Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.

Slides:



Advertisements
Similar presentations
DS-01 Disaster Risk Reduction and Early Warning Definition
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Baffinland Mary River Project Environmental Assessment Methods Marine Environment VECs Workshop Session 02 November 2011.
Environment Canada Presentation to Nunavut Impact Review Board Regarding Baffinland Mary River Project NIRB Prehearing Conference Pond Inlet and Igloolik,
Carolyn Dunn Environmental Assessment Division Healthy Environments Consumer Safety Branch Health Canada High Lake Mine Pre-Hearing Conference December.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
BoRit Superfund Site Timeline
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October Team Members: –EBA.
Mary River Project Early Revenue Phase NPC Oral Hearings January 2014.
Baffinland Iron Mines Mary River Project November Pre-Hearing Conference Igloolik & Pond Inlet.
Hydrogeology, High Lake Rob Dickin Hydrogeologist, GLL.
NUNAVUT IMPACT REVIEW BOARD Targeting Increased Effectiveness in a Changing Landscape Nunavut Mining Symposium, Iqaluit, April 17, 2012.
Baffinland Iron Mines Mary River Project November 2011 Community Round-Table Igloolik and Pond Inlet.
Climate Change and Future Scenarios in the Arctic A Canadian Perspective Venezia, December 2014.
CLIMATE CHANGE AND POTENTIAL IMPACTS ON GREAT LAKES WATER LEVELS WHAT CAN WE DO? Chicago, Illinois March 30, 2001 Presentation By: Wayne A. Smith Vice-President.
Where IOOS Meets the Land and Atmosphere: Assessing/Mitigating Risks of Current & Prospective Coastal Inundation/Erosion Alaskan Coastal Climatology Workshop.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
Kiggavik Project Final Hearing Presentation
Emergency Response & SAR. Project Infrastructure Steensby Infrastructure Ore dock and freight dock Fuel depot – 160 ML Arctic diesel – 50 ML Marine diesel.
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
Inuit Qaujimajatuqangit. Traditional knowledge –Selection based on: same as archaeology boundary Kugluktuk traditional area travel routes Nunavut - NWT.
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
ECLAC Disaster Assessment ECLAC Disaster Assessment Training Manual Section V (ii) Coastal Engineering: Reconstruction – Management and Mitigation.
Overview of NLCA (b) Igloolik & Pond Inlet November 2011.
Natural Resources Canada : Regulatory Responsibilities Mineral Advisory Group Meeting (MDAG) Newmont Mining Corporation Doris North Project / Phase II.
CCIC Workshop Whitehorse January, 2012 LOOKNorth : Investing in remote sensing in a changing Northern Canada.
MMS Alternative Energy Program November 28, 2007.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Presentation to Final Hearing Baffinland Iron Mines Corporation Mary River Project Type A Water Licence Application Nunavut Water Board Final Hearing Pond.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
NIRB Hearings Cumberland Resources Ltd Meadowbank Gold Project: NRCan Technical Review of the FEIS March 27-31, 2006.
Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
NRCan’s Expertise Geohazards (earthquakes, landslides etc.) Geoscience (marine and coastal geology, and landscape processes, groundwater etc.) Permafrost.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Division of Technology, Industry, and Economics Economics and Trade Branch SESSION 7 - How to do Integrated Assessment Stage D: Issuing policy recommendations.
NOAA Climate Goal/Climate Program Arctic Workshop Meeting February 2-3, 2005 John Jensen National Climatic Data Center.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
KNK5 wmoEp5 vtmp5 GwmoEp5H kNo1k5 ne6tbw5 ckE5]giz “A” wm6j5 Mwnodt5 W5J]y5 b5hjz X=8M8 xwC8 s/C4ys6t5 fxS]En8 GX=8M8f5H k9]l/4 WoExz Community Session.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
1 Formulate Alternatives Planning Step 5. 2 Social Science Activities in Land Use Planning Planning Steps Social Science Activities Steps 1 & 2: Identify.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Doris North Gold Mine Project Presentation to the Nunavut Water Board Technical Meeting Cambridge Bay, NU January 28-29,
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Phase 2 Hope Bay Belt Project
Kitikmeot Inuit Association
COMMISSION FOR HYDROLOGY (CHy)
Phase 2 Hope Bay Belt Project
Meadowbank Water License Renewal
Mary River Project Phase 2 Proposal
Mary River Project Phase 2 Proposal Cumulative Effects
Mary River Project Phase 2 Proposal Atmospheric Environment
Mary River Project Phase 2 Proposal Freshwater Environment
Mary River Project Phase 2 Proposal
Mary River Project Phase 2 Proposal Marine Environment
Ontario Presentation to the NEB Modernization Expert Panel
WHALE TAIL PIT Expansion Project
WHALE TAIL PIT Expansion Project
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011

Outline 1.Mandate & role 2.Technical Review Recommendations  Earth sciences 3.Questions

NRCan’s Mandate Natural Resources Canada (NRCan) seeks to enhance the responsible development and use of Canada’s natural resources and the competitiveness of Canada’s natural resources products.

