GAR General Storm Water Permit for Industrial Activity

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Multi-Sector General Permit Preparing a Stormwater Pollution Prevention Plan DEC Stormwater Section Christy Witters & Christina Hutchinson
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
NDEQ Industrial Storm Water General Discharge Permit Presentation for: Nebraska Aviation Symposium January 27, 2011 By: Bill Imig, Environmental Scientist.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Developing a Stormwater Pollution Prevention Plan (SWPPP)
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
Effective October 1, 2011 New Connecticut General Permit for the Discharge of Stormwater Associated with Industrial Activity October 5, 2010 Connecticut.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Storm Water Regulation: What’s Next? Presented to: September 30, 2014.
Collecting a Stormwater Sample Annual CMTA Marine Trades Exposition October 5, 2010.
Central Massachusetts Regional Stormwater Coalition Part 5 Standard Operating Procedures September 26, 2013 Community Innovation Challenge Grant 2013.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
2014 Industrial General Permit Summary of Key Updates Order DWQ Sandy Mathews August 19, 2014.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
Building Green in Bowling Green
Env 247 Overview of Stormwater Management March 1, 2011.
BEING READY FOR AN INSPECTION No matter when the inspector shows up.
Statewide Basic Requirements for Stormwater. New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development,
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Pollution Prevention and Good Housekeeping Activities for Municipal Operations Developing the Storm Water Pollution Prevention Plan Presenter: Keith Noble,
Applying for the VT Multi-Sector General Permit
MDOT Storm Water Management Plan Module 3: Maintenance Considerations Together… Better Roads, Cleaner Streams.
NPDES Compliance. NPDES Water Quality Issues for the Precast Concrete Industry.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Storm Water Pollution Prevention Training
Expedited Settlement Offer Worksheet Deficiencies Form
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Effective October 1, 2010 New Connecticut General Permit for the Discharge of Stormwater Associated with Industrial Activity August 18, 2009 Connecticut.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Filtration Observations in the Carver County WMO West Metro Water Alliance May 25, 2011 (Thanks to Kristen Larson, Carver County)
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Test Your Storm Water Knowledge!
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Part 2 - What is a SWPPP? Preventing Stormwater Pollution at Your Public Works Facility: A 5-Part Workshop Series.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Storm Water Permit Program Authority to regulate storm water discharges derives from 40 CFR Illinois EPA is delegated authority to administer this.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
2012 Industrial Stormwater General Permit Modification Presented by: Jeff Killelea Department of Ecology Moderated.
Pollution Control: For Field Office Construction Sites.
Documenting Self Inspections The City of Hendersonville Department of Public Works Erosion Control Self Inspection Form Power Point Presentation.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
Stormwater Pollution Prevention Program Compliance
Storm Water Pollution Prevention Plan Development
STORMWATER MANAGEMENT
Stormwater Pollution Prevention Plans
Taking a Dip in Your SWPPP
MS4 OVERVIEW 2015.
Stormwater Construction General Pemit (CGP) TXR150000
VPDES Industrial Stormwater General Permit
Presentation transcript:

GAR050000 General Storm Water Permit for Industrial Activity Status of the Construction Aggregates Industry

General Permit No.GAR050000 Authorization to Discharge Under the National Pollutant Discharge Elimination System Storm Water Discharges Associated with Industrial Activity Replaces General Permit No. GAR000000 Approximately 100 quarries/mines, 220 concrete plants, and 60 asphalt plants have applied for coverage

General Permit No.GAR050000 So what has changed? The Permit’s format has been revised to be organized similar to EPA’s 2008 Multi-Sector General Permit (MSGP).  There are new sector specific requirements, benchmarks, and best management practices (BMPs) Smoke/Dye Testing are required at least once during the permit period.  All drains including floor drains and sinks in industrial areas must be tested and documented in the Annual Report.

General Permit No.GAR050000 So what has changed? There are new SWPPP requirements and a corresponding checklist that must be submitted with the Annual Report. There are new requirements for the SWPPP site map. SWPPPs are required to specifically address vehicle and equipment washing as any discharge associated with these operations are not authorized and may require a separate permit.

General Permit No.GAR050000 So what has changed? All employees working within areas where industrial materials or activities are exposed to storm water must be trained. EPD’s recommendation is training at time of hire and retrained at least annually. Rosters and training dates are required to be maintained within the SWPPP or be readily available onsite. 

General Permit No.GAR050000 In effect since June 1, 2012 Monitoring requirements started during the first full quarter following the effective date July 1 until September 30 The next quarter ran from October 1 until December 31, 2012 Two quarters have passed, and we’re in the third. . . where are we as an industry?

General Permit No.GAR050000 Statistics of GCAA Member Sites (Crushed Stone): No. of Sites Covered Under IGP – 58 No. of SW Outfalls – 146 Average of about 2.5 per site No. of SW Outfalls with No Discharge – 84 About 58% have not discharged No. of Benchmark Samples Collected – 107 No. of Samples Over Benchmark – 21 About 20% No. of Dye/Smoke Tests Completed - 0

Review of Monitoring Requirements General Permit No.GAR050000 Review of Monitoring Requirements

General Permit No.GAR050000 Quarterly Visual Assessments Benchmark Same as under previous permit Benchmark Annual Discharges from material storage piles Impaired Streams

General Permit No.GAR050000 Measurable storm event: Sample Type Greater than 0.1” of rain that results in an actual discharge from the facility Follows the preceding measurable storm event by at least 72 hours Sample Type Samples are to be collected within first 30 minutes of discharge (or as soon as practical with documentation maintained in SWPPP of why it was not possible to collect during initial 30 minutes.) During normal operating hours

General Permit No.GAR050000 Quarterly Visual Assessment Once per quarter for entire term of permit Visually inspect for: color, odor, turbidity, floating solids, settled solids, suspended solids, foam, oil sheen, and other indicators of storm water pollution. Document results, perform and document corrective actions as indicated by results according to the schedule in the IGP.

