Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
Advertisements

HR 08 IB SPP 02 TWINNING PROJECT “ENHANCEMENT OF CAPACITY FOR EFFECTIVE MANAGEMENT OF EU COHESION POLICY FUNDS” 1 The most significant results of Component.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
Progress on developing, preparing and financing environmental investment projects REPUBLIC OF MACEDONIA.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Development of the Wastewater Collection and Treatment System in Szombathely County Town 2003/HU/16/P/PE/021 EXTENSION OF THE SEWER NETWORK IN THE WEST-TOWN.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
WATER AND WASTEWATER Ltd. Rijeka REPUBLIC OF CROATIA Andrej Marochini, B.Sc.C.E.
STATUS OF CF CO-FUNDED PROJECTS 11 April 2008 AIVARS JURJĀNS Ministry of Environment Head of Projects Implementation Department.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
EU Environmental approximation in the WB and Turkey- ETNAR Conference Accession process in WB and civil society-Montenegro Nataša Kovačević NGO Green Home.
GEO Work Plan Symposium 2014 Session 5 Future Requirements for Observations and Information Global Monitoring Plan for POPs Tracking pollutants HE-02 Katarina.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Project Implementation Plan and Principal Activities
Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 004 FGD Plants at Units 5&6 of TPP Maritsa East 2.
9 th NSRF Monitoring Committee meeting, 11 December 2014 EUROPEAN UNION EUROPEAN REGIONAL DEVELOPMENT FUND Investing in Your Future Operational Programme.
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
ERDF for Education And Science Ministry of Education And Science 1st of October 2013.
WATERCYCLE planning and managing water resources Adriatic New Neighbourhood Programme INTERREG/CARDS-PHARE Sisak-Moslavina County Koprivnica, 16 th January.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2014 till March 2015.
14/10/2015European Agency for Reconstruction1 Water & environment.
Human Resources Development Project for Water Supply Phase 2.
 PPP Department within the Ministry of Economy and Transport  Government Decree in May 2003 to set up an Interdepartmental Committee – Ministry of Economy.
Project No 2005/LV/16/C/PE/003 Development of water services in Riga, stage III This project helps to reduce economical and social disparities among the.
Kick-off Meeting Belgrade, 4-5 December 2008 Network of Centres for Project Development and Management.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Public Private Partnership + EU Funds in Poland general overview and the future outlook.
WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.
Hungarian proposals for the revision of EGTC Regulation and EGTC good practices Presenter: Dr. Erika Szabó Minister of State for Territorial Public Administration.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2013 till March 2014.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
E nvironmental Protection in Bulgaria facts and challenges Workshop on : “Protection of the environment: climate change, pollution and biodiversity” Sofia,
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Ontario Region First Nation Water & Wastewater Action Plan Presentation on March 9, 2010 Niagara Falls, Ontario INAC Ontario Region.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE Foreign Relations Department Projects Group TurkStat Meeting of the Policy Group on Statistical.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
EU Funds in Latvia Aleksandrs Antonovs Ministry of Finance Deputy director of Department of EU Funds December 4, 2006.
Demonstration Project in Waste Water Treatment Delhi Jal Board, India Is Water Business Export Business? DHI, 14 October 2011 Peter Sand.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
Ministry of Interior Progress of Bulgaria in the preparation for joining the Schengen area January July 2009 July January
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
TAIEX – REGIO Multi Country Workshop on management practices for environmental investments 8-9 December 2015, Vilnius Presentation by BULGARIA Ministry.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Non-profit Business Support Centres in Hajdú-Bihar and Bihor counties: Development of operation an cooperation facilities HURO/0802/108_AF Experiences.
Supply Chain Management of Second Line Drugs: Russian Example Dr Vadim V. Testov Central TB Research Institute, Moscow, the Russian Federation.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2015 till March 2016.
Prof. dr. Giedrius Vanagas
PRESENTATION OF MONTENEGRO
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
PLANNED ACTIONS – UPCOMING DUTIES
Water projects under The Cohesion Fund.
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
Establishment aid coordination and management mechanisms
COHESION FUND MONITORING COMMITTEE
Dr. Katja Šnuderl, Contract manager
National Transition Facility / Phare / Cards
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
2015 January February March April May June July August September
Presentation transcript:

Development of the Wastewater Collection and Treatment System in Szombathely County Town Reconstruction and Upgrading Works of the Wastewater Treatment Plant 2003/HU/16/P/PE/021

