WITH WARRANTIES. WHY WARRANTY The Right Strategy at the Right Time Shift Responsibility of Quality Control to Contractor State Responsibility.
Perpetual Pavements Concept and History Iowa Open House
Pavement Type Selection (Designs, Costs & Bidding) 9 th Annual Concrete Conference for the Maryland Transportation Industry March 24, 2009 Timonium, MD.
Asphalt Price Trends New Realities. Asphalt Price Trends This stuff is really expensive! The market is changing The $/Value/Tech curve.
Pat Gardiner Bureau Of Maintenance And Operations 1.
MIT Concrete Sustainability Hub Bruce McIntosh, Portland Cement Association.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
The Rehabilitation Solution for Alabama’s Concrete Pavements
mydocs-presentations-2011PAPAMWF-EricaRevisions
1 PAVEMENT DATA ITEMS. 2 Climate_Shapes (4 LTPP zones) Soil_Shapes Metadata Estimates Section level data HPMS Pavement Data Summary level data.
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
A Urban Highway Infrastructure: Design For Long, Long Life Michael I. Darter, Ph.D, PE Principle Engineer, ARA, Inc. Director, Pavement Research Institute,
Michigan DOT Concrete Bus Tour August 13, Bill Miller, PE, Chief, Quality Assurance Division, West Bureau of Construction and.
Pavement Type Selection: What is the Ideal Process (and what Role does Competition Play)? Leif G. Wathne P.E. ACPA.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
Steve Krebs, Bob Arndorfer, and Jed Peters – DTSD-Bureau of Technical Services April 29, 2013.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Life Cycle Cost Analysis Promises and Pitfalls Indiana Annual Asphalt Conference December 14-15, 2010.
Steve Krebs and Jed Peters– DTSD-Bureau of Technical Services July 29, 2013.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
Sustainability… in the eye of the Beholder A (recently retired) practitioners view Georgene Geary, P.E. GGfGA Engineering, LLC Green and Blue Highways.
Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.
Benjamin Krom, PE Michigan Department of Transportation.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Economic Analysis: Applications to Work Zones March 25, 2004.
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
Survey Responses Regarding Current Issues and Approaches for: Price/Supply Issues, Alternate Bidding Issues, Practices for Increasing Competition Prepared.
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
LTPP Program Presented to the ACPA Professors Workshop Skokie, IL June 19, 2008 Long-Term Pavement Performance Program.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Concrete Pavements The Right Tool for The Right Job.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Maintenance & Rehabilitation Strategies Lecture 5.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
Alternate Bid on Pavement Projects Overview Keith Shannon Director, Office of Materials and Road Research Mn/DOT – ACEC Annual Consultant Conference March.
Re-Do It -- Faster, Cheaper, Greener Pavement Renewal Solutions.
Successes in Reducing Highway Fatalities Kathy Harvey, MoDOT State Design Engineer July 16, 2008 Albuquerque, N.M.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Using Reflective Crack Interlayer-
1 Malawi Public Expenditure Review: Road Sector 21 November 2007.
PAVEMENT TYPE SELECTION Hesham Mahgoub, PhD, PE. South Dakota State University South Dakota Department of Transportation, Office of Road Design.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Florida APT Update.
European Asphalt Pavement Warranties Scan
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Cost Containment Working Group Board Update
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
Presentation transcript:

Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central Missouri

Pavement Design and Type Selection Process TODAY’S PRESENTATION  Background  Team Members  Goals of the Team  Risks Taken  Outcomes  Next Steps

Pavement Design and Type Selection Process Background  Last formal review in 1998  Issues with previous methods (Pro/Con)  Industry concerns  Public told us: “We want smoother pavements.” “Get in; Get out; Stay out!”

Pavement Design and Type Selection Process Background Why now?  Dwindling financial resources  More emphasis on maintenance instead of new construction  Establishment of department goals  Publication of RDT Pavement Report (2002)

Pavement Design and Type Selection Process Team Members MoDOT + Industry  MoDOT  FHWA  ACPA  MAPA  Contractors (2 asphalt, 2 concrete)

Pavement Design and Type Selection Process Goals of the Team Two desired outcomes … Provide public stakeholders with:  The best pavement product that can be delivered w/in current financial projections.  A clear understanding of pavement design and type selection process.