General Permit No.GAR050000 Benchmark Monitoring Requires laboratory analysis of the sample. Benchmarks serve as “levels of concern” for storm water sampling. Benchmarks are not permit limits, therefore an exceedance is not a permit violation. Primarily for permittee’s use to determine the overall effectiveness of the control measures and to determine if corrective actions are needed.

General Permit No.GAR050000 However, when a benchmark is exceeded, the permittee must: Review the control measures, make necessary modifications, and document according to schedule in IGP. Continue to sample each quarter until the benchmark is met or it is determined that no further pollutant reduction is feasible . . . Notify EPD of your determination in the annual report

General Permit No.GAR050000 Impaired Streams Monitoring Definition: A stream with chronic or recurring monitored violations of the applicable numeric and/or narrative water quality criteria. Applicable to discharge into or within one linear mile upstream of, and in the same watershed as, any portion of an impaired stream segment Twice per quarter for first year of permit. If 75% or the average pass the benchmark value, then annual monitoring. If not, select and implement additional BMPs (up to one year) Re evaluate by twice per quarter sampling for additional year

General Permit No.GAR050000 Benchmark Monitoring Case study #1: Details Storm water outfall from overburden area, roadway, and stockpile area Overburden area mostly stabilized with vegetation Sediment pond mostly reclaimed Pipe under road carries runoff from small depression beside road and stockpile area into sediment pond 191 mg/L TSS

Case Study #1 stockpiles road overburden sediment pond SW outfall pipe creek

General Permit No.GAR050000 Benchmark Monitoring Case study #1: Corrective Actions Pipe under road was fitted with elbow to turn depression into a basin Discharge pipe was wrapped with filter cloth and surrounded with W57s to filter sediment before discharge

Case Study #1 stockpiles road overburden sediment pond SW outfall Elbow on pipe creek

Case Study #1

Case Study #1

General Permit No.GAR050000 Benchmark Monitoring Case study #1: 7 mg/L TSS after corrective actions

General Permit No.GAR050000 Benchmark Monitoring Case study #2: Details Storm water from roadway to on-site customers Catch basins / filter berms along ditch line Runoff entered ditch at lowest point – just before discharge through pipe 438 mg/L TSS

Case Study #2 creek road catch basins / filter berms customer sites creek

General Permit No.GAR050000 Benchmark Monitoring Case study #2: Corrective Actions Catch basins / filter berms were cleaned out Runoff was diverted into ditch in selected locations Fresh filter stone was placed around pipe Riprap plunge pool / sediment basin was installed at end of pipe – sample collected before creek

Case Study #2

Case Study #2

Case Study #2

General Permit No.GAR050000 Benchmark Monitoring Case study #2: 24 mg/L TSS after corrective actions

General Permit No.GAR050000 Benchmark Monitoring Case study #3: Details Storm water from overburden and stockpile area adjacent to on-site customer Slopes were vegetated until new materials was stocked Discharge pipe installed with large holes in it 592 mg/L TSS

Case Study #3 storm water pond creek road overburden and stockpile storage catch basins / filter berms customer site creek

General Permit No.GAR050000 Benchmark Monitoring Case study #3: Corrective Actions Filter berms were installed in pond on either side of discharge pipe Fresh filter stone was placed around pipe

Case Study #3 filter berms storm water pond

General Permit No.GAR050000 Benchmark Monitoring Case study #3: 9 mg/L TSS after corrective actions

General Permit No.GAR050000 Benchmark Monitoring Case study #4: Details Storm water from roadway and stockpile area next to a scale house Adjacent to a creek buffer 418 mg/L TSS

Case Study #4 roadway creek road scale house catch basins / filter berms creek creek stockpiles

General Permit No.GAR050000 Benchmark Monitoring Case study #4: Corrective Actions Installed filter berm around discharge

Case Study #4 filter berms storm water pond

General Permit No.GAR050000 Benchmark Monitoring Case study #4: No discharge from outfall since corrective actions were taken.

General Permit No.GAR050000 “No Discharge” 1) No rainfall events that met definition of “measurable” 2) At least 72 hours since last measurable rain event 3) During normal working hours 4) That results in an actual discharge from the site.

General Permit No.GAR050000 Monitoring Exemptions “Substantially identical outfall” (if not discharging to imparted stream) may monitor just one outfall and report that results apply to the others as long as: Identified in storm water pollution prevention plan (SWPPP) with rationale for determination Similar industrial activities and control measures, exposed materials, and runoff coefficients of drainage basins. Inactive and Unstaffed Sites Maintain a statement onsite with SWPPP stating the site is inactive and unstaffed Begin benchmark monitoring as in first year if facility becomes active and/or staffed

General Permit No.GAR050000 Monitoring Documentation Recordkeeping For each monitoring event: Date and duration of the rainfall event Rainfall total (in inches) Time (in days) since previous measurable storm event or the absence of measurable precipitation in the 72 hours preceding the monitoring event Estimated volume (in gallons) of the discharge sampled Recordkeeping SWPPP, monitoring results, corrective actions, reports and other support info must be maintained for at least 3 years after expiration of permit.

General Permit No.GAR050000 Questions?