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant Implementation of the Project Signing the Financing Memorandum, tasks of the contracting Tasks of the Project Implementation The Public Procurement Procedure and its phases Implementation Financial implementation Monitoring – checking – evaluation Completion of the Project

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant TENDERING Preparation Works of the Development program financed by the Cohesion Found has been completed on 4th February 05. Predictable Date of Completion was 31st December 07 for the entire Project The total cost of Euro have been covered in 60% by the Cohesion Found, in 30 % by State Budget and in 10 % by the local Municipalities Fermentation towers

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant PUBLIC PROCUREMENT PROCEDURES PROCEDURES TARGETING WORKS OF IMPLEMENTATION: Development of the Sewage and Rainwater Collecting System in western part of Szombathely Upgrading the technology of Sewage Treatment Plant I. Upgrading of the mechanical pre-treatment system and the Sewage Treatment system II. Construction of new Composting Plant PROCEDURES TARGETING SERVICES: Expert’s Services of tasks of „Engineer” and Technical Surveyor Providing Services of Information and Public Relations connecting to the Project Expert’s Services for the Project Implementation Unit

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant On 28th November 03 the Financing Memorandum of the Project has been signed by the European Comission On 11th February 04 the Financing Memorandum of the Project has been signed by the Republic of Hungary On 28th May 04 a Consortium Agreement has been signed by the Municipalities involved into the Development for the implementation of the Project. In this Agreement Szombathely County Town has been nominated as a Gestor. The agreement bonds the VASIVÍZ ZRt for cooperation on the course of implementation. The preparation of the Project has been completed on 4th February 05 by signing the Financing Memorandum made between Szombathely County Town and the Ministry of Environment and Water The first Service Contract of the Project has been signed on 22nd September 05 to provide Expert’s Services by the Canor International Ltd. for the tasks of „Engineer” Implementation of the Project

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant On the 9th December 05 the winner of the Public Procurement Procedure for PR Services, namely the Medius Iroda signs the Service Contract with the Beneficiary On 9th March 06 the Contact for the Extension of the Sewage Collecting System in the west-town has been signed by the „Borostyánkő Konzorcium-2005” (Swietelsky Építő Kft. és a TEERAG-ASDAG AG Niederlassung Burg enland ). On 9th March 06 the TECHNOPLUS Környezetvédelmi Technológiai Fejlesztő Kft. contracts for Expert’s Services for the Project Implementation Unit working in the Mayor’s Office of Szombathely On the 22nd March 06 the winner of the relating Public Procurement Procedure, namely the TEERAG – SWIETELSKY Konzorcium (TEERAG- ASDAG AG Niederlassung Burgenland és Swietelsky Építő Kft) signs the Works Contract

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant On 11th May 06 the winner of the Public Procurement Procedure for Reconstruction and Upgrading of the Wastewater Treatment Plant namely the ALTERRA Építőipari Kft. signs the Works Contract

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant On 16th June 06, with the contribution of Mr. Pál Kiss, the head of Institute of Development in Ministry of Environment and Water, furhermore dr. György Ipkovich Mayor of Szombathely the foundation-stone of the Sewage-sludge Composting Plant has solemnly been positioned on Szombathely On 6th September 06 in the frame of Press Conference, András Róza, the area manager of the Contractor Alterra Ltd. working at the implementation of Sewage Treatment Plant, has informed the representatives of the local and national Media about the progress achieved in the Project On 10th August 07 there was an Open Day at the Sewage Treatment Plant At 9th October 07 the Parties have signed the Amendment No. 1 of the Contract for the Reconstruction and Upgrading Works of the WWT Plant The amended Date of Completion is 30th September 08. On 31st March 08 the Contractor Alterra Ltd. has launched the 6 months long trial Operation of the facilities implemented in the frame of Project

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant Upgrading of the mechanical pre-treatment system and the Sewage Treatment system Building of Sludge – treatment Plant

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant General arrangement of the WWT Plant

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant Progress of Works 1st June 06-31st March 07 The net contracted value is ,-EUR. Date of Site Delivery was 15th June 06. The Design and Works have been commenced according to the approved Time Schedule Reinforced concrete structure of the fermentation towers, the outer wall of stair- house, furhtermore the northern and southern walls of the head-exchange plant have been completed. Concrete structures of the sandtrap, screen-house and the new pump have been completed. The educational-house, the service engine-house, the boiler-room and the roof of the sludge-treatment engine house have been completed. A rough screen in the stone-trap building has been installed Formwork of walls at the Fermentation tower

