Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of.

Slides:



Advertisements
Similar presentations
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Advertisements

CDOT WATER QUALITY PROGRAM
2009 City of Bozeman Storm Water Update
One the things we found most troubling about the City’s Draft Environmental Impact Report (DEIR) was that there was no information included about your.
Generating Flow Frequencies – Updating NOAA Atlas Precipitation Frequency for California by: John High, Hydrologist Sacramento District Sacramento District.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
Preliminary Design of Galvez Estates Subdivision.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Drainage Rights Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Department of Agricultural and Biosystems Engineering Iowa State.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Stormwater in the FAHP. Stormwater Management Goals Treat the runoff generated from the Contributing Impervious Area by the Water Quality Design Storm.
Footer Text STATE HIGHWAY 45 SW Carlos Swonke, PG Director of Environmental Affairs TxDOT.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Things to look for and remember while preparing FD05 Estimates.
CHARACTERISTICS OF RUNOFF
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
How Landscape Architecture Works….. Enhancing the Department’s Stewardship Role in concert with Environmental and Hydraulic Design East Region Landscape.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Design of Open Channels and Culverts
EXAM 2 REVIEW. 1. Drainage problem (25 pts) Below you see a cross-section of a ditch. It runs parallel to a 200-acre field consisting of permanent pasture.
A Simplified Method of Implementing No Rise Analysis in Unnumbered A-Zones Based Upon No Loss of Conveyance Dwayne E. Culp, Ph. D., P.E., CFM Second National.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
CE 515 Railroad Engineering Drainage Source: AREMA Ch. 5, J. Rose Lectures, Ch. 19 “Transportation exists to conquer space and time -”
1 Urban Drainage and Intersection Design Image:
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.

Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Urban Storm Drain Design: Typical urban roadway characteristics
T-1 Infiltration Tools, v3.01 Presented to Caltrans and RWQCB Staff May 10, 2013 Prepared by Caltrans and Office of Water Programs 1 Presented by Sean.
Things to look for and remember while preparing FD05 Estimates.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Request for Environmental Services (RES) Missouri Local Programs How to Complete The Request for Environmental Services.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
Basic Hydrology & Hydraulics: DES 601
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Basic Hydrology & Hydraulics: DES 601
Basic Hydraulics: Storm Water Management concepts
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Vista Verde Ranch Revised Draft Environmental Impact Report Vesting Tentative Tract & Oak Tree Permit Project Description :70 unit single.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Highway and Road Projects: When to Treat Runoff William Fletcher Water Resources Program Coordinator Geo/Environmental Section ODOT.
Babcock Basin-Design Phase
Land Use and Zoning Committee Special Workshop
Measure A Financial Oversight Committee August 7, 2013
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Walker Street Reconstruction Project 25% Design Public Hearing
Hydraulics Updates to the IndianaDesign Manual
FEMA Letters of Map Change
Stream Crossing Replacement Policy
ACEC Designer Training
Presentation transcript:

Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of Hydraulics

Getting Started IGR (Inter-Governmental Review) – Optional but HIGHLY RECOMMENDED! Environmental Processing and Approval Research (Encroachment Permit Required for ALL WORK within Caltrans Right-of- Way!)

Plan and Permit Processing Plan Submittal (PS & E Package, including Drainage Report) Plan Review and Approval Construction

Why Can’t I Do That? Mandated / Restricted Use of Highway Funds and Right-of-Way Longitudinal Encroachments

REMEMBER: We Have High-Speed Traffic! (Affects ALL FACILITIES on our Highways!) Affects DESIGN!

Caltrans Drainage Considerations On-site Drainage Off-site (Cross) Drainage California Drainage Law Existing / Future Storm Drain Systems FEMA and Flood Plain Issues

On-Site Drainage No more than 0.1 cubic foot per second during a 25-year frequency storm allowed as concentrated flow anywhere within the traveled way. No water allowed to pond into the traveled way during a 25-year frequency storm.

Off-Site Drainage No formal written policy for design of culverts. Informal Policy: 100-year storm flow may not pond to the edge of traveled way; 10- year storm may not cause the culvert to seal or flow under pressure.

FEMA Issues Is there a FIRM map for any of the watercourses near your project? Will your proposed construction potentially raise the water surface by one foot or more? If so, you will need to prepare a LOMR or CLOMR - and: - Even if there is no FIRM map, you still might have to prepare a LOMR or CLOMR!

FEMA Website: rvlet/FemaWelcomeView?storeId=10001& catalogId=10001&langId=-1

Recent Problem # 1 Where water previously flowed well outside the traveled way, the installation of curb and gutter now forces this water into the highway.

Existing ground probably capable of conveying cfs before water reaches traveled way Reduced carrying capacity as a result of the curb and gutter – will carry maybe cfs before water flows into traveled way

Even in a minor storm, note how little runoff it takes to pond to edge of traveled way But now—let’s put in some curb and gutter!

Recent Problem # 2 In the desert, our old two-lane rural roads would pond to a depth of four inches or so before water would flow across the road. Now that we’ve added two lanes and a shoulder, it ponds to a foot and a half!

Water ponds to only a few inches depth before spilling over centerline

Again, water ponds to only a few inches depth

But now, let’s add two twelve foot lanes (giving us three) at 2% crossfall, a ten foot shoulder at 5% crossfall, and look how deep the water ponds!

A More Serious Recent Problem: New development, while retarding the 100-year storm to less than pre- development conditions, has increased the flow from small storms. The increased flow from these small storms is KILLING us!

The flood routing calculations showed this basin would work just fine! (Did the outlet plug?) Were the Contractor’s BMP’s functioning properly?

However, the 5-year post-development runoff of 85 cfs was NOT reduced to the pre- development 5-year runoff of 50 cfs! The basin was designed to reduce the 100-year Q from 250 cfs post-development down to 175 pre-development—and will work just fine in a 100-year storm!

So where did the extra concentrated runoff from the basin outlet go?

This is how it looked when it got to the next major highway junction…

After the storm…

Same location looking upstream…

Existing Problems you MAY be Asked to Help Solve Malfunctioning drainage facilities Non-existent facilities Safety hazards (whether drainage-related or not)

Will your development increase the flow in this ditch? If so, you may be required to improve it…

Are you developing upstream? You’ll be asked to protect the culvert entrance…

Upstream or downstream, you’re probably going to have to do something here!

(Yes, we may ask you to help fix this, too, even though we did it…)

No comment!!!

Drainage Report Submittal Guidelines for District 8 Transportation Projects Floodplain Analysis (if Applicable) Preliminary Drainage Report Final Drainage Report

Responsible Engineer Preparing Plans Caltrans Project Engineer

Responsible Engineer Preparing Plans Professional Responsible for Environmental Document Caltrans Project Manager

To order by

To Order by Mail or FAX: State of California Department of Transportation Publication Distribution Unit 1900 Royal Oaks Drive Sacramento California – 3800 FAX (916)

Caltrans Drafting Standards

Caltrans Basic Traffic Control Requirements

Caltrans Basic Soil Compaction Requirements

Caltrans Water Quality Requirements

Caltrans Basic Landscaping Requirements

…and of course Caltrans Drainage Requirements…

Caltrans Plan Review & Encroachment Permit Process

Roy H. King, MS, PE Hydraulics Division, California Department of Transportation 464 West 4 th, MS 1065 San Bernardino, CA Tel. (909)