WASTE STABILIZATION POND (WSP). Advantages:Simplicity simple to construct simple to construct simple to operate and maintain simple to operate and.

Slides:



Advertisements
Similar presentations
EO TP3 SAMPLING WASTE DISPOSAL SYSTEMS.
Advertisements

Wastewater Treatment.
Biological Treatment Processes
CE 370 Sedimentation.
Stone media TF design Example 1
Treatment of Slaughterhouse Wastewater
1 CTC 450 Review Preliminary & Primary Treatment Preliminary & Primary Treatment Measure flow Measure flow Screen Screen Grit chamber Grit chamber Primary.
Biological waste water treatment
Previously Microbial survival in environmental media –Water, land, air Small scale sanitation, composting latrines, etc Conventional wastewater treatment.
An-Najah National University Civil Engineering Department
LIS Quiz 1 Review. What are the steps of Hypoxia? 1.Excess fertilizer is sprayed on hundreds of residential lawns. 2.Rain or runoff (CSO) brings nitrogen.
Trickling Filters and Rotary Biological Contactors
W ATER Q UALITY OF W ADI A L -Z EIMAR U NDER THE D IRECTION OF D R. A BD A LFATTAH M ALLAH P REPARED B Y : N ASSER A BDULLAH A BU M OHSEN J AREH HASAN.
Wastewater Characteristics CE Importance of Characteristics The degree of treatment depends on: The degree of treatment depends on: Influent characteristics.
Sludge Treatment and Disposal
WASTEWATER ENGINEERING
Stabilization Ponds CE General Characteristics Quiescent and diked Quiescent and diked Wastewater enters the pond Wastewater enters the pond Organic.
Nitrification and Denitrification
Humberto Carlos Ruggeri Frederico de Almeida Lage Filho Mônica Medeiros Roque Passos Piveli Utilization of Shallow Ponds for Ammonia Nitrogen Removal from.
1 CTC 450 Review WW Systems Operations. Last Homework Will replace your lowest homework grade
STABILIZATION PONDS STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil Summer School on Wastewater Treatment Plants and.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to stabilization ponds.
DESIGN OF WASTEWATER TREATMENT PLANT
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
Attached Growth Biological WW treatment Systems
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Domestic Waste Water Treatment
Wastewater treatment processes (I) ENV H 440/ENV H 541 John Scott Meschke Office: Suite 2249, 4225 Roosevelt Phone:
Successful OWTS Treatment Siting –Site Evaluation –System Location Design –System Sizing –System Selection and Design Installation Operation/Maintenance.
Water Quality Management in Rivers
Introduction: We will start with an overview of treatment processes 1) Why do we treat water and wastewater? The main objectives of the conventional wastewater.
Waste water treatment - Phycoremediation
WASTEWATER STABILIZATION LAGOON PROCESS
Solids Measurement by Gravimetry n Objective n to understand the difference between the various Solids fractions that occur in Water, Effluent and Sludge.
Sewage Treatment.
Wastewater Treatment Processes
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
DECENTRALISED WASTEWATER TREATMENT AND REUSE Components and Designing
Sewage Treatment.
Anaerobic Treatment Anaerobik Arıtma Biyoteknolojisi
Introduction to Environmental Engineering Dr. Kagan ERYURUK.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
Wastewater treatment processes (I) ENV H 440/ENV H 541 John Scott Meschke Office: Suite 2249, 4225 Roosevelt Phone:
NH International (Caribbean) Ltd Penal Rock Hindu School Presented by : Sudesh Ramroop.
Biofilter Decisions Daniel Miller
Dr. Mohab Kamal. Sludge is produced from the treatment of wastewater in on-site (e.g. septic tank) and off-site (e.g. activated sludge) systems. This.
Water Treatment Drinking water : Held in a holding tank settling the suspended matter. Colloidal materials such as clay are removed from water by using.
CTC 450 Review WW Collection Systems Types of pipes Installation.
WATER MANAGEMENT.
Using PC simulation for flow sensitivity analysis with application to a wastewater treatment plant Panaitescu Ileana-Irina, Panaitescu Mariana, Panaitescu.
Chapter 7 - Fundamentals of Biological Treatment
Attached Growth Biological WW treatment Systems
Water Testing APES.
Water Testing APES.
Wastewater Treatment.
Wastewater Treatment.
BioE 411 and AE/CE/BRT 511 Wastewater treatment.
Wastewater Treatment.
CTC 450 Review Preliminary & Primary Treatment Measure flow Screen
Dissolved Oxygen and Biochemical Oxygen Demand Analyses
Stabilization Ponds for Wastewater Treatment
CTC 450 Review WW Systems Operations.
Individual Household Treatment Systems (Septic Tanks)
Wastewater Treatment.
DTF TREATMENT PROCESSES
Wastewater Treatment Secondary Treatment.
Wastewater Treatment Secondary Treatment.
Wastewater Treatment.
Wastewater Treatment.
Presentation transcript:

WASTE STABILIZATION POND (WSP)

Advantages:Simplicity simple to construct simple to construct simple to operate and maintain simple to operate and maintain only unskilled labour is needed only unskilled labour is needed

Low Cost cheaper than other wastewater treatment processes cheaper than other wastewater treatment processes no need for expensive equipment no need for expensive equipment High Efficiency BOD removals > 90% BOD removals > 90% Total nitrogen removals is 70-90% Total nitrogen removals is 70-90% Total phosphorus removal is 30-45% Total phosphorus removal is 30-45% Efficient in removing pathogens Efficient in removing pathogens

Types of WSP Anaerobic pond Anaerobic pond Facultative pond Facultative pond Maturation pond Maturation pond

Anaerobic Pond 2-5 m deep 2-5 m deep Receive high organic loading (usually > 100 g BOD/m 3 d) – contain no dissolved oxygen and no algae Receive high organic loading (usually > 100 g BOD/m 3 d) – contain no dissolved oxygen and no algae Primary function is BOD removal Primary function is BOD removal Retention times are short (e.g. 1 day) Retention times are short (e.g. 1 day)

Facultative Pond 1-2 m deep 1-2 m deep Two types: Two types: 1. Primary Facultative Pond 1. Primary Facultative Pond – receive raw wastewater. – receive raw wastewater. 2. Secondary Facultative Pond 2. Secondary Facultative Pond – receive settled wastewater – receive settled wastewater (e.g. effluent from anaerobic pond) (e.g. effluent from anaerobic pond) The primary function is the removal of BOD The primary function is the removal of BOD

3 zone exist: A surface zone where aerobic bacteria and algae exist in a symbiotic relationship. The algae provide the bacteria with oxygen and the bacteria provide the algae with carbon dioxide. A surface zone where aerobic bacteria and algae exist in a symbiotic relationship. The algae provide the bacteria with oxygen and the bacteria provide the algae with carbon dioxide. An anaerobic bottom zone in which accumulated solids are decomposed by anaerobic bacteria. An anaerobic bottom zone in which accumulated solids are decomposed by anaerobic bacteria. An intermediate zone that is partly aerobic and partly anaerobic in which the decomposition of organic wastes is carried out by facultative bacteria. An intermediate zone that is partly aerobic and partly anaerobic in which the decomposition of organic wastes is carried out by facultative bacteria.

Maturation Pond m deep m deep Receive the effluent from a facultative pond Receive the effluent from a facultative pond Primary function is the removal of pathogens Primary function is the removal of pathogens

BOD Removal in anaerobic ponds BOD removal is achieved by sedimentation of settleable solids in anaerobic ponds BOD removal is achieved by sedimentation of settleable solids in secondary facultative ponds that receive settled water (anaerobic pond effluent), the remaining non-settleable BOD is oxidized by heterotrophic bacteria in secondary facultative ponds that receive settled water (anaerobic pond effluent), the remaining non-settleable BOD is oxidized by heterotrophic bacteria in primary facultative ponds (receive raw wastewater), the above functions of anaerobic and secondary facultative ponds are combined in primary facultative ponds (receive raw wastewater), the above functions of anaerobic and secondary facultative ponds are combined in maturation ponds only a small amount of BOD removal occurs in maturation ponds only a small amount of BOD removal occurs

Pathogen Removal Bacteria Faecal bacteria are mainly removed in facultative and especially maturation ponds Faecal bacteria are mainly removed in facultative and especially maturation ponds The principal mechanism for faecal bacteria removal are: The principal mechanism for faecal bacteria removal are: 1- Time and temperature - Faecal bacteria die-off in ponds increase - Faecal bacteria die-off in ponds increase with both time and temperature with both time and temperature 2- High pH 2- High pH - Faecal bacteria (except Vibrio Cholerae) die - Faecal bacteria (except Vibrio Cholerae) die very quickly (within minutes) at pH>9 very quickly (within minutes) at pH>9 3- High light intensity 3- High light intensity - Light of wavelength 425 – 700 nm can - Light of wavelength 425 – 700 nm can damage faecal bacteria damage faecal bacteria

Design of WSP 1. Anaerobic Pond Volumetric BOD loading (g/m 3 d) Volumetric BOD loading (g/m 3 d) (1) (1)Where Li = influent BOD, mg/L (=g/m 3 ) Li = influent BOD, mg/L (=g/m 3 ) Q = flow, m 3 /d Q = flow, m 3 /d = anaerobic pond volume, m 3 = anaerobic pond volume, m 3

should lie between 100 and 400 g/m 3 d should lie between 100 and 400 g/m 3 d to maintain anaerobic conditions to avoid odour release The mean hydraulic retention time (HRT), t a (day) is determined from: The mean hydraulic retention time (HRT), t a (day) is determined from: (2) (2)

Design values of permissible volumetric loading on and percentage BOD removal in anaerobic ponds at various temperatures Temperature ( o C) Volumetric loading (g/m 3 d) BOD removal(%) < – 2020T – 1002T + 20 > *

2. Facultative Ponds Surface BOD loading ( s, kg.ha d) Surface BOD loading ( s, kg.ha d) (3) (3)where Af = facultative pond area, m 2 s = 10LiQ/Af

The permissible BOD loading, s max The permissible BOD loading, s max s max = 350 (1.107 – 0.002T) T (4) s max = 350 (1.107 – 0.002T) T (4)

Once a suitable value of s has been selected, the pond area is calculated from equation (3) and its retention time (t f, day) from: Once a suitable value of s has been selected, the pond area is calculated from equation (3) and its retention time (t f, day) from: t f = A f D/Q (5) t f = A f D/Q (5) Where Where D= pond depth, m D= pond depth, m Q= wastewater flow, m 3 /day Q= wastewater flow, m 3 /day

3. Maturation Ponds (a) Faecal Coliform Removal The resulting equation for a single pond is: Ne = Ni / (1 + k T t) (6) Ne = Ni / (1 + k T t) (6)

Where Ne =number of FC per 100 mL of effluent Ni =number of FC per 100 mL of influent k T =first order rate constant for FC removal, per day t =retention time, day

for a series of anaerobic, facultative and maturation ponds, equation (6) becomes: --- (7) --- (7) Ne and Ni now refer to the numbers of FC per 100 mL of the final effluent and raw wastewater

The value of k T is highly temperature dependent. The value of k T is highly temperature dependent. k T = 2.6 (1.19) T (8) k T = 2.6 (1.19) T (8)

Check the BOD effluent concentration, le Check the BOD effluent concentration, le (9) (9)Where le =BOD effluent concentration, mg/L li =BOD influent concentration, mg/L K 1 = first order rate constant for BOD removal, per day removal, per day t = retention time, day

The value of K 1 is highly temperature dependent The value of K 1 is highly temperature dependent (10) (10)where K 20 o C = 0.3 per day and K 20 o C = 0.3 per day and  = 1.05  = 1.05

For n ponds in series, BOD effluent can be calculated as follows (11) (11)

Example Design a waste stabilization pond to treat 10,000 m 3 /day of a wastewater which has a BOD of 350 mg/L and 1x10 8 FC per 100 mL. The effluent should contain no more than 1000 FC per 100 mL and 20 mg/L BOD. The design temperature is 18 o C.

Solution (a) Anaerobic Ponds From Table the design loading is given by: = 20T–100 = (20 x 18)-100 = 260 g/m 3 d = 20T–100 = (20 x 18)-100 = 260 g/m 3 d The pond volume is given by equation (1) as: = L i Q/ = 350 x 10,000/260 = 13,462 m 3

The retention time is given by equation (2) as: = 13,462 /10,000 = 1.35 day = 13,462 /10,000 = 1.35 day The BOD removal is given in Table as: R = 2T + 20 = (2 x 18) + 20 = 56 percent

(b) Facultative Ponds The design loading is given by equation (4) as: s max = 350 (1.107 – 0.002T) T-25 s max = 350 (1.107 – 0.002T) T-25 = 350 (1.107 – 0.002T) T-25 = 350 (1.107 – 0.002T) T-25 = 350[1.107 – (0.002 x 18)] = 350[1.107 – (0.002 x 18)] = 216 kg/ha d = 216 kg/ha d

Thus the area is given by equation (3) as: A f = 10 x 0.44 x 350 x 10,000/216 A f = 10 x 0.44 x 350 x 10,000/216 = 71,300 m 2 = 71,300 m 2 s = 10LiQ / Af

The retention time is given by equation (5) as: t f = A f D/Q t f = A f D/Q Taking a depth of 1.5 m, this becomes: t f = 71,300 x 1.5/10,000 t f = 71,300 x 1.5/10,000 = 10.7 day = 10.7 day

(c ) Maturation Ponds Faecal Coliform Removal For 18 o C the value of k T is given by equation (8) as: k T = 2.6 (1.19) T-20 = 2.6(1.19) -2 = 1.84 day -1

The value of N e is given by equation (7): Taking t m = 7 days, this becomes: For n = 1, N e = > 1000 FC/100 mL For n = 2, N e = 7201 > 1000 FC/100 mL For n = 3, N e = 518 < 1000 FC/100 mL, OK

For a depth of 1.5 m, the area of the maturation pond is For a depth of 1.5 m, the area of the maturation pond is A m = Q t m /D A m = Q t m /D = 10,000 x 7/1.5 = 10,000 x 7/1.5 = 46,667 m 2 = 46,667 m 2

BOD Removal Anaerobic Pond: l e = 0.44 x 350 mg/L = 154 mg/L Facultative and Maturation Pond: = 1.6 mg/L