ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.

Slides:



Advertisements
Similar presentations
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
Advertisements

NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
SNuMI: Phase I & Phase II Nancy Grossman Phase I: $33.4M FY06$ (no contingency, no G&A) 41% contingency Phase II: $53.7M FY06$ (no contingency, no G&A)
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
January 4, 2007 RHIC II Project Internal Cost Review Gary McIntyre RHIC Ring Modifications January 4, 2007 Project Overview.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Fermilab 1 SNUMI Civil Issues September 18, 2006Dixon Bogert SNUMI Civil Design & Site Considerations; Issues and FESS work Dixon Bogert SNUMI Meeting,
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
Director ’ s Review of the Project X Cost Range Estimate: Conventional Facilities Project X Director’s Review March 16, 2009.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Update on the PSB Cooling and Ventilation Systems
CBETA Technical Review
News and brief overview of Beamline plans for the next few months
Presentation transcript:

ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems2 Overview Overall Scope Recycler –Scope –Technical Main Injector –Scope –Technical NuMI –Scope –Technical Associated Cooling Pond Loads Costs Risk and Mitigations Review of CDR Recommendation

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems3 ANU Cooling Systems Scope All cooling systems are intertwined with each of the machines –For these tasks, no clear way to delineate Either by machine supported Or by system boundaries –Addressed in ANU by machine supported

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems4 ANU Cooling Systems Scope Recycler –WBS , Main Injector –WBS , , NuMI –WBS , Associated Cooling Pond Loads –Addressed within the other tasks Manager for all of these systems

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems5 ANU Cooling Systems Scope Progress since Director’s Review, June 2007 Reduced estimates for most NuMI Cooling Systems –Installation of new air handling and dehumidification equipment at MI-65 and Target Hall by FESS –Better definition of expected needs for NuMI Cooling Systems –Both items reduced expected loads on NuMI Chilled Water and LCW Systems, simplifying needs for system upgrades MI and RR requirements remain virtually unchanged

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems6 Recycler Scope Recycler Injection Line and MI-14 Service Building Abort Line and MI-39 Service Building RF Cavities Extraction Line MI-8 Pump Room

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems7 Recycler Modifications Injection Line & MI-14 Service Building –Beam line magnets –Flourinert skids for kickers –Power supplies in MI-14 –Estimated additional 65kW, 50gpm load to MI Global LCW System Extraction Line & MI-30 Service Building –Beam line magnets –Flourinert skids for kickers –Power supplies in MI-30 –Estimated additional 76kW, 60gpm load to MI Global LCW System

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems8 Recycler Modifications (cont.) Abort Line & MI-39 Service Building –Beam line magnets –Flourinert skids for kickers –Power supplies in MI-39 –Estimated additional 65kW, 50gpm load to MI Global LCW System RF Cavities & MI-60 Service Building & Pump Room –RF cavities –Power supplies in MI-60 –Estimated additional 270kW, 457gpm load –Current MI-60 95° & 55° RF Cavity LCW systems able to accommodate additional load

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems9 Recycler Modifications (cont.) MI-8 Pump Room Outfitting –Q-100 region LCW already near capacity –Additional heat and hydraulic loads of Injection Line and MI-14 may mandate addition of outfitting of MI-8 Pump Room –Originally planned in initial MI LCW Systems Dedicated room in MI-8 already exists Includes piping to PV-9 Pond Vault, electrical service w/ MCU’s –Biggest hurdle: PV-9 Pond Water lines also connected to MI-62 for NuMI LCW, which are already operating at capacity

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems10 Recycler Modifications (cont.) Associated Cooling Pond Loads –Numerous small increases around the ring –Minimal in comparison to the MI Associated CUB ICW Loads –Due to increased loads on MI-60 55°F LCW System –Current operation is at roughly one-half designed capacity –Original design should be sufficient

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems11 Recycler Modifications (cont.) Recycler LCW Loads due to ANU Modifications System Component Anticipated Flow, gpm Anticipated Load, kW Affected System Injection Line & MI-14 Service Building Global MI LCW Extraction Line & MI-30 Service Building Global MI LCW Abort Line & MI-39 Service Building Global MI LCW MI-8 Pump Room Global MI LCW Total

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems12 Recycler Modifications (cont.) Recycler LCW Loads due to ANU RF Cavity Modifications System Component Anticipated Flow, gpm Anticipated Load, kW Affected System RF Cavities & MI-60 Service Building MI-60 RF LCW 1 1 – Includes additions to both 55°F and 95°F LCW Systems combined

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems13 Main Injector Scope Main Injector General: Minor Magnet/Component Changes Global Heat Load Increase (approx. 25%) Associated Increases to Cooling Ponds RF Cavities

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems14 Main Injector Modifications RF Cavities & MI-60 Service Building & Pump Room –2 RF cavities in Q-600 straight section –Power supplies in MI-60 –Some current MI beamline components come out –Estimated additional 177kW, 259gpm load –Current MI-60 95° & 55° RF Cavity LCW systems able to accommodate additional load Minimal magnet & component changes otherwise General Heat Load Increase to Global LCW System –25% for magnets –37% for power supplies

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems15 Main Injector Modifications (cont.) Associated Cooling Pond Loads –Approximately 25 to 30% increase in heat loads to ponds –Primarily due to MI cycle changes, and that increased heat load into the MI Global LCW System –Numerous additions and subtractions otherwise From both RR and NuMI Minimal in comparison to the MI loads Associated CUB ICW Loads –Due to increased loads on MI-60 55°F LCW System –Current operation is at roughly one-half designed capacity –Original design should be sufficient

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems16 Main Injector Modifications (cont.) Main Injector LCW Loads due to Global ANU Power Increase 1 System Component Current Load, kW Scaling Factor Anticipated Load, kW LCW Pumps Magnets Power Supplies Totals Assumes Global LCW System flows are maintained at current levels 2 - Dave Harding 3 - Dan Wolff

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems17 Main Injector Modifications (cont.) Main Injector LCW Loads due to ANU RF Cavity Modifications System Component Anticipated Flow, gpm Anticipated Load, kW Affected System RF Cavities & MI-60 Service Building MI-60 RF LCW 1 1 – Includes additions to both 55°F and 95°F LCW Systems combined

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems18 NuMI Scope NuMI Absorber Hall Decay Pipe Downstream RAW Hadron Absorber RAW & Intermediate NuMI Sump Water MI-62 Service Building NuMI LCW MI-65 & Target Hall Target RAW Horn 1 & 2 RAW Decay Pipe Upstream RAW CUB ICW for MI-65 NuMI Extraction Line MI Global LCW

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems19 NuMI Modifications NuMI Extraction Line: –MI Global LCW and MI-62 NuMI LCW MI-65 & Target Hall –CUB ICW –Target RAW –Horns 1 & 2 RAW –Piping for Horn 2 relocation –Decay Pipe Upstream RAW –Target Chase cooling & dehumidification Currently in process of being modified as off-project upgrade

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems20 NuMI Modifications (cont.) Absorber Hall –Decay Pipe Downstream RAW –Hadron Absorber RAW & Intermediate –NuMI Sump Water Associated Cooling Pond Loads –Minimal increase, if any, at MI-62 Associated CUB ICW Loads –Due to additional MI-65 loads –Original design should be sufficient

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems21 NuMI Modifications (cont.) NuMI Modifications – Planned Upgrades: –All systems will receive upgrades to instrumentation –Some will also receive upgrades to pumps, heat exchangers, misc. components –BoE’s list costs accordingly

October 23-25, 2007 CD-2/3a DOE Review Karl Williams, ANU Cooling Systems 22 ANU Cooling Systems Pond Water Cooled Systems Thru MI-62

October 23-25, 2007 CD-2/3a DOE Review Karl Williams, ANU Cooling Systems 23 ANU Cooling Systems Secondary Chilled Water Cooled Systems at MI-65

October 23-25, 2007 CD-2/3a DOE Review Karl Williams, ANU Cooling Systems 24 ANU Cooling Systems NuMI Ground Water Cooled Systems at MINOS Absorber Area

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems25 Associated Cooling Pond Loads Main Injector Loads –Approximately 25 to 30% increase in heat loads to ponds –Primarily due to MI cycle changes, and that increased heat load into the MI Global LCW System Numerous additions and subtractions otherwise –From both RR and NuMI –Minimal in comparison to the MI loads –NuMI Loads Minimal increase, if any, at MI-62 –Recycler Loads Numerous small increases around the ring –RF Loads at MI-60 Overall, components removed may balance out with those added

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems26 Associated Cooling Pond Loads (cont.) Pond Water Loading Studies –Performed by S. Krstulovich, November 2006 –Computer model, normalized to our actual operational conditions –Indicate an even 25% global increase in pond heat loads will increase operational temps by about 1°F –Modeling may easily be repeated as requirements become better defined and understood Conclusion: –Current MI Cooling Ponds are probably sufficient

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems27 Associated Cooling Pond Loads (cont.) Pond Water Loading Studies – Conclusion Expounded –Currently, there are 6 to 8 weeks of the summer where the ponds warm to the extent that they cannot cool the MI LCW systems sufficiently for them to maintain a 90degF operational setpoint. During these periods, the ponds warm to around 90degF themselves. When this happens, the 3-way temperature control valves wind up sitting 100% open, calling for even more cooling than the pond waters can provide, and the LCW Supply temperatures slowly climb to the 95 to 100F range. –It is suspected that the increase in heat loads could extend this period to a length of 10 to 12 weeks, although more exact analysis is not currently available.

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems28 Associated Cooling Pond Loads (cont.) Pond Water Loading Studies - References: –NOVA Document 1573-v3, MI LCW and Pond Water Temperature Studies, Karlton E. Williams –NOVA Document 1895-v1, MI Pond Water Modeling for ANU Increased Heat Loads, Stephen F. Krstulovich

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems29 Cost Overview Recycler & MI Cooling Systems (Fully Burdened FY07 $) RR Contingencies higher due to MI-8 pump & component outfitting not yet determined

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems30 Cost Overview NuMI Decay Pipe /Hadron Absorber/Utilities (Fully Burdened FY07 $) Higher contingencies are appropriate for level of design

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems31 Risk and Mitigations Reviews –Initial Design Review: Before engineering of mods begins, to review full system requirements –Final Design Review: Before procurement begins, to review finalized designs before procurement and construction L2 milestones in place for all Cooling Systems at completion of Accelerator Upgrades shutdown tasks Risks –MI-8 Pump Room outfitting –PV-9 Pump Vault upgrades –Standard manpower issues (NOvA-doc-1446)

October 23-25, 2007 CD-2/3a DOE ReviewKarl Williams, ANU Cooling Systems32 Relevant Recommendations from SNuMI Review (11/2006) 2.1.4NuMI Upgrades It would be prudent to plan any Phase I work in a manner that does not necessitate undoing and/or repeating it for Phase II. This is particularly true for RAW (Radioactive Water) systems. Status: Complete We will make estimates of the demands on the water systems for upgrades beyond the first phase of the upgrade. This will be considered during the scheduled design reviews of the water systems. Engineering of all cooling systems will be accomplished in such a manner as to keep abreast of the latest project information.