NRCan’s Role in this review  Regulatory role – Explosives Act  Earth sciences expertise:  Permafrost and Geotechnical Science  Coastal Geomorphology, Climate Change  Geotechnical Engineering and Natural Hazards

Technical Review Recommendations - Permafrost and Geotechnical Science  NRCan provided 12 recommendations regarding:  Maintaining waste rock pile frozen conditions  Modelling to ensure a permafrost barrier the diversion berms  Railway terrain analyses  Environmental monitoring and management methods for the railway corridor

Technical Review Recommendations - Coastal Geomorphology  NRCan provided 27 recommendations regarding:  Coastal change due to ship wake  Climate change impacts on coastal infrastructure  Slope and permafrost information for Milne port and subsea permafrost presence at Steensby port  Shoreline change information regarding the Milne Port freight dock effects on Philips Creek spit

Technical Review Recommendations - Geotechnical Engineering and Natural Hazards  NRCan provided 7 recommendations regarding  Waste rock pile – sludge volume, stability, post-closure monitoring  Railway tunnel early warning systems during rockfall events  Spill contingency plans for borrow pits

Baffinland Iron Mine Corporation (BIMC) Commitments  BIMC’s commitments (October 28, revised November 4) address 28 of NRCan’s 46 recommendations  NRCan and BIM met on Oct. 20, 2011 to discuss specific recommendations related to primarily to wake effects and sediment movement at Milne Port

NRCan Outstanding Recommendations NRCan would like to clarify certain BIMC commitments made during the technical meetings, e.g., Ship wake assessment Hydrodynamic and sediment transport models NRCan can continue to work with BIMC to discuss and resolve technical issues identified in commitments, e.g.: Permafrost and the design approach for the waste rock pile Remote sensing of bottom-fast ice Existence of subsea permafrost Estimates of sea level rise

Recommendations Not Fully Resolved: Wake Effects and Coastal Change  Clarification of the location of the proposed Eastern Shipping Route between Koch Island and Cape Jensen (#14).  Upon final decision on the vessels forming the ore transport fleet and the chartered freight vessels, the modelled potential wake characteristics (# 16).  NRCan’s recommendations seek an explanation why the route between Koch Island and Cape Jensen was modelled for wake effects, instead of the narrower passage to the north and why a shorter distance was not used, given that ships may travel closer to the shore.

Recommendations Not Fully Resolved: Coastal Change  Installation of permanent year-round wave gauges to measure natural and wake-influenced waves in open water and sea ice (#18).  NRCan is looking for the FEIS to describe approach to wave gauges in the Marine Mammal and Shipping Management Plan.  Consultation with NRCan experts in remote sensing towards a determination of bottom-fast ice extents and the potential existence of subsea permafrost in Milne and Steensby Inlets (#36).  A similar commitment related to the pack ice baseline could be amended to address NRCan’s recommendation.

Unresolved Recommendations: Waste Rock Pile and Thermal Analysis  Five recommendations (#1-5) concern demonstrating that frozen conditions will be maintained within and beneath the waste rock pile:  Preliminary thermal analysis  Collection of site data for thermal analysis in final design  Incorporation of climate conditions, change and variability  Long-term (100+ years) prediction of frozen conditions  Development of monitoring and mitigation/ management plans, criteria for selection of mitigation measure in FEIS

Unresolved Recommendations: Waste Rock Pile and Thermal Analysis  Two recommendations (#40,41) for long-term stability of the waste rock stockpile:  Volume of sludge and distribution  Influence on thermal regime and stability of stockpile adjacent to SWM pond  Further discussions planned on the approach to determining the active layer for the waste rock pile and rationale in the FEIS (in consultation with NRCan, EC and AANDC).  Commitment (#108) considered for thermal modelling as part of detailed design should be confirmed in FEIS.

Qujannamiik!