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant 1st April 07 – 30 June 07 Construction of the structure and installation of technology in the fermentation towers have been completed. The achieved level of progress is about 80% in case of technological installation in sludge-treatment engine house, furthermore in case of screen and sand-trap the progress is about 90%. Reconstruction of the sludge- treatment engine house is in progress. Electrical installation of the new and the reconstructed facilities is in progress as well. Fermentation towers

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant 1st July 07 – 31st December 07 Facilities constructed : sewage pump shaft, sludge settling basins, equalising basin, fermentation facilities, heat-exchange engine-house, biogas-separator and dewatering shaft, gas-storage, gas-torch, gas- receiving and measuring shaft, pump of non-drinking water-supply, new screen and new sand-trap, pump for settled sludge, pump-house, main sewer and overpass, recirculation engine-house, sludge-treatment engine- house, furthermore, the rainwater storage in 70% of completion The new gas- storage

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant Technological machinery completed : sewage pump, sludge settling basins, pump- shaft for settled sludge, fermentation facilities, heat- exchange engine-house, biogas-separator and gas- dewatering shaft, gas- storage, gas-torch, gas- receiving and measuring shaft, pump of sludge overflow, recirculation engine-house, new screen and new sand-trap, new sewage pump, sludge- treatment engine-house, central pump-house, stone- trap and existing sand-trap, pump of non-drinking water- supply, furthermore, the equalising basin in 60% of completion Earthwork of sand-trap

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant Installation of machinery : 95% of completion can be recorded in the following facilities: new screen and sand-trap, new sewage-pump, sludge-treatment engine-house, fermentation facilities and heat-exchange engine – house, biogas-separatos and gas-dewatering shaft. 80% of completion : stone-trap and existing sand-trap Electrical installation of the following facilities have been completed: sewage pump, sludge-settling basins, recirculation engine-house, equalising basin, pump for sludge-overflow, pump for the non-drinking water-supply. 96% completion : sludge-treatment engine-house. 95% completion: fermentation and heat-exchange engine-house, shaft of settled sludge-pump, central engine-house, stone-trap and existing sand-trap, new screen and sand-trap, biogas-separator and gas-dewatering shaft, gas storage,gas-torch, gas- receiving and measuring shaft. Regarding to Installation of control-technology, fermentation facilities and heat-exchange engine-house have been completed. 96 % of completion: new screen and sand-trap, new sewage pump, sludge – treatment engine- house, biogas-separator and gas-dewatering shaft, gas-storage, gas-torch, gas receiving and measuring shaft. 90% of completion: stone-trap and existing sand-trap, 85 % of completion: central engine-house, 20 % of completion: shaft for the pumps of settled sludge Conveyor lines inside the Plant: lines of gas-supply and iron-salt supply lines have been completed. 95% of completion: polluted air lines, furthermore non-drinking water-supply lines. 40% of completion: drinking water supply

10th August 07 – In the frame of Open Day the Public had the opportunity to get a view into the modern technology of wastewater treatment and sludge treatment on a Site Visit and a chance to get convinced about the successful results achieved in the Project 2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant Open Day at the Sewage Treatment Plant

The 6 months long Trial Operation launched at the end of March has been completed on 30th September 08. The Project has been completed in time, meeting with requirements of the Amended Contract Results achieved  On the course of extension and Upgrading the Sewage Treatment Plant facilities of mechanical pre-treatment and sewage treatment have been implemented  Conditions of operation has been established, on one hand satisfying both of Hungarian and EU legislation and on the other hand providing long-term feasible operation of sewage treatment and sludge-treatment technology  Elimination of odour-pollution of air in the neighborhood of the Plant is predictable. 2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant

On 14th October 08, in presence of Danuta Hübner, as the Comissioner responsible for Regional Policy of European Comission, Gordon Bajnai the Minister of National Development and Economy, furhermore, Imre Szabó, the Minister of Environment and Water, the solemn act of Taking Over has been made

2003/HU/16/P/PE/021 – Szombathely Reconstruction and Upgrading works of the Sewage Treatment Plant Thank you for your kind attention! Source: