On-Site Leachate Management RM of Tache Pilot Study.

Slides:



Advertisements
Similar presentations
EO TP3 SAMPLING WASTE DISPOSAL SYSTEMS.
Advertisements

Unit Animal Science. Problem Area Aquaculture Lesson Factors Affecting Dissolved Oxygen in Water.
Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
LEACHATE MANAGEMENT AND TREATMENT
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
TRP Chapter Chapter 6.3 Biological treatment.
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Treatment of Slaughterhouse Wastewater
Anne Arundel County Department of Public Works
Biological waste water treatment
Landfill Water Quality Project Paul Brooks, Lea Bullard, Leslie Harper, Amanda Strickland, Sarah van Schagen April 30, 2004 University of North Carolina.
Sustainable Management of Scarce Resources in the Coastal Zone SMART ICA3 – Kick-off Meeting CEDARE, Cairo, 5-6 January, 2003 Case Study Jordan.
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
Leachate Treatment at Virginia Landfills By: Bob Gardner, PE, BCEE Senior Vice President SWANA Old Dominion Conference Wintergreen, VA August 7, 2014.
Environment Engineering I
Part III Solid Waste Engineering
Waste Management (Food Waste) Regulations 2009
by Chayanon Sawatdeenarunat
Septage Bioreactor Landfill
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
1 CE 548 Analysis and Selection of Wastewater Flowrates and Constituent Loading.
WASTEWATER ENGINEERING
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Public perception of pesticides Public has a poor understanding of pesticides Public has a fear due to media and from misuse and accidents.
Wastewater Treatment & Collection System Improvements.
Long-Term Leachate Management at the Tom Howe Landfill Site Kaela Roelens Haldimand County MWA Spring Workshop May 2014.
Wastewater Treatment Plant
Reducing the Amount of Waste Activated Sludge Sara Schmidt CE 479 December 6, 2006.
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Crops to be Irrigated Factors for consideration
CENTRALIZED WASTE TREATMENT 40 CFR 437 Lessons Learned.
Making Waste Productive. Creating Energy from Waste.
Landfill Processes. Objectives  Describe the physical, chemical, and biological processes occurring in a landfill  Describe leachate quality (Table.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Accelerated Landfill Energy Recover Technology Dr. Te-Yang Soong, PhD, PE CTI and Associates, Inc. Wixom, Michigan.
Composting Process. The composting process results in the generation of heat, carbon dioxide and water. It results in the production of a stable compost.
Wastewater Treatment Processes
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
Human Waste Disposal More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water. More than 500 pathogenic.
Sewage Treatment.
DESIGN OF WASTEWATER TREATMENT PLANT
 incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into.
Methods of Landfilling
Neighbours’ Meeting 29 th September Introductions  David Hopman – Manager Assets and Operations  Kevin Godfrey – Treatment Plant Supervisor.
Rural, Onsite & Small Community Wastewater & Waste Management Land Application of Wastewater.
BALANCE OF MATERIAL. Practical Advices During the generation of the Material Balance phase.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
Prepared by: Pn. Hairul Nazirah Abdul Halim
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
WATER MANAGEMENT.
5th Annual Water and Sanitation Workshop
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Optimising Sludge Dewatering – Benefits from Shared Water Services
Wastewater Treatment.
Wastewater Treatment.
ENERGY SAVING & SUSTAINABLE WASTEWATER TREATMENT PLANTS
Individual Household Treatment Systems (Septic Tanks)
Wastewater Treatment.
Wastewater Facilities Upgrade Project
Wastewater Treatment Secondary Treatment.
Energy performance and Carbon emissions Assessment and Monitoring tool
Wastewater Treatment: Characteristics and Systems
Wastewater Treatment.
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Wastewater Treatment.
Presentation transcript:

On-Site Leachate Management RM of Tache Pilot Study

Leachate Any liquid that is in contact with refuse –Waste will absorb moisture up to its field capacity. Beyond this point, any additional moisture will contribute to leachate (not accounting for channelling).

Quantity of Leachate Function of: Landfill size (footprint) Water Balance (precip, evap) Runoff/surface water shedding Water content of incoming waste –Incoming waste typ 20% moisture –Field Capacity typ 55% moisture

Leachate Minimization Why?… Implications of handling Treatment costs Disposal issues

Leachate We can influence the amount we generate,but We can’t ‘stop the flow’

Operations to Minimize Leachate Generation Minimize active face area Cover daily Grade intermediate slopes to shed water

Leachate Management Through design and operations, the objective is to minimize leachate What can we do with the leachate we do generate?

Leachate Currently allowed in MB: –Spectre of no treatment permitted in MWWTP –No recirculation –Not acceptable to exfiltrate from base of landfill –No purpose made leachate treatment facility in MB

Leachate So what do we need to have happen?

Leachate The Province can’t write a law that prohibits landfills from generating leachate so We need to create options for leachate treatment/management

Leachate Management On site storage (tank, pond, sump) Off site treatment (WTP) On site management –bioreactor –evaporation pond –on site treatment plant

Leachate Management off site  transportation costs and risk  treatment cost  sludge and effluent disposal on site --- desireable

On site Treatment For practical/ cost reasons this is rarely selected Complexity of operation Availability of Municipal wastewater treatment plant capacity

Problems with using Municipal plants Allocation of available municipal treatment plant capacity to high strength leachate Limitations of loading rates to plants Loss of municipal plant capacity for conventional community growth

Leachate In the interim, what do landfill operators do? Ones that own MWWTPs still use that option ( sunsetting) Ones that don’t have MWWTPs?? [ie. municipalities and private]

Typical Leachate Treatment in Manitoba Trucked to MWWTP ( sunsetting) No removal from landfill On site holding Other?? Unreported action

Here’s an option Overview of Pilot Study of Evaporation Pond and Treatment in the RM of Tache Description of Operations Operating Parameters Summary of Pilot Study 7 Years of operation –Quantity –Quality Observations

On Site Leachate Volume Reduction Use the net water deficit opportunities Mid west region application

RM of Tache Pilot study began in 2002, under the authority granted by MBC. Primary function of the evaporation pond; - reduce the quantity of leachate to be treated, and, - to improve the quality for ultimate discharge. Leachate from waste cells is pumped to evaporation pond. Evaporation pond equipped with spray nozzles to evaporate the liquid.

RM of Taché Leachate Evaporation Pond Pilot Project Design considerations  Spray nozzle design  Wind drift  Pond depth  Odour migration

Water Balance June thru Sept net water deficit: Winnipeg / Steinbach records June 68.8 mm July89.8 mm August71.8 mm Sept43.9 mm

Waste Cell Waste Cell Evaporation Pond Retention Pond Site Plan

Operation Goals On-site responsibility for leachate management; Optimize leachate volume reduction; Elimination of chemicals addition for treatment of leachate or hauling to WWTP; Acceleration of leachate stabilization. Pretreatment of leachate on-site to reduce biological load; Minimize long-term liability.

Evaporation Pond

Nozzles and Water Droplet Design Spray Nozzle Spray Pattern

Evaporation Pond Spray Nozzles Level Gauge Stick

Spray nozzle

Evaporation Pond

Description of Operations Operational monitoring requirements includes recording: –Precipitation, wind speed, ambient temperature, –Daily time (duration) of aeration pump operation and pond gauge reading, –Data collecting: physical – chemical analysis, –Volume of transferred liquid from EP to Retention Pond at the end of operation seasons.

Operating Parameters On average 100 kPa (15 psi) in the sprayer/by-pass circuit with leachate spraying (< 1m high), permit continuous operation of the EP If, with the “by-pass” opened, the spray from the evaporation pond drifts beyond the top of the berm, the sprayer pump shall be turned off. Hours of operation of the sprayer system will be recorded on the “Leachate Pond Operating Record”, which is maintained by landfill operators

Monthly Volume of Liquid Processing in Evaporation Pond

Summary of 2008 Pilot Study Quantity ParameterValue Volume leachate pumped to evaporation pond: 1,440 m 3 Volume of rainfall accumulation in evaporation pond: 690 m 3 Volume of liquid managed in evaporation pond: 2,130 m 3 Volume of liquid evaporated:1,470 m 3 Average daily evaporation rate:9.5 m 3 /day

Quantity of liquid processing in Evaporation Pond ( Year)

BOD and TOC over time in Evaporation Pond for 2008

Observations For 2008 Pilot Study, 2,130 m 3 of liquid was managed in the evaporation pond and 1,470 m 3 of liquid was evaporated (9.5 m3/day) Organic content expressed as BOD and TOC were reduced in the operation of the spray evaporation pond.

The spraying/evaporation process is enabling significant biological stabilization of organic content. This is considered to be due to anaerobic stabilization of organics, as the leachate resides in the landfill waste mass, prior to extraction. Dissolved metals are precipitating as metal sulphides as pH is adjusted ‘up’ in the spray pond. Summary of Pilot Study - Quality

Typical leachate generation rates; 200 to 500 cu m/ha/yr Tache 600 cu m/ha/yr Total evaporation achieved 6 cu m/1000m2 evap pond/day Using 100 operating days, evaporation pond sizing 1 ha evap pond per 10 ha landfill Pilot Study- Design Parameter Development

Go Forward Challenges End of operating season –Off site haul for treatment? –Where to? –Quality for surface discharge? –Return to Landfill –Is return flow recirculation? Current attitude of regulator Options for Operators/Owners