Pavement Design and Type Selection Process  Maintain two strong industries. Goals of the Team ASPHALTCONCRETE

Pavement Design and Type Selection Process Goals of the Team NHS Remaining arterials Pavement Team Consideration Policy Decision 9,000 miles of MoDOT’s system carry 86 percent of the traffic (NHS and remaining arterials). Collectors

Pavement Design and Type Selection Process Risks Taken  Existing risk if no action taken. Efforts by industry to mandate legislatively  Inviting industry to the table. Could parochial biases be put aside? Could discussions remain focused on topic? Alternate bids  Would more competitive bids be realized?  Organizational risk. Avoid skepticism & resistance to change

Pavement Design and Type Selection Process Outcomes Life-Cycle Cost Adjustment Worksheet

Pavement Design and Type Selection Process LCCA Worksheet

Pavement Design and Type Selection Process LCCA Worksheet

Pavement Design and Type Selection Process LCCA Worksheet

Pavement Design and Type Selection Process Alt. Pavement Update for Jobs Thru June 2005 with LCCA Factor  24 Alternate Projects to Date ($320.7 mil) 21 Full Depth ($295.3 mil) 3 Rehabilitation ($25.4 mil)  Full Depth 12 Asphalt Awards ($170.4 mil) 9 Concrete Awards ($124.9 mil)  Rehabilitation 1 Asphalt Award ($2.6 mil) 2 Concrete Awards ($22.8 mil)

Pavement Design and Type Selection Process Results – Difference in Low Bids Low PC Bids vs. Low AC Bids LCCA Factor not Applied  PC Total – $223,509,000  AC Total - $220,580,000  Difference - $2,929,000 (1.3%) Low PC Bids vs. Low AC Bids LCCA Factor Applied  PC Total – $223,509,000  AC Total - $231,411,000  Difference - $7,902,000 (3.5%) LCCA Factor has Determined Low Bid 2 Times since October 2003.

Pavement Design and Type Selection Process Results – Over 2 Lane Miles

Pavement Design and Type Selection Process Results – Over 2 Lane Miles

Pavement Design and Type Selection Process Other Facts  All Alt jobs with no LCCA have Asphalt awards  AC price Average for alternate paving projects is $36.78/ton or 15.7% lower than the 3yr ac average of $43.62/ton.  Concrete CY equivalent price for alternate paving projects is $96.77/CY or 6.3% lower than the 3 yr pc avg. of $103.28

Pavement Design and Type Selection Process Outcomes  Pavement Rehabilitation Strategies For existing Portland cement concrete (PCC), both plain and HMA overlaid  Unbonded JPCP overlays  HMA overlays on rubblized PCC  Transition from existing pavement design model to new model (Mechanistic- Empirical).

Pavement Design and Type Selection Process Outcomes  Clearly Written, Established Process Readable & Understandable Consistent & Efficient

Pavement Design and Type Selection Process Next Steps  Phase two Implement new pavement design process.  Develop calibration model for Missouri roadway conditions.  Subsequent generation of M-E designs for pavement types selected by the MoDOT/Industry Pavement Team. Will result in variable pavement thicknesses dependent upon local conditions.

Pavement Design and Type Selection Process Next Steps ISSUES TO BE RESOLVED  Some of the issues yet to be resolved: Finalize costs to be included in LCCA.  I.e., user costs, vehicle operation costs, etc. Review results from initial alternate bid pavement projects. Is staged construction a valid design consideration? Are full-depth shoulders cost effective?

Pavement Design and Type Selection Process Next Steps ISSUES TO BE RESOLVED  Some of the issues yet to be resolved: Should noise impact and friction become pavement design considerations? Are recycled pavement savings tangible and should they be included in LCCA?

Pavement Design and Type Selection Process Closing  We are committed to: Provide the best value to our customers. Keep industry involved as we learn more. Questions? Full report available on line at:

Pavement Design and Type Selection Process Outcomes  New Pavement Strategies Jointed Plain Concrete Pavement (JPCP), or Conventional Hot Mix Asphalt (HMA)  Polymer Modified Asphalt (PMA) – top 2 lifts on most heavily traveled NHS & principal arterial routes  Stone Matrix Asphalt (SMA) – top lift